IR 05000266/2023004

From kanterella
(Redirected from ML24032A056)
Jump to navigation Jump to search
Integrated Inspection Report 05000266/2023004 and 05000301/2023004
ML24032A056
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/01/2024
From: Billy Dickson
NRC/RGN-III/DORS/RPB2
To: Durbin M
Point Beach
References
IR 2023004
Download: ML24032A056 (1)


Text

SUBJECT:

POINT BEACH NUCLEAR PLANT - INTEGRATED INSPECTION REPORT 05000266/2023004 AND 05000301/2023004

Dear Michael Durbin:

On December 31, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Point Beach Nuclear Plant. On January 8, 2024, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

Two findings of very low safety significance (Green) are documented in this report. Two of these findings involved violations of NRC requirements. We are treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violations or the significance or severity of the violations documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement; and the NRC Resident Inspector at Point Beach Nuclear Plant.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; and the NRC Resident Inspector at Point Beach Nuclear Plant.

February 1, 2024 This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Billy C. Dickson, Chief Reactor Projects Branch 2 Division of Operating Reactor Safety Docket Nos. 05000266 and 05000301 License Nos. DPR-24 and DPR-27

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000266 and 05000301

License Numbers:

DPR-24 and DPR-27

Report Numbers:

05000266/2023004 and 05000301/2023004

Enterprise Identifier:

I-2023-004-0055

Licensee:

NextEra Energy Point Beach, LLC

Facility:

Point Beach Nuclear Plant

Location:

Two Rivers, WI

Inspection Dates:

October 01, 2023 to December 31, 2023

Inspectors:

G. Hansen, Sr. Emergency Preparedness Inspector

T. Hooker, Health Physicist

E. Magnuson, Reactor Inspector

J. Masse, Resident Inspector

V. Myers, Senior Health Physicist

V. Petrella, Resident Inspector

E. Sanchez Santiago, Senior Project Engineer

M. Stafford, Senior Resident Inspector

Approved By:

Billy C. Dickson, Chief

Reactor Projects Branch 2

Division of Operating Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Point Beach Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

Failure to Demonstrate Acceptability for Continued Service for Indications Detected in a Reactor Coolant Pump Welded Support Cornerstone Significance Cross-Cutting Aspect Report Section Barrier Integrity Green NCV 05000266/2023004-01 Open/Closed

[H.7] -

Documentation 71111.08P The inspectors identified a finding of very low safety significance (Green) and an associated non-cited violation (NCV) of 10 CFR 50.55a(g)(4) for the failure to evaluate and accept for service a relevant indication in accordance with ASME Section XI requirements. Specifically, the licensee failed to evaluate and accept for continued service a relevant indication found during a regularly scheduled exam of reactor coolant pump (RCP) welded support RCP-A-1-IWA.

Failure to Establish Acceptance Criteria for ASME Section XI Successive Exam of a Welded Support Cornerstone Significance Cross-Cutting Aspect Report Section Barrier Integrity Green NCV 05000266/2023004-02 Open/Closed

[H.12] - Avoid Complacency 71111.08P The inspectors identified a finding of very low safety significance (Green) and an associated non-cited violation (NCV) of 10 CFR 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the failure to establish appropriate quantitative or qualitative acceptance criteria when performing an ASME Section XI successive exam on RCP welded support RCP-A-1-IWA. Specifically, the licensee did not establish acceptance criteria to determine if the evaluation of the actual indication growth during successive examinations against the predicted growth was satisfactorily accomplished.

Additional Tracking Items

Type Issue Number Title Report Section Status URI 05000266,05000301/20 23004-03 Potential Failure to Correct an

NRC Identified

Violation 71152A Open

PLANT STATUS

Unit 1 began the inspection period in a coast down for a refueling outage, at approximately 93 percent power. On October 7, 2023, operators shutdown Unit 1 from approximately 90 percent power for the scheduled refueling outage. On October 31, 2023, operators restarted Unit 1. On November 1, 2023, operators synchronized the unit to the grid, and on November 4, 2023, the unit achieved full power. The unit remained at or near full power throughout the remainder of the inspection period.

