ML20134A601

From kanterella
Jump to navigation Jump to search
Discusses Encl H Harty,Bnwl Ltr & Resumes of Key Participants in long-term Review.Lauds Experience & Credentials of Participants.W/O Encl
ML20134A601
Person / Time
Site: 05000000
Issue date: 10/14/1982
From: Altman B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Harpster T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML17198A269 List: ... further results
References
FOIA-84-293 NUDOCS 8508150353
Download: ML20134A601 (1)


Text

__

~

~.

Y

)s-f.{gREc UNITED STATES l

oqjo NUCLEAR REGULATORY COMMISSION g/

g Q

WASHINGTON, D. C. 20555 g

.e

' ' +... *

  • OCT 141982 MEMORANDUM FOR:

Terry L. Harpster, Chief, Quality Assurance Branch Division of Engineering and Quality Assurance, IE FROM:

Bill Altman, Quality Assurance Branch, Division of Engineering and Quality Assurance, IE

SUBJECT:

RESUMES OF KEY PARTICIPANTS FROM PNL IN LTR The enclosed memo from Harold Harty of PNL is self-explanatory.

He is the PNL project manager for PNL's participation in the Long-Term Review (LTR).

I am impressed with the credentials and experience of the PNL participants.

PNL was quite interested in the LTR from a technical / scientific / engineering point of view, and they consciously offered some of their best people to work on it.

Harty, for example, is the senior technical advisor to the Manager of the Energy System Department, an organization of about 200 people.

I am pleased also with the collective breadth of the participants; one has a very strong professional QA background, another is an ME with extensive nuclear-related project management experience, and the third is a nuclear engineer with exper-

.ience in risk analysis and systems analysis.

I plan to hold a joint meeting with these folks and the EGSG participants in about three weeks to review and int.egrate the site visit assessment approaches they are now working on.

At this meeting we will discuss approaches to and contractor participation in other tasks to be performed as part of the LTR.

ff&-

Bill Altman Quality Assurance Branch Division of Engineering and Quality Assurance, IE Er. closure:

Memo, H. Harty to W. Altman, dated' October 4, 1982 8508150353 850703 PDR FOIA LEIGHTD84-293 PDR FoM 193 L/s76