Forwards Insp Rept 50-400/87-39 on 871102-06.No Violations or Deviations Noted
ML18022A588
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/24/1987
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML18005A224 List:
References
NUDOCS 8712020329
Download: ML18022A588 (3)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM ( R IDS

)

ACCESSI(JN NBR: 8712020329 DOC. DATE: 87/11/24 NOTARIZED:

NO FACIL: 50-400 Shearon Harris Nuclear Pacer Planti Unit ii Carolina AUTH. NAME

  • UTHOR *FFILIATION HERDT. A. R.

Region 2I Ofc of the Director RECIP. NAME RECIPIENT AFFILIATION UTLEY> E. E.

Carolina Poeer.

5 Light Co.

SUBJECT:

ForUjards Insp Rept 50-400/87-39 on 871102-Ob. No violations or deviations noted.

DOCKET 05000400 DISTRIBUTION CODE:

IEOID COPIES RECEIVED: LTR J.

ENCL g SIZE: D F TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES: Application for permit renewal filed.

05000400 RECIPIENT ID CODE/NAME PD2-1, PD INTERN*L: AEOD NRR IMORI SSEAUr D NRR/DOEA DIR NRR/DREP/RPB NRR/PMAS/ ILRB OGC/HDS1 RES DEPY GI XTERNAL: LPDR NSIC

1

1

1

1

1

1

1 COPIES LTTR ENCL

1 REC IP lENT ID CODE/NAME BUCKLEYIB DEDRO NRR/DLPQ/PEB NRR/DREP/EPB NRR/DRIS DIR E

ERMANi J RGN2 FILE

NRC PDR COPIES LTTR ENCL

2

1

1

1

1

1

1

1

'1 TOT*L NUMBER OF COPIES REQUIRED:

LTTR

ENCL

ei Nov 248P Docket No. 50-400 License No. NPF-63 Carolina Power and Light Company ATTN:

Nr. E.

E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. 0.

Box 1551 Raleigh, NC 27602 Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NO. 50-400/87-39 This'efers to the Nuclear Regulatory Commission (NRC) inspection conducted by W. P. Kleinsorge on November-6, 1987.

The inspection included a review of activities authorized for your Harris facility.

At the conclusion of the inspection, the findings were discussed with those members of your staff identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report.

Mithin these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observation of activities in progress.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with Section 2.790 of the NRC's

"Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosure will be'laced in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely, Enclosure:

NRC Inspection Report cc w/encl:

(See page 2)

IjMa. 3~ +

ALAN Q. %ROr Alan R. Herdt, Chief Engineering Branch Division of Reactor Safety 8712020329 87ii24 PDR ADOCK 05000400

PDR

Carolina Power and Light Company cc w/encl:

R. A. Matson, Yice President Harris Nuclear Project D. L. Tibbitts, Director of Regulatory Compliance J. L. Willis, Plant General Manager bcc w/encl:

C. Barth, OGC NRC Resident Inspector A. Upchurch, Chairman, Triangle J Council of Governments Document Control Desk State of North Carolina R

MP le nso g

ll/fo 87 RI I)/k JJ lake 1 /f.'/87 RIQ g)P (

PFredreickson 11/gg/87