IR 05000369/1985040
| ML20151R281 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 01/30/1986 |
| From: | Walker R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| References | |
| NUDOCS 8602060004 | |
| Download: ML20151R281 (1) | |
Text
WiCAAA
~7iLe cvt:
J A N 3 01986 ATTN:
Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:
SUBJECT:
REPORT NOS. 50-369/85-40 AND 50-370/85-41 Thank you for your response of January 15, 1986, to our Notice of Violation issued on December 13, 1985, concerning activities conducted at your McGuire facility.
We have evaluated your response and found that it meets the require-ments of 10 CFR 2.201.
We will examine the implementation of your corrective actions during future inspections.
We appreciate your cooperation in this matter.
Sincerely, ORIG!NAL SL.tg Oy VIRGIL L. BROWNLEE Roger D. Walker, Director Division of Reactor Projects cc:
T. L. McConnell, Station Manager bcc: NRC Resident Inspector Document Control Desk State of North Carolina D. Hood, NRR rig / ',
RII urger:jd VBr niee 1[f9/86 Ig:[/86 8602060004 060130 ADOCKODOOg9 DR
Ii
.CG O l
.