IR 05000275/2003008

From kanterella
(Redirected from IR 05000323/2003008)
Jump to navigation Jump to search
Corrected Page to IR 05000275-03-008 and 05000323-03-008
ML040890648
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 03/26/2004
From: William Jones
NRC Region 4
To: Rueger G
Pacific Gas & Electric Co
References
IR-03-008
Download: ML040890648 (6)


Text

rch 26, 2004

SUBJECT:

DIABLO CANYON POWER PLANT - CORRECTION TO NRC INTEGRATED INSPECTION REPORT 05000275/2003008 AND 05000323/2003008

Dear Mr. Rueger:

Recently, your staff contacted us regarding some information in the subject report that was believed to be inaccurate. Your staff provided us with some additional information that warrants a minor change to the report. The new information did not change the conclusions reached during the inspection Please replace page 5, within Section 1R05 Fire Protection (71111.05) of the issued report, with the attached page. We regret any inconvenience caused by the inaccuracy.

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter, its enclosure, and your response will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

William B. Jones, Chief Project Branch E Division of Reactor Projects

Pacific Gas and Electric Company -2-Dockets: 50-275 50-323 Licenses: DPR-80 DPR-82 Enclosure:

Page 5, Section 1R05 Fire Protection (71111.05)

cc w/enclosure:

David H. Oatley, Vice President and General Manager Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Lawrence F. Womack, Vice President Nuclear Services Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 James R. Becker, Vice President Diablo Canyon Operations and Station Director, Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 3 Avila Beach, CA 93424 Sierra Club San Lucia Chapter c/o Henriette Groot 1000 Montecito Road Cayucos, CA 93430 Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, CA 93448 Chairman San Luis Obispo County Board of Supervisors Room 370 County Government Center San Luis Obispo, CA 93408

Pacific Gas and Electric Company -3-Truman Burns\Robert Kinosian California Public Utilities Commission 505 Van Ness Ave., Rm. 4102 San Francisco, CA 94102-3298 Diablo Canyon Independent Safety Committee Robert R. Wellington, Esq.

Legal Counsel 857 Cass Street, Suite D Monterey, CA 93940 Ed Bailey, Radiation Control Program Director Radiologic Health Branch State Department of Health Services P.O. Box 942732 (MS 178)

Sacramento, CA 94234-7320 Richard F. Locke, Esq.

Pacific Gas and Electric Company P.O. Box 7442 San Francisco, CA 94120 City Editor The Tribune 3825 South Higuera Street P.O. Box 112 San Luis Obispo, CA 93406-0112 James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 34)

Sacramento, CA 95814

Pacific Gas and Electric Company -4-Electronic distribution by RIV:

Regional Administrator (BSM1)

DRP Director (ATH)

DRS Director (DDC)

Senior Resident Inspector (DLP)

Branch Chief, DRP/E (WBJ)

Senior Project Engineer, DRP/E (VGG)

Staff Chief, DRP/TSS (PHH)

RITS Coordinator (KEG)

Rebecca Tadesse, OEDO RIV Coordinator (RXT)

DC Site Secretary (AWC1)

Dale Thatcher (DFT)

W.A. Maier, RSLO (WAM)

ADAMS: Yes * No Initials: __WBJ__

Publicly Available * Non-Publicly Available * Sensitive Non-Sensitive R:\_DC\2003\DC2003-08RP Correction.wpd RIV:RI:DRP/E SRI:DRP/E C:DRP/E TWJackson DLProulx WBJones T - WBJones T - WBJones /RA/

3/26/04 3/26/04 3/26/04 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

Pacific Gas and Electric Company -5-nonlicensed, Level 8 nuclear operators could be used as operations responders. A 2-hour training session was provided to nuclear operators on the duties of an operations responder, prior to August 29, 2003. The training session was outlined in Lesson Number R032C12, Operations Responder Responsibilities. Procedure CP M-6, Fire, Revision 2, included a checklist for the operations responder duties in Attachment 4.2, Operations Responder Checklist. However, the procedure and checklist were not issued until September 12, 2 weeks after licensed control operators and nuclear operators could serve as operations responders.

The inspectors interviewed various control operators and nuclear operators and identified the following deficiencies and issues concerning the operations responder position:

  • One licensed control operator did not receive training on the operations responder position.
  • A majority of the operators served on the fire brigade before the professional fire brigade took over, and they expressed a higher degree of confidence in performing the duties of the operations responder, as compared to those who did not have prior fire brigade experience.
  • More than one of the operators did not know the phone number for accessing the fire conference bridge, and others had learned about the protocol for the fire conference bridge the day the interview was performed.
  • The operators expressed a desire for more thorough training on the operations responder position.
  • The operators were not aware that Attachment 4.2 of Procedure CP M-6, titled Operations Responder Checklist, existed.
  • The operations responder position does not have a qualification card, nor is it part of requalification training for operators.
  • As of August 29, 2003, all Level 8 nuclear operators assigned to a crew had received the operations responder training, but, on at least one occasion, an operator could not recall that he had received the training.
  • The control operators and nuclear operators had not participated in drills with the fire brigades and identified a lack of interaction with the brigades.

In addition to interviews, the inspectors compared Attachment 4.2 of Procedure CP M-6 to Lesson R032C12, Operations Responder Responsibilities. The inspectors noted the following items were missing from the lesson plan when compared to Attachment 4.2. The lesson plan did not discuss: