IR 05000346/1982002
| ML20054G271 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 06/15/1982 |
| From: | Spessard R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Crouse R TOLEDO EDISON CO. |
| Shared Package | |
| ML20054G272 | List: |
| References | |
| NUDOCS 8206210356 | |
| Download: ML20054G271 (1) | |
Text
,
.
-
m.
s e~cj ;,b
- ,k
%
v'
4'
'
- y :,
June 15, 1982 Docket No. 50-346 Tolede Edison Company ATTN:
Mr. Richard P. Crouse Vice President Nuclear Edison Plaza 300 Madison Avenue Toledo, 011 43652 Gentlemen:
Thank you for your letters dated May 3, 1982 and June 2, 1982, informing us of the steps you have taken to correct the noncompliance which we brought to your attention in Inspection Report No. 50-346/82-02 forwarded by our letter dated April 8, 1982. We will examine these matters during a subsequent inspection.
Your cooperation with us is appreciated.
Sincerely, Original signed by J. F. Streeter for R. L. Spessard, Director Division of Project and Resident Programs cc:
T. D. Murray, Station Superintendent cc w/Itrs dtd 5/3/82 6 6/2/82:
DMB/ Document Control Desk (RIDS)
Resident Inspector, R1II liarold W. Kohn, Power Siting Commission llelen W. Evans, State of Ohio Robert M. Quillin, Director Rad. Ilealth Program 8206210356 820615 PDR ADOCK 05000346 ($ Cl O
'" >
. ') '
.Str.
r..
.
k.
'
'
can) 6/15'/82 6/l3/82 6/lS/82 Nweeonuaisio80>sacu0240 O FFICI A'
RECORD COPY
. um mo-m eu