IR 05000382/1981017

From kanterella
Jump to navigation Jump to search
Informs That Reponse Time for Notice of Violation Issued W/ IE Insp Rept 50-382/81-17 Has Been Extended to 811008
ML20010J036
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/15/1981
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 8109290530
Download: ML20010J036 (1)


Text

i pa r rrog[

,,

'

UNITED STATES 8, -

NUCLEAR REGULATORY CO,'AMISSION o

$

,E

REGION IV

4 611 RYAN PLAZA DRIVE, SUITE 1000

ARLINGTON, TEXAS 76011 g*****,d September 15, 1981 Docket No. 50-382/Rpt. 81-17

d '

I:

% c?

'

-

N (g>;AYJ-MEMORANDUM FOR: File m

c z. z 1,

FROM:

W. C. Seidle, Chief, Engineering Inspection Branch i4

SUBJECT:

IE INSPECTION REPORT NO. 50-382/81-17

-

On September 8,1981, Louisiana Power and Light Company reported to the Resident Reactor Inspector at Waterford, Unit 3 that they had internal distribution problems resulting in the subject inspection report not getting to the appropriate management personnel on time. These problems have been resolved. The required response time to the Notice of Violation attached to subject report has been extended to October 8,1981.

f L

W. C.

die, Chief Engineering Inspection Branch bec to DMB for dist.

bec dist. by RIV BC NRR/DHFS RRI-Waterford PM NRR/0LB JEGagliardo AE0D RAD ASMT BR Louisiana Div. of Rad. Control ELD RESEARCH IE File LPDR IE/RPRIB NSIC NRC PDR

$ ()I

-

fi si o gh8Tes! J!8?sig b

EMS,;i//

S PS3 RPB EIB IE DD-Rii

/

g/LDGilbert/nh REHall WACrossman GLMadsen WCSeidleJEGaglirdo JT flins f

9// /81 (N9//(,/81

/)q/81 9/15/81 9//[/81 9/h/81 9/rf/81

/

m_. _