Unit 2 began the inspection period at rated thermal power and remained at or near full power throughout the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of seasonal cold temperatures for the following systems:

Instrument power white and yellow inverters; D-105 and D-106 batteries; Independent Spent Fuel Storage Installation (ISFSI) temperature monitoring indication on December 22, 2023.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (1 Sample)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 2 turbine-driven auxiliary feedwater system on October 24, 2023

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated system configurations during a complete walkdown of the Unit 1 residual heat removal system on December 20, 2023.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (2 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Fire zones 505, 511, 516, and 520 on October 18, 2023
(2) Fire zone 524 on October 18, 2023

===71111.08P - Inservice Inspection Activities (PWR) The inspectors verified that the reactor coolant system boundary, reactor vessel internals, risk-significant piping system boundaries, and containment boundary are appropriately monitored for degradation and that repairs and replacements were appropriately fabricated, examined and accepted by reviewing the following activities.

PWR Inservice Inspection Activities Sample - Nondestructive Examination and Welding Activities (IP Section 03.01)===

The inspectors verified that the following nondestructive examination and welding activities were performed appropriately:

(1) Ultrasonic Examination
  • Reactor Coolant Pump Welded Attachment: RCP-A-1-IWA, B-K/B10.30 Visual Examination
  • VT-3 of Welded Spring Support: SI-2501R-2-SI-1, F-A/F1.10C
  • VT-3 of Containment Moisture Barrier: G1-G2-J4, E-A/E1.30 Welding Activities
  • Weld Repair/Replacement of HB-19 Service Water to Engineered Safeguards Piping Work Order (WO) 040278323-16

Activities (IP Section 03.02) (1 Sample)

The inspectors verified that the license conducted the following vessel upper head penetration inspections and addressed any identified defects appropriately:

(1)

  • Bare metal visual of Unit 1 reactor top head PWR Inservice Inspection Activities Sample - Boric Acid Corrosion Control Inspection Activities (IP Section 03.03) (1 Sample)

The inspectors verified the licensee is managing the boric acid corrosion control program through a review of the following evaluations:

(1) Boric Acid Evaluations
  • BAS22-059 R1 CETNAS 35 and 37 Corrective Action Documents
  • Performed on October 7, 2023

71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance

Requalification Examination Results (IP Section 03.03) (1 Sample)

(1) The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating exam administered on August 14, 2023-November 22, 2023.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room during Unit 1 shutdown and cooldown on October 6 and October 7, 2023.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated licensed operator simulator training on November 13, 2023.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (4 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1)125V direct current electrical system

(2) Containment isolation valves and primary containment integrity
(3) Source range instruments
(4) Diesel generator fuel oil system

Quality Control (IP Section 03.02) (1 Sample)

The inspectors evaluated the effectiveness of maintenance and quality control activities to ensure the following SSCs remain capable of performing their intended function:

(1)

  • Unit 2 containment sump B level transmitter
  • P-38A minimum recirculation control time delay relay

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Unit 1 source range instrument failure during refueling outage on October 7, 2023
(2) Unit 1 containment key safety function with boundary valve not fully closed on October 11, 2023
(3) Unit 1 elevated risk due to the G-05, Gas Turbine Generator, going out of service on October 13, 2023
(4) Unit 1 yellow risk during core re-load on October 21, 2023

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)

The inspectors evaluated the licensees justifications and actions associated with the following operability determinations and functionality assessments:

(1) Operability determination for fire sprinklers on October 10, 2023
(2) Operability of service water pumps following 480V bus ground on October 16, 2023
(3) Operability determination for the diesel generator building air handling unit, HX-269, not cooling on October 17, 2023
(4) Operability determination for the nitrogen relief valve for the Unit 1 pressurizer power operated relief valve on December 19, 2023

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)

The inspectors evaluated the following temporary or permanent modifications:

(1) Permanent modification to the 1P-1A reactor coolant pump seal leak-off line

71111.20 - Refueling and Other Outage Activities

Refueling/Other Outage Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated refueling outage U1R41 activities from October 6, 2023, to November 9, 2023.

