Discusses Safeguards Insp Rept 50-344/86-03 on 860409 & Forwards Notice of Violation.Notice of Violation Withheld (Ref 10CFR2.790 & 73.21)
ML20197B800
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 05/07/1986
From: Scarano R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Withers B
PORTLAND GENERAL ELECTRIC CO.
References
NUDOCS 8605130129
Download: ML20197B800 (2)


Text

_ . _ . . . _ - . _ _ . _ - _ ~ __

i

. SAi: EGU/,ib.m iN. w i.4. JriON ME<Y C i 1955 Docket No. 50-344 Portland General Electric Company )

121 S. W. Salmon Street Portland, Oregon 97204 Attention: Mr. Bart D. Withers '

Vice President, Nuclear Gentlemen:

Subject: Notice of Violation (NRC Inspection Report No. 50-344/86-03)

During a recent safeguards inspection conducted at the Trojan Nuclear Plant, violations of NRC requirements were identified. The violations concern i inadequate access control of the protected and vital areas and failure to make appropriate report _

The inspection was conducted on January 14 through March 4, 1986, and referred to the discussions of our inspection findings held by the inspector with Messrs. J. Reid, J. Street, C. Brown and other members of their respective organizations on January 17, 1986. The inspection is documented in NRC Inspection Report No. 50-344/86-03 which was provided to you by letter dated March 25, 198 The violations were also discussed with you and members of your staff during an enforcement conference held in the NRC Region V office on March 27, 1986 j (NRC Inspection Report No. 50-344/86-11 dated April 9, 1986).

'

Violation A of the enclosed Notice of Violation demonstrates a need for management to understand the security requirement and assure that maintenance activities are fully evaluated and coordinated with security in min Violation F appears to have resulted due to your lack of understanding of NRC reporting requirements, the remaining violations demonstrate the need for

,

'

additional training and emphasis to all plant personnel that security requirements must be strictly followed. These items have been characterized

, into a security level as described in the NRC Enforcement Policy, 10 CFR Part 2, Appendix We will be following your corrective measures to ensure that similar

violations will be precluded in the future, these violations are the subject of enforcement in that the violations were not reported to the NRC and/or were i of the type that should have been prevented by corrective measures taken as a

.

result of previous similar occurrences.

,

Your response to this Notice is to be submitted in accordance with the provisions of 10 CFR 2.201 as stated in the Notice of Violatio WCLOSU'2 CO: TAINs 0 W"4GUAF.23 INF07.2ATIO G l

r UPON 2"'AIICU IHIS PAGE Ii D= 0::...;g;;;:), enh l ' . . , , , , , 1 i . 7,s a i; , . . , , . , ,,

-[

o l u v U, i. , y ,TlO N

  • ,

,,

Portland General Electric Company -2- ' ~ I l 00 In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2 Title 10, Code of Federal Regulations, documentation of the findings of your safeguards and security measures are exempt from public disclosure; therefore, the Notice of Violation will not be placed in the Public Document Room and will receive limited distributio We have determined that the enclosures so designated contain Safeguards Information and therefore are subject to the controls of 10 CFR 73.2 The responses directed by this letter and the enclosed Notice are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-51 Should you have any questions concerning this letter, we would be pleased to discuss them with yo

Sincerely,

. /$

Ross A. Sc rano, Director Division of Radiation Safety and Safeguards Enclosure:

Notice of Violation-cc w/ enclosure:

J. W. Durham, Esq., PGE W. S. Orser, Plant Manager i M. C. Street, General Manager, Corporate Security bec w/ enclosure:

P. Robinson, NRC:IE bec: RSB/ Document Control Desk (RIDS) (w/o ene)

J. Martin B. Faulkenberry C. Cook (w/o enc)