March 4, 2015
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 (REPORT 05000272/2014001 AND 05000311/2014001)
Dear Mr. Joyce:
On February 11, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Salem Nuclear Generating Station, Unit Nos. 1 and 2 (Salem). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014 through December 31, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined the performance at Salem Unit 1 during the most recent quarter was within the Regulatory Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because of a White PI for Unplanned Scrams per 7,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> critical. This PI changed to White in the 4th quarter of 2014 due to a manual reactor scram on October 19, 2014, preceded by three scrams in the 2nd quarter of 2014. Salem Unit 2 remains in the Licensee Response Column of the Action matrix because all inspection findings had very low (i.e., green)
safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection at Unit 1 in accordance with Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area, upon notification of your readiness. The inspection will be focused on ensuring that the root causes and contributing causes of the performance issue are understood, the extent of condition and cause are identified, and the corrective actions are sufficient to prevent recurrence.
The NRC evaluates cross-cutting themes, in accordance with Inspection Manual Chapter 0310, to determine whether a substantive cross-cutting issue exists in a particular area and to encourage licensees to take appropriate actions before more significant performance issues emerge. The NRC identified a cross-cutting theme at Salem in the Human Performance area.
Specifically, the NRC identified four or more findings with a documented cross-cutting aspect of H.8 - Procedure Adherence: Individuals follow processes, procedures and work instructions.
The NRC determined that a substantive cross-cutting issue associated with H.8 does not exist because, currently, the NRC does not have a concern with your staffs scope of effort and progress in addressing the cross-cutting theme. Specifically, the theme was identified at the end of the assessment period and PSEG has recognized the cross-cutting theme and entered it into the corrective action program. The NRC will evaluate corrective actions once PSEG has had time to evaluate the theme and implement corrective actions. The enclosed inspection plan lists the inspections scheduled at Salem through June 30, 2016.
Routine inspections performed by resident inspectors are not included in the inspection plan.
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.
In addition to baseline inspections, the NRC will conduct Inspection Procedure (IP) 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants. Additionally, the NRC will conduct IP 71003, Post-Approval Site Inspection For License Renewal, to verify the license conditions added as part of the renewed operating license, regulatory commitments, selected aging management programs (AMPs), and time limited aging analyses (TLAAs) are implemented and/or completed in accordance with 10 CFR Part 54.
In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Glenn Dentel at (610) 337-5233 with any questions you have regarding this letter.
Sincerely,
/RA Michael L. Scott Acting for/
Ho K. Nieh, Director Division of Reactor Projects
Docket Nos. 50-272, 50-311 License Nos. DPR-70, DPR-75.
Enclosure: Salem Inspection/Activity Plan
cc w/encl: Distribution via ListServ
ML15062A086 SUNSI Review
Non-Sensitive
Sensitive
Publicly Available Non-Publicly Available
OFFICE RI/DRP RI/DRP RI/DRP RI/DRP
NAME PFinney/ MSD per email MDraxton/ MSD GDentel / GTD HNieh/ MLS for
DATE 02/23/15 02/25/15 02/25/15 02/27/15
Page 1 of 3 02/25/2015 08:56:07 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Salem Inspection / Activity Plan 01/01/2015 - 06/30/2016 TRI FI
- TRIENNIAL FIRE PROTECTION INSPECTION
1, 2 IP Fire Protection [Triennial]
7111105T 01/26/2015 01/30/2015 1, 2 IP Fire Protection [Triennial]
7111105T 02/09/2015 02/13/2015 71152B
- PI&R - BIENNIAL
1, 2 IP Problem Identification and Resolution 71152B 05/04/2015 05/08/2015 1, 2 IP Problem Identification and Resolution 71152B 05/18/2015 05/22/2015 71124
- EFFLUENTS
1, 2 IP Radiation Monitoring Instrumentation 71124.05 06/15/2015 06/19/2015 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 06/15/2015 06/19/2015 EP