71111.24 - Testing and Maintenance of Equipment Important to Risk

The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:

Post-Maintenance Testing (PMT) (IP Section 03.01) (8 Samples)

(1) Post maintenance test after maintenance on the 2HX-12D, Unit 2 Component Cooling Water Heat Exchanger, on July 19, 2023
(2) Post maintenance test after the calibration of 2-274/A05, 2A-05 bus degraded voltage relay, on August 16, 2023
(3) Post maintenance test of the auxiliary feed pump discharge valve following stem and actuator lubrication, on October 11, 2023
(4) Post maintenance test after the pressurizer level control system calibration on October 16, 2023
(5) Post maintenance test after relay replacement on the 1-62/A01, bus time delay relay, on November 7, 2023
(6) Post maintenance test after the calibration of the condensate storage tank level instruments using ICP 06.099, Condensate Storage Tank Level Instruments, on November 9, 2023
(7) Post maintenance test after contactors and thermal overload relay testing on the 1MS-02082, 1P-29, auxiliary feedwater turbine-driven pump, overspeed trip starter, on November 16, 2023
(8) Post maintenance test after packing replacement on the 1RH-701, reactor coolant system to P10-A/B residual heat removal pump suction header, motor operated valve on December 14, 2023

Surveillance Testing (IP Section 03.01) (5 Samples)

(1) IT 210, safety injection valve testing during cold shutdown, on October 19, 2023
(2) TS 33, containment accident recirculation fan-cooler units, on October 27, 2023
(3) IT 01A, High Head Safety Injection Pumps and Valves (Cold Shutdown) Unit 1, on November 15, 2023 (4)0-PT-FP-003, Electrical Motor-Driven Fire Pump Functional Test, on October 13, 2023
(5) IT 08A, Cold Start of Turbine-Driven Auxiliary Feed Pump and Valve Test (Quarterly)

Unit 1, on November 27, 2023

Inservice Testing (IST) (IP Section 03.01) (1 Sample)

(1) IT 05 Train A, Train A Containment Spray Pump and Valves Unit 1, on August 23, 2023

Containment Isolation Valve (CIV) Testing (IP Section 03.01) (1 Sample)

(1) ORT 46, Auxiliary Charging Line Unit 1, on October 13, 2023

Reactor Coolant System Leakage Detection Testing (IP Section 03.01) (1 Sample)

(1) Unexpected rise in Unit 2 unidentified leak rate on November 14, 2023

71114.04 - Emergency Action Level and Emergency Plan Changes

Inspection Review (IP Section 02.01-02.03) (1 Sample)

(1) The inspectors evaluated the following submitted Emergency Action Level and Emergency Plan changes.
  • PCR No. 02399684, dated January 6, 2023 This evaluation does not constitute NRC approval.

RADIATION SAFETY

71124.01 - Radiological Hazard Assessment and Exposure Controls

Radiological Hazard Assessment (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated how the licensee identifies the magnitude and extent of radiation levels and the concentrations and quantities of radioactive materials and how the licensee assesses radiological hazards.

Instructions to Workers (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated how the licensee instructs workers on plant-related radiological hazards and the radiation protection requirements intended to protect workers from those hazards.

Contamination and Radioactive Material Control (IP Section 03.03) (3 Samples)

The inspectors observed/evaluated the following licensee processes for monitoring and controlling contamination and radioactive material:

(1) Surveys of potentially contaminated material leaving the radiologically controlled area
(2) Workers exiting the radiologically controlled area
(3) Workers exiting the protected area

Radiological Hazards Control and Work Coverage (IP Section 03.04) (4 Samples)

The inspectors evaluated the licensees control of radiological hazards for the following radiological work:

(1) Reactor coolant pump impeller replacement
(2) Residual heat removal system valve work
(3) Reactor coolant pump seal replacement
(4) Chemical volume control valve work in containment High Radiation Area and Very High Radiation Area Controls (IP Section 03.05) (4 Samples)

The inspectors evaluated licensee controls of the following high radiation areas (HRAs) and very high radiation areas (VHRAs):

(1) Unit 1 demineralizer valve gallery
(2) Unit 1 residual heat removal cubicle
(3) Unit 1 containment keyway entrance
(4) Unit 1 transfer tube boundaries Radiation Worker Performance and Radiation Protection Technician Proficiency (IP Section 03.06) (1 Sample)
(1) The inspectors evaluated radiation worker and radiation protection technician performance as it pertains to radiation protection requirements.

71124.03 - In-Plant Airborne Radioactivity Control and Mitigation

Permanent Ventilation Systems (IP Section 03.01) (1 Sample)

The inspectors evaluated the configuration of the following permanently installed ventilation systems:

(1) Primary auxiliary building ventilation system

Self-Contained Breathing Apparatus for Emergency Use (IP Section 03.04) (1 Sample)

(1) The inspectors evaluated the licensees use and maintenance of self-contained breathing apparatuses.

