U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
REGION IV
IE Inspection Report No. 50-382/80-35 Licensee:
Louisiana Power and Light Company 142 Delaronde Street New Orleans, Louisiana 70174 Facility: Waterford Steam Electric Station, Unit 3 Inspection at:
Taft, Louisiana Inspection Conducted:
December 16, 1980 - January 15, 1981
, //
b
/- 7I~ f/
n t :
_
G. L. Const4ble,' ienior Resident inspector Date
-
.
.
ff
/-7-f/
Reviewed by:
.
T. F. Westerman, Chief Oate Reactor Projects Section No. 1 Insoection Summary:
Inspection on December 16, 1980 - January 15, 1981 (Recort No. 50-382/80-35)
Areas Insoected:
Routine, announced inspection of:
(1) Overall Preoperational Test Program, and (2) Plant Tours.
The inspection involved 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> of direct inspection effort by one (1) NRC Resident Inspector.
Result:
No violations or deviations were noted in the areas inspected.
8108280 s1
__
..
.
.
DETAILS 1.
Persons Contacted T. K. Arming' an, lead Startup Engineer
- 0. 8. Lester, Plant Manager
- Present at exit interview.
In addition to the above supervisory personnel, the inspector held dis-cussions with various operations, construction, engineering, technical support, and administrative members of the licensee's staff.
2.
Plant Status Construction of the Waterford SES site is approximately 82% complete.
The current LP&L schedule indicates initial fuel loading during October 1982.
3.
Preocerational Test Program The purpose of this inspection effort was to observe the licensee's administrative controls over the test program.
The inspector attended various meetings and discussed the details of the startup test program with engineers, operators and supervisory personnel.
4.
Plant Tours During the course of the inspection, the IE inspector toured the Reactor Building, Fuel Handling Building, Turbine Building, and the Auxiliary Building to observe ongoing construction activities.
No violations or deviations were noted.
5.
Exit Interview The inspector met with the Plant Manager several times during the course of the inspection.
The scope of the inspection and the findings were discussed.