ML19350B641

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-382/80-35 on 801216-810115.No Noncompliance Noted
ML19350B641
Person / Time
Site: Waterford Entergy icon.png
Issue date: 01/28/1981
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Aswell D
LOUISIANA POWER & LIGHT CO.
Shared Package
ML19350B642 List:
References
50-382-80-35, NUDOCS 8103230175
Download: ML19350B641 (2)


See also: IR 05000382/1980035

Text

<p-

4,

UNITED STATES

9

NUCLEAR REGULATORY COMMISSION

g

'

,

7. J

"/.E

REGION IV

k

611 RYAN PLAZA ORIVE SUITE 1000

%

,

o,

ARLINGTON. TEXAS 76011

,,

January 28, 1981

-y

In Reply Refer To:

q. \\j n e '

,

'

Docket No. 50-382/80-35

-

{,h

l\\

Ye

p

~$g *If[

h

4

'

4

O,'

Louisiana Power and Light Company

8

A"S

,

ATTN:

D. L. Aswell, Vice President

/A

g/;

Power Production

y

j

142 Delaronde Street

New Orleans, Louisiana 70174

8

Gentlemen:

This refers to the inspection conducted under the Resident Inspection Program

by Mr. G. L. Constable of our staff during the period December 16, 1980 -

January 15, 1981, of activities authorized by NRC Construction Permit No.

CPPR-103 for Waterford Steam Electric Station, Unit No. 3, and to the dis-

cussions of the findings with D. B. Lester at the conclusion of the inspection.

Principal areas examined during the inspection included:

(1) Overall Preopera-

tional Test Program, and (2) Plant Tour. Within these areas, the inspection

consisted of selective examination of representative records, interviews with

personnel and observations by the inspector.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office within twenty-

five (25) days of the date of this letter, requesting that such information be

withheld from public disclosure. Any such application must include a full

statement of the reasons on the basis of which it is claimed that the informa-

tion is proprietary, and should be prepared so that proprietary information

identified in the application is contained in a separate part of the document.

If we do not hear from you in this regard within the specified period, the

report will be placed in the Public Document Room.

810323 0 n5

k

.

,

.

Louisiana Power and Light Company

2

January 28, 1981

Should you have any questions concerning this inspection we will be pleased to

discuss them with you.

Sincerely,

,b

G0

G. L. Madsen, Chief

Reactor Operations and

Nuclear Support Branch

Enclosure:

IE Inspection Report No. 50-382/80-35

.

w___