IR 05000272/2011001

From kanterella
(Redirected from IR 05000311/2011001)
Jump to navigation Jump to search
Annual Assessment Letter for Salem Nuclear Generating Station, Unit Nos. 1 and 2 (Report 05000272/2011001 and 05000311/2011001)
ML12061A032
Person / Time
Site: Salem  PSEG icon.png
Issue date: 03/05/2012
From: Arthur Burritt
Reactor Projects Branch 3
To: Joyce T
Public Service Enterprise Group
BURRITT, AL
Shared Package
ML12055A180 List:
References
IR-11-001
Download: ML12061A032 (5)


Text

UNITED STATES rch 5, 2012

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 (REPORT 05000272/2011001 and 05000311/2011001)

Dear Mr. Joyce:

On February 13, 2012 the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Salem Nuclear Generating Station Unit Nos. 1 and 2 (Salem). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011 through December 31, 2011. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.

The NRC determined that overall, Salem operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Salem during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e.,

green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2013. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to the baseline inspection, the NRC will perform Temporary Instruction (TI)-182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5069 with any questions you have regarding this letter.

Sincerely,

/RA/

Arthur L. Burritt, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos. 50-272; 50-311 License Nos. DRP-70; DPR-75 Enclosure:

Inspection Plan cc: Distribution via ListServ