ML20052B585

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-346/82-12 on 820405-07.No Noncompliance Noted
ML20052B585
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/14/1982
From: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML20052B586 List:
References
TAC-48349, NUDOCS 8205030328
Download: ML20052B585 (2)


See also: IR 05000346/1982012

Text

_ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _

-

.

r

APR 141982

m

9

Docket No. 50-346(DETP)

\\

'

&

D

,

Toledo Edison Company

I-

A'ITN:

Mr. Richard P. Crouse

.

,f , +/ *f h

'0

Vice President

2

t

-

-

Nuclear

-

[G '

l

Edison Plaza

9,

!

CV ' #

'

Y d

/"

,

300 Madison Avenue

<

kj

Toledo, OH 43652

n n~

Gentlemen:

This refers to the routine safety inspection conducted by Mr. K. D. Ward

of this office on April 5 and 7, 1982, of activities at Davis-Besse Nuclear

Power Station, Unit 1, authorized by NRC Operating License No. NPF-3 and

to the discussion of our findings with Mr. C. Daft at the conclusion of

the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

820 5 0 3 0 S A8

J~fDI

.

.

-

- _ -

IA

.

.

APR11iW~

Toledo Edison Company

2

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

.This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Isj p 2tgaK)

IN. S. Little, Chief

Engineering Inspection Branch

Enclosure:

Inspection Repor't

No. 50-346/82-12(DETP)

cc w/ enc 1:

T. D. Murray, Station

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

liarold W. Kohn, Power Siting

Commission

llelen W. Evans, State of Ohio

Robert M. Quillin, Ohio

Department of Ilealth

RIII

RIII

RIII

RIII

,

h d

Dan e on

b

r

L

4/12/82

/

1-