l April 9, 1981 Docket No. 50-346 gtn
.<
Toledo Edison Company s
ATTN: Mr. Richard P. Crouse p
g.gggi g Vice President
-
Nuclear
-
APR1 P.1982>
Edison Plaza 2'
'
a run mim exm *S 300 Madison Avenue
-
n;.u nuars! u E
Toledo, OH 43652 y
Gentlemen:
g Thank you for your letters dated January 14, February 26, and March 23, 1982, informing us of the steps you have taken to correct the noncompliance which we brought to your attention in Inspection Report 50-346/81-18 forwarded
_
by our letter dated December 15, 1981. We will examine these saatters during a subsequent inspection.
Your cooperation with us is appreciated.
Sincerely,
" Original cler.ed by R.L. Spessard" R. L. Spessard, Director Division of Project and Resident Programs cc w/tre ded: 1/14/82, 2/26/82 and 3/23/82:
T. D. Murray, Station Superintendent DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII Harold W. Kohn, Power Siting Comunission'
Helen W. Evans, State of Ohio Robert M. Quillin, Director 8204260dl3
.R...I. I.I [..
RTTT RIII ornce>
.
n suamut>..nyK9nLih....
... g re.93.9.t.,,,,,
..s
...r.4....
s
.....................
..................
......................
......................,
..M 2/.8 2.......
.95.1.82..
.3./.
.z.8.2......
....gg.g1.
l
.....................
.....................
...................
our>
...
OFFICIAL RECORD COPY usam m%,eo anc ronu ais om uncu oao
_ _ _ _ _ _
+
.
.
,
e'
.
'
,
M1EDO EDISON
'
RcHuo P. CRAEE Docket No. 50-346 Vca Prescent Nwww License No. NPF-3
'*8' ess seet Serial No.
1-239 l
'
January 14, 1982 Mr. R. L. Spessard, Director Division of Resident and Project Inspection U. S. Nuclear Regulatory Commission j
Region III j
799 Roosevelt Road Glen Ellyn, Illinois 60137
,
Dear Mr. Spessard:
l Toledo Edison acknowledges receipt of your December 15, 1981 letter (Log No. 1-575) and enclosures, Appendix A and report 50-346/81-18,
'
referencing the violation of Technical Specification Section 2.2.1 Tabic 2.2-1.
This violation is listed as Severity Level IV (Supplement I) in Appendix A.
Violation:
Technical Specification 2.2-1 requires that the Reactor Protection System instrumentation setpoin a ahall be set consistent with the trip setpoint values shown on Table 2.2-1.
j Table 2.2-1 and Technical Specification 3.3.1 requires that the trip setpoint for the RC pressure-temperature
,
trip be set at (12.60 T,,0F-5660) usig for operation of~~~
the plant in Modes 1 and 2.
'
'
Contrary to the above:
RPS temperature calibration was conducted under Procedure ST 5030.06 on April 17, 1981, to a nonconservative accept-ance criteria (1.630F) which is in violation of their Limited Safety System Setting.
Two of the four pressure -
temperature trip setpoints were not as per requirement of
'
Technical Specification 2.2.1.
JA N 2 01982 THE TOLEDO EDISON COMPANY EDCON PLAZA 300 MADISDN AVENUE TOLEDO, OHIO 43652 L_.
..
.
,
-
.
.
'
.
<
.
- .
Docket No. 50-346'
License No. NPF-3 Serial No. 1-239 January 14, 1982 Page Two Response:
As a precautionary measure, Facility Change Request 81-266 was written and impicmented on October 14, 1981 to reset the pressure / temperature bistables to ensure tripping within the acceptable design DNBR limit. Nucicar Engineering Department has developed.a set of draft guidelines to revise Surveillance Test ST 5030.06 to reduce the overall inaccuracies in the calibration procedure and/or to increase the margin between the actual setpoint in the field and the accident analysis value. The procedure and/or the setpoint will be-revised prior to the next performance of this test.
Attached is a copy of License Event Report 81-060 concerning this violation.
Very truly yours,
$f
-
RPC: GAB: lab attachment cc: DB-1 NRC Resident Inspector
.
..
_ _... _. _ _ _.
____
_
. - _ _ -
-
.
.
.
.
..
ATOMIC ENERGY ACT OF 1954 SECTION 182 SUBMITTAL IN RESPONSE FOR Tile
. DAVIS-BESSE NUCLEAR POWER STATION UNIT 1 FACILITY OPERATING LICENSE NPF-3
+
.
This response is submitted in conformance with Atomic Energy Act of 1954, Section 182 relating to Mr. R. L. Spessard's letter of December 15, 1981. This daals with routine safety inspection (81-18) conducted by Messrs. L. A. Reyes and W. G. Rogers.
.
By
-- : #
Vice-President Nuclear Sworn to and subscribed before me this fourteenth day of Janaury, 1982, l
th.
/
e
.0 -r/
_ mWh c
"
/
'
Notary Public LINDA C. COSTEW Notary Pub;!c - St.ito of Oh!o,
My Commission Expires reb. 9,1982
/