71124.04 - Occupational Dose Assessment

Source Term Characterization (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated licensee performance as it pertains to radioactive source term characterization.

External Dosimetry (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated how the licensee processes, stores, and uses external dosimetry.

Special Dosimetric Situations (IP Section 03.04) (1 Sample)

The inspectors evaluated the following special dosimetric situations:

(1) Shallow dose equivalent assessment from a discrete radioactive particle

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

MS08: Heat Removal Systems (IP Section 02.07)===

(1) Unit 1 (July 1, 2022 through September 30, 2023)
(2) Unit 2 (July 1, 2022 through September 30, 2023)

MS10: Cooling Water Support Systems (IP Section 02.09) (2 Samples)

(1) Unit 1 (October 1, 2022 through September 30, 2023)
(2) Unit 2 (October 1, 2022 through September 30, 2023)

71152A - Annual Follow-up Problem Identification and Resolution Annual Follow-up of Selected Issues (Section 03.03)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) Review of one bank of the Unit 1 E pressurizer heaters group not cycling
(2) Review of the leaking FS-3764, G-01 diesel generator sprinkler flow switch
(3) Review of NRC identified non-cited violation pertaining to sodium hydroxide concentrations in the spray additive tank

71152S - Semiannual Trend Problem Identification and Resolution Semiannual Trend Review (Section 03.02)

(1) The inspectors reviewed the licensees corrective action program for potential adverse trends in relief valve as-found testing failures that might be indicative of a more significant safety issue. The inspectors observed that there was an increase in corrective action documents related to relief valves of approximately 15 percent compared to previous years. However, the inspectors did not identify any adverse trends that could lead to a more significant safety concern. All of these relief valve testing failures were handled appropriately by the licensee and a majority of these were associated with non-safety related valves.

INSPECTION RESULTS

Failure to Demonstrate Acceptability for Continued Service for Indications Detected in a Reactor Coolant Pump Welded Support Cornerstone Significance Cross-Cutting Aspect Report Section Barrier Integrity Green NCV 05000266/2023004-01 Open/Closed

[H.7] -

Documentation 71111.08P The inspectors identified a finding of very low safety significance (Green) and an associated non-cited violation (NCV) of 10 CFR 50.55a(g)(4) for the failure to evaluate and accept for service a relevant indication in accordance with ASME Section XI requirements. Specifically, the licensee failed to evaluate and accept for continued service a relevant indication found during a regularly scheduled exam of reactor coolant pump (RCP) welded support RCP-A-1-IWA.

Description:

In October 2020, the licensee performed an ASME code required liquid penetrant (PT) exam on RCP welded support RCP-A-1-IWA and identified two relevant linear indications in the area of the weld between the RCP casing and the welded attachment. Due to the general location, and a previous history of surface cracks created by casting shrinkage, the licensee dispositioned both linear indications as casting defects from original construction.

The licensee then contracted with Westinghouse to perform an analytical evaluation and accepted both linear indications for continued service. In Westinghouse evaluation LTR-SDA-20-079-P, Rev. 0, both linear indications were evaluated as casting defects in the casing of the RCP. The fracture evaluation cited historical fracture analysis of similar casting shrinkage defects in the pump casing and thermal aging and embrittlement of the pump casing, to determine maximum permissible flaw sizes for defects found in the pump casing.

The most limiting case accepted a 25 percent through wall flaw in the pump casing, with an aspect ratio of 6:1, for the remaining operating life of the plant. While the depth of both flaws discovered in 2020 was unable to be determined due to material limitations of cast pump casing, historical analysis of similar flaws showed that the flaws were likely to be no deeper than 0.24 inches if they were casting defects. The flaw evaluation determined that both indications were acceptable for continued service using the previous analyses to bound the indications discovered in the field.

In October 2023, during a successive exam performed on the two indications found in 2020, licensee personnel documented the location of linear indication #2 from the 2020 exam as in the centerline of the weld between the pump casing and the welded attachment. Review of previous exam reports for RCP-A-1-IWA from 2010 showed that both linear indications found in 2020 had not been present during the exam performed in 2010.

