IR 05000302/1978027
| ML20062G518 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 11/15/1978 |
| From: | Fuchko J, Gillespie F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20062G499 | List: |
| References | |
| 50-302-78-27, NUDOCS 7812290112 | |
| Download: ML20062G518 (1) | |
Text
MS M G iter W Ifie g
..
en f.fftMPORMATION g/. " %[o
NUCLEAWR ATORY COMMISSION g
R EGION 11
,(
g
,
. r 101 M ARIETTA sTRE ET. N.W.
[
ATL ANTA, GEORGI A 30303 o
%, '.... /
,
Report No.:
50-302/78-27 Docket No.:
50-302 License No.:
DPR-72 Category:
C Licensee:
Florida Power Corporation P. O. Box 14042 St. Petersburg, Florida 33733
.
Facility Name: Crystal River 3 Inspection at: Crystal River, Florida Inspection Conducted:
October 18-19, 1978 Inspector:
J. M. Fuchk f/// f 75 I.U.
C f
Reviewed by:
s F.P.Gillespie/ Chief
' Da t'e Security and Investigation Section Safeguards Branch Inspection 'ummarv Inspection on October 18-19, 1978 (Report No. 50-302/78-27)
'
-
Areas Inspected:
Unannounced security inspection of licensee compliance with physical security requirements as related to security plan, security organization, access controls, response procedures, and follow-up on items identified in Report Nos. 50-302/78-3 and 50-302/78-17.
The inspection involved 9 man-hours onsite by one NRC inspector.
The inspection was initiated during normal shift hours.
Results:
Of the four areas inspected, two items of noncompliance were discovered in two areas.
Infraction - response procedures (50-302/78-27-01); deficiency - vehicle control (50-302/78-27-02).
.n-12
, lE
.-
m-CoFuS
Cc;? _
N O ((
.
,s not to be This Doc....
reproduced *,,,eutsp,,ggge
approval of IE:ll MATER!Al.TRANSMfTTE HERWmf
,
,
CG: iia!NS 2.790 INFORMAT10N
$