U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I Report N /78-42 Docket N =-~-----
License N CPPR-53 Priority ------
Category* ___ s ___ _
Licensee:
Approved by:
Public Service Electric and Gas Company 80 Park Place Newark, New Jersey 07101 J. P ohr, Chief, Environmental and Spe ial Projects Section, FF&MS Branch Inspection Summary:
- i_ftrl~r date signed date signed date signed 12-/tr brr date signed Inspection on November 8, 1978 (Report No. 50-311/78-42)
.
Areas Inspected: Routine, unannounced preoperational inspection of the licensee 1s chemical and radioc.hemical measurements progra Areas reviewed included: revisions of procedures to include Unit 2 for sampling and release of effluents, verification of capability of.measuring radioactivity in
- effluents, and performance of analysis o* a split effluent sampl The inspection invplved 8 inspector-hours onsite by one NRC regional based inspecto Results: Of the three areas inspected, no items of noncompliance were i den ti fi ed..
Region I Form 12
{Rev. April 77)
7 9 0 2 0 1 0 c).~ 5
DETAILS Persons Contacted
- H. Midura, Station Manager
- J. Stillman, Station QC Engineer
- W. Gran, QA Staff Assistant
- W. Treston, QA
- M. Stocknoff, Technical Supervisor N. Allman, Engineer, Licensing and-Environmental Division
- denotes those present at exit intervie.
Procedures*
The inspector rev.iewed the_ following procedures in the areas of effluent releases and analyses and sampling:
PD-3. 5. 001 PD-3.5.036 PD-3.5.055 PD-3.5.0ST PD-3. 5. 061 PD-3.8.016 PD-3. 5. 062
- -
P D-3. 9 * 0 l 7 PD-3.8.015 PD-3.5.012 Sampling of the Reactor Coolant Compoiiting of Liquid Samples Waste. Monitor Hold Up Tank Samples Waste Hold Up Tank Sampling Sampling the Containment Atmosphere Gaseous Radwaste Release Calculations Sampling the Plant Vent Quality Control Requirements Use of Liquid Waste Release Forms Sampling the Gas Decay Tanks The inspector* noted that the procedures contain provisions for sampling from both Units 1 and In addition the inspector noted that the Gaseous Radwaste Release-Calculations Procedure PD-3.8.016 was written such that gas decay tank releases from both Unit 1 and 2 could occur simult~neously without exceeding the site t~chnical specification release limits. The inspector had no further questions in this are No items of noncompliance were identifie.
Confirmatory Measurements The inspector noted that the licensee would be using the laboratory counting equipment already being used for Unit l effluent sample analyses for Unit 2 effluent a*nalyses als The inspector noted that in a previous NRC inspection on May 2-5, 1978, *NRC:I Inspection*
Report 50-272/78-10, the analytical results of actual effluent samples split between the licensee and the NRC were in agreemen During the inspection on May 2-5, 1978, a liquid waste tank sample was split for the analysis of Sr-89 and Sr-9 The licensee, however, did not have his contracting laboratory perform th.is analysis. Therefore, during this inspection a liquid waste' tank sampla was split for the purpose of comparing the Sr-89 and Sr-90 analysis results. The results.of this comparison will be documented i~ a subsequent. inspection report after the results are received (78-42-01).
The inspector had no further questions in this are No items of noncompliance were identifie.
Exit Interview The inspector met with licensee representatives (denoted in Paragraph 1) at the conclusion of the inspection on November 8, 197 The inspector summarized the purpose and scope of the inspection and the findings presented in the details of this repor The. licensee agreed to perform the Sr-89 and Sr-90 analysis and report the results to NRC:I.