- EP PROGRAM INSPECTION
1, 2 IP Alert and Notification System Testing 7111402 06/22/2015 06/26/2015 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 06/22/2015 06/26/2015 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 06/22/2015 06/26/2015 ISFSI
- ISFSI LOADING INSPECTION
1, 2 IP Operation Of An ISFSI 60855 07/06/2015 07/10/2015 1, 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 07/06/2015 07/10/2015 71003
- UNIT 1 LR COMMITMENT INSPECTION PHASE II
1 IP Post-Approval Site Inspection for License Renewal 71003 07/20/2015 07/24/2015
IP Post-Approval Site Inspection for License Renewal 71003 08/03/2015 08/07/2015 7111111B
- REQUAL INSP W/ P/F RESULTS
1, 2 IP Licensed Operator Requalification Program 7111111B 09/07/2015 09/11/2015 12/14EXM
- INITIAL OL EXAM
1 FY16 - SALEM INITIAL OPERATOR LICENSING EXAM U01910 11/16/2015 11/20/2015
FY16 - SALEM INITIAL OPERATOR LICENSING EXAM U01910 12/14/2015 12/24/2015 71124
- RADIATION PROTECTION
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/05/2015 10/09/2015 1, 2 IP Occupational ALARA Planning and Controls 71124.02 10/05/2015 10/09/2015
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 10/05/2015 10/09/2015 1, 2 IP Occupational Dose Assessment 71124.04 10/05/2015 10/09/2015 1, 2 IP Radiation Monitoring Instrumentation 71124.05 10/05/2015 10/09/2015 71124.08
- RADWASTE
1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 10/19/2015 10/23/2015 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 3 02/25/2015 08:56:07 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Salem Inspection / Activity Plan 01/01/2015 - 06/30/2016 7111108P
- U2 INSERVICE INSPECTION
2 IP Inservice Inspection Activities - PWR 7111108P 11/02/2015 11/13/2015 71124
- RADIATION PROTECTION
2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/02/2015 11/06/2015
IP Occupational ALARA Planning and Controls 71124.02 11/02/2015 11/06/2015
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/02/2015 11/06/2015
IP Occupational Dose Assessment 71124.04 11/02/2015 11/06/2015
IP Radiation Monitoring Instrumentation 71124.05 11/02/2015 11/06/2015 71124
- RADIATION PROTECTION
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/16/2015 11/20/2015 1, 2 IP Occupational ALARA Planning and Controls 71124.02 11/16/2015 11/20/2015 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/16/2015 11/20/2015 1, 2 IP Occupational Dose Assessment 71124.04 11/16/2015 11/20/2015 1, 2 IP Radiation Monitoring Instrumentation 71124.05 11/16/2015 11/20/2015 1, 2 IP Performance Indicator Verification 71151 11/16/2015 11/20/2015 71124
- RADIATION PROTECTION
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/07/2016 03/11/2016 1, 2 IP Occupational ALARA Planning and Controls 71124.02 03/07/2016 03/11/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/07/2016 03/11/2016 1, 2 IP Occupational Dose Assessment 71124.04 03/07/2016 03/11/2016 1, 2 IP Radiation Monitoring Instrumentation 71124.05 03/07/2016 03/11/2016 EP
- EP EXERCISE EVALUATION
1, 2 IP Exercise Evaluation 7111401 05/16/2016 05/20/2016 71124
- RADIATION PROTECTION
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/11/2016 04/15/2016
IP Occupational ALARA Planning and Controls 71124.02 04/11/2016 04/15/2016
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/11/2016 04/15/2016
IP Occupational Dose Assessment 71124.04 04/11/2016 04/15/2016
IP Radiation Monitoring Instrumentation 71124.05 04/11/2016 04/15/2016 71003
- U1 LR COMMITTMENTS - OUTAGE
1 IP Post-Approval Site Inspection for License Renewal 71003 04/18/2016 04/22/2016 ISI
- U1 INSERVICE INSPECTION
1 IP Inservice Inspection Activities - PWR 7111108P 04/18/2016 04/29/2016 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 3 of 3 02/25/2015 08:56:07 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Salem Inspection / Activity Plan 01/01/2015 - 06/30/2016 71124
- RADIATION PROTECTION
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/16/2016 05/20/2016 1, 2 IP Occupational ALARA Planning and Controls 71124.02 05/16/2016 05/20/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/16/2016 05/20/2016 1, 2 IP Occupational Dose Assessment 71124.04 05/16/2016 05/20/2016 1, 2 IP Radiation Monitoring Instrumentation 71124.05 05/16/2016 05/20/2016 71124
- ENVIRONMENTAL
1 IP Radiological Environmental Monitoring Program 71124.07 06/06/2016 06/10/2016 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.