IR 05000341/1980011
| ML20003A152 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 01/14/1981 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Hines E DETROIT EDISON CO. |
| Shared Package | |
| ML20003A153 | List: |
| References | |
| NUDOCS 8101290768 | |
| Download: ML20003A152 (1) | |
Text
. -
- - -
.
_ _.
_.~
l
"8:
>
- ,,
NUCLEAR REGULATORY COMMISSION
$
o RE GloN lil
f 799 ROOSEVELT ROAD
- t.,
/
aten euvu, stunOes sour
- ...+
'JAN 1 4 som Docket No. 50-341 The Detroit Edison Company ATTN:
Mr. Edward Hines, Assistant Vice President and Manager Qu..lity Assurance
2000 Second Avenue Detroit, MI 48226 Gentlemen:
.
Thank you for your letter dated November 19, 1980, informing us of the steps you have taken to correct the items of noncompliance which we brought to your attention in Inspection Report No. 50-341/80-11 forwarded by our letter dated October 8, 1980. We will examine these matters during a subsequent inspection.
Your cooperation with us is appreciated.-
l
Sincerely, I
G. Fiorelli, Chief Reactor Construction and
'
Engineering Support Branch cc w/ltr dtd 11/19/80:
Central Files Reproduction Unit NRC 20b AEOD
Resident Inspector, RIII c
\\
D I[U k(fI4[*
d'
Local PDR r
NSIC j
(
-
JAN 211981 w Eg Ronald Callen, Michigan
'
-
Public Service Commission
" w. s, - -.
'
Eugene B. Thomas, Jr.,
\\
"""****
Attorney-
%
\\&
_
---
8101290%S Ct.
-
- - - - - -
-
-
-
-
-
.
-
-.
.