ML20062G505
| ML20062G505 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 11/15/1978 |
| From: | Kenna W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stewart W FLORIDA POWER CORP. |
| Shared Package | |
| ML20062G499 | List: |
| References | |
| NUDOCS 7812290101 | |
| Download: ML20062G505 (2) | |
See also: IR 05000302/1978027
Text
',t
.
MAT P.PiTRANSMINED H'Gr#1TH
CNii.N9MOOMORMATION
'
/pa ac'%'o,
NUCLEAR REGULATORY COMMISSION
[
R EGION il
,
3
-
g
101 MARIETTA STREET.N.W.
!
ATLANTA. GEORGIA 30303
o
%, .
p
- ....
NOV 151978
In Reply Refer To:
RII:JMF
50-302/78-27
Florida Power Corporation
ATTN: Mr. W. P. Stewart
/
Director Power Production
Post Of fice Box 14042, Mail Stop C-4
St. Petersburg, Florida 33733
Gentlemen:
This refers to the inspection conducted by Mr. J. M. Fuchko of this office
on October 18- 19, 1978, of activities authorized by NRC Operating License
No. DPR-72 at Crystal River 3 and to the discussion of our findings held
with Mr. G. P. Beatty, Jr. , at the conclusion of the inspection.
The area examined during this inspection was your program for safeguarding
special nuclear material under the applicable provisions of Title 10,
Code of Federal Regulations, Part 73, " Physical Protection of Plaats and
Materials."
Within this area, the inspection consisted of selective
examinations of procedures and representative records, interviews with
.
personnel, and observations by the inspectors.
(
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements.
These
items and references to pertinent requirements are listed in the Notice
of Violation enclosed herewith as Appendix A.
This notice is sent to
you pursuant to the provisions of Section 2.201 of the NRC's " Rules of
Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201
requires you to submit to this office, within 20 days of your receipt of
this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved;
(2) corrective steps which will be taken to avoid further noncompliance;
and (3) the date when full compliance will be achieved.
7812290Wl
IET3'Al TRANSMTITED N' DEW!TH
CCNU.:NS 2.730 INFORMATiJN
-
,
.
.
.
CATE'tiTEA!!S',UlTG NBEWH
ty;;ill,Ns 2333 INFORMAT!0N
-
NOV 151978
Florida Power Corporation
-2-
If Appendix A contains any information that you (or your contractor)
believe to be p rop rieta ry , it is necessary that you make a written
application within 20 days to this office to withhold such information
from public disclosure.
Any such application must include a full state-
ment of the reasons on the basis of which it is claimed that the informa-
tion is proprietary, and should be prepared so that proprietary informa-
tion identified in the application is contained in a separate part of
the document.
If we do not hear from you in this regard within the
specified period, Appendix A will be placed in the Public Document Room.
In accordance with Section 2.790(d) of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, details of activities
involving safeguards and security measures are exempt from public disclosure;
therefore, the Inspection Report enclosed with this letter with the
7 .
exception of the report cover page, which is an inspection summary, will
NOT be placed in the Public Documant Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
'/ f
d.
t
.
W.
. Ker 'a, Chief
n
Safeguarjis Branch
Enclosures:
Appendix A, Notice of Violation
(Not Exempt)
(
Inspection Repo:t No. 50-302/78-27
(Exempt from Disclosure)
Inspection Summary
(Not Exempt)
cc w/ encl:
Mr. G. P. Beatty, Jr.
Nuclear Plant Superintendent
Post Office Box 1228
Crystal River, Florida 32629
1/.ATEfflTRANSMffTG NGEWITH
CD:li!.35 2300 INFORMATION