U.S. NUCLEAR REGULATORY COMMISSION Region III Report No. 50-346/82-12(DETP)
Docket No. 50-346 License No. NPF-3 Licensee: Toledo Edison Company Edison Plaza 300 Madison Avenue Toledo, OH 43652 Facility Name: Davis-Besse Nuclear Power Station, Unit 1 Inspection At: Davis-Besse Site, Port Clinton, OH Inspection Conducted: April 5 and 7, 1982 g/Irt4um-
""
,K 3!#L Inspector: g. D. Ward l
dWLN}A-Approved By:
D. H. Danielson, Chief
/ 3/P 2-Materials and Processes Section Insepction Summary Inspection on April 5 and 7, 1982 (Report No. 50-346/82-12(DETP))
Areas Inspected:
Review of inservice inspection (ISI) data; material and equipment certifications; nondestructive examination (NDE) personnel certi-fications and observed work activities. The inspection involved a total of six onsite inspector-hours by one NRC inspector.
Results: No items of noncompliance or deviations were identified.
,
,
t 820503 0 33B i
~
.
.
s
,
x
'
(
' DETAILS Persons Contacted The Toledo Edison Company (TECol
'
- C. Daft, QA Director E. Doerr, Code Inspection Supervisor
.
J. Singer, Associate QC Specialist
"
Babcock and Wilcox Company (B&W)
C.'
n, Group Leader ISI The Hartford Steam Inspection and Insurance Company T. Sanford, Authorized Nuclear Service Inspector (ANII)
The inspector also contactnd and interviewed other licensee and contractor
. employees.
- Denotes those present at the exit interview.
Functional or Program Areas Inspected 1.
General
-
Ref: NRC Report No. 50-346/82-11(DETP) (Inservice Inspection)
The Eddy Current Examination (ET) consisted of a 3% random sample
[
plus a 100% lane tube examinaticn in each steam generator (SG). The 3% random sample examination in each generator included a limited number of "special interest" tubes such as concentrations of " dings" at a particular elevation on cross sectional area or the abnormal ding findings. The "special interest" tubes were counted as part of
.the 3% random sample examination in accordance with guidelines set forth in the Davis-Besse 1 Technical Specification.
In addition, a special examination of approximately 48 tubes in front of the eight internal auxiliary feedwater header brackets / dowel pin locations in each SG were also selected for ET.
Visual examination (VT) of the tube to tube support plate interfaces and accessible internal auxiliary feedwater headcr bracket / dowel pin locations-were performed in the "A" and "B" SG's through the XI-axis, Upper Secondary Manway.
In SG "A", one tube was found to have a 69% thin wall by ET.
Because of the results an-additional 6% ET was performed of SG "A".
Tube lists for the ' additional 6% ET 'were developed as part of the pre-outage planning effort and were supplied to B&W along ~with the 3% tube list for use as required.
f
!
,
u Z
'
u-
,.
.-
,',_
k
_
..
.
-
-
.
.
..
. - _. -
.
- -
. -
. _- -- - -
~
.
2.
Procedure Review
,
The inspector reviewed the following procedures:
B&W, Personnel Qualification - Eddy Current Examination, ISI-24,
.
Revision 4.
/
B&W, Ultrasonic Examination of Piping and Vessel Velds Joining
.
Similar and Dissimilar Materials, ISI-120, Revision 12.
B&W, Insertion, Calibration, Operation and Removal of Eddy a
.
Current OTSG Tube Examination Equipment in the Upper Head, ISI-406, Revision 4.
B&W, Multifrequency Eddy Current Examination of OTSG Tubing in
.
177 Steam Generators, ISI-416, Revision 3.
No items of noncompliance or deviations were identified.
'
3.
Equipment Certification and NDE Personnel Certifications The inspector reviewed eddy current equipment certifications and several B&W NDE personnel certifications, Level I, II and III, in accordance with SNT-TC'1A, 1975 Edition.
t No items of noncompliance or deviations were identified.
4.
Observation of Work Activities and Data Review
,
The inspector observed ET on several A and B SG tubes.
,.
i
!
Multi-frequency ET equipment was used for examining both SG's.
Therefore, debris data was taken simultaneously on all tubes probed for defect data.
Data was also reviewed on the following systems:
<
Service Water System
.
,
Reactor Coolant Drain System
.
Containment Spray System
.
.
Low Pressure Injection System
.
!
.
Decay Heat Removal System
.
,
Steam Generator Secondary System
.
'
Reactor Coolant System - Loop A
<
.
.
,
.
.u-rr
.-.
m.
.
. -
.
. ___.-.. =
- -....- _
_.. _. -
__
_-
_ - -..
...
_
.
,.
~
I Reactor Coolant Pump
.
Radwaste Coolant
.
Makeup and Purification System
.
,
No items of noncompliance or deviations were identified.
Exit-Interview The inspector met with C. Daft at the conclusion of the inspection. The
inspector summarized the scope and findings of the inspection noted in this report.