IR 05000341/1980008

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-341/80-08 on 800508.No Noncompliance Noted. Major Areas Discussed:Communications Between Licensee & Region 3 Re Public Affairs
ML19318B840
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 05/20/1980
From: Fiorelli G, James Keppler, Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19318B836 List:
References
50-341-80-08, 50-341-80-8, NUDOCS 8006300156
Download: ML19318B840 (2)


Text

,

.

O

.

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report No. 50-341/80-08 Docket No. 50-341 Licensee: Detroit Edison Company 2000 Second Avenue Detroit, MI 48266 Facility Name: Enrico Fermi Nuclear Station, Unit 2 Meeting At: Region III, Glen Ellyn, IL Meeting Conducted: May 8, 1980

$ Q..,. b-Attendees:

. G. Koppler E-2 /- R6 dh ( 15 T>relli (-/V cTO t

Rc -tQ>

R. C. Knop 9 - /Y~8

@,1 3 C I!'

5" C. E. Norelius hWj )6 J

L t le M

.

, -

P. A Br f "/ bb Approved By: C I

f 3d!h

'l eactor Construction and I

(

Engineering Support Branch t

Meeting Summary Meeting on May 8, 1980 (Report No. 50-341/80-08)

Meeting Subject: Discuss communications between the licensee and Region III, concerning public affairs.

8006300 M

e

'

DETAILS 1.

Meeting Attendees - Detroit Edison Company Harry Tauber, Vice President, Engineering and Construction Ed Hines, Assistant Vice President, Quality Assurance W. J. Fahrner, Manager Fermi 2 H. F. Heffner, Director, Public Information 2.

Meeting Details At the licensee's request, an informal discussion was held to identify methods in which RIII/DE communications of public interest could be ex-pedited and defined.

The scope of the discussions was limited ta Region III communication policies and suggestions that could be developed to enhance communi-cation. Some general discussions were held on construction activities at Fermi in addition to current regulatory topics.

.