The inspectors determined that the original flaw evaluation contained in LTR-SDA-20-079-P, Rev. 0 did not evaluate indication #2 for continued service. Specifically, ASME Subsection IWB-3142.4 titled, Acceptance by Analytical Evaluation, states A component containing relevant conditions is acceptable for continued service if an analytical evaluation demonstrates the components acceptability. The original evaluation used fracture mechanics for casting induced service defects to bound the maximum flaw size and historical data from previously detected casting flaws to bound the likely maximum depth of both indications. While this approach may be bounding for the indication contained entirely in the pump casing, it was not appropriate for a service induced flaw in the support weld.

Westinghouse analysis LTR-SDA-20-079-P, Rev. 1 used the standard ASME Section XI, Subsection IWB-3600 flaw analysis methods to predict the future growth of the flaw.

Furthermore, while the original evaluation was for the remaining life of the plant, the revised evaluation was only valid for two operating cycles, when the weld is scheduled to be reexamined and the results used to justify acceptability for the remaining life of the plant.

Corrective Actions: The licensee entered the issue into the corrective action program and reevaluated indication #2 in Westinghouse analysis LTR-SDA-20-079-P, Rev. 1, and accepted both indications for continued service. While the licensee determined the original evaluation remained applicable for indication #1 for the life of the plant, the new evaluation for indication #2 used a different analysis method and also limited the applicability of the analytical evaluation for two operating cycles. Specifically, the new analysis used the flaw evaluation methods of IWB-3600, because the original methodology did not bound flaws identified in the weld material. Continued successive exams of both indications are planned to be performed in accordance with IWB-2420 to verify that the predicted flaw growth for both indications remains bounding.

Corrective Action References: AR 02471725 - ISI Inspection Potential Violation 10 CFR 50.55

Performance Assessment:

Performance Deficiency: The licensees failure to demonstrate the acceptability for continued service of a relevant indication found in a weld of support RCP-A-1-IWA was contrary to ASME Section XI, Subsection IWB-3142.4, and was a performance deficiency.

Screening: The inspectors determined the performance deficiency was more than minor because if left uncorrected, it would have the potential to lead to a more significant safety concern. Specifically, the failure to demonstrate the acceptability of a service induced defect that was allowed to remain in service in an ASME Class 1 support would have the potential to challenge the structural integrity of the support and its associated safety barrier.

Significance: The inspectors assessed the significance of the finding using IMC 0609 Appendix A, The Significance Determination Process (SDP) for Findings At-Power.

Specifically, the inspectors utilized IMC 0609, Appendix A, Exhibit 1, Initiating Events Screening Questions. The inspectors determined the finding was of very low safety significance (Green) because it did not result in an RCS leak or likely affect other systems used to mitigate a loss of coolant accident.

Cross-Cutting Aspect: H.7 - Documentation: The organization creates and maintains complete, accurate and up-to-date documentation. Specifically, the original PT exam report did not adequately describe the location of the two indications. It provided a general schematic photograph and two close-up photographs of the indications. As a result, the licensee did not accurately establish the location of indication #2 in the weld between the support and the pump casing and did not evaluate it correctly for continued service. The inspectors noted similar issues with the additional exam performed on welded support RCP-A-2-IWA, where rounded indications were located only with photographs, rather than quantitative measurements of the location.

Enforcement:

Violation: 10 CFR 50.55a(g)(4) requires, in part, that components (including supports) that are classified as ASME Code Class 1, Class 2, and Class 3 must meet the requirements set forth in Section XI of editions and addenda of the ASME BPV Code. ASME Section XI (2007 edition), Subsection IWB-3142.4 states A component containing relevant conditions is acceptable for continued service if an evaluation demonstrates the components acceptability.

The evaluation and acceptance criteria shall be specified by the Owner.

Contrary to the above, from October 20, 2020, until October 26, 2023, the licensee failed meet the requirements set forth in Section XI of editions and addenda of the ASME BPV Code of a component classified as ASME Code Class 1. Specifically, the licensee did not demonstrate the acceptability for continued service of a relevant indication found in a weld of support RCP-A-1-IWA because they evaluated it as a casting defect in the pump casing of the RCP, when it was a service induced defect in the weld of the support.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

Failure to Establish Acceptance Criteria for ASME Section XI Successive Exam of a Welded Support Cornerstone Significance Cross-Cutting Aspect Report Section Barrier Integrity Green NCV 05000266/2023004-02 Open/Closed

[H.12] - Avoid Complacency 71111.08P The inspectors identified a finding of very low safety significance (Green) and an associated non-cited violation (NCV) of 10 CFR 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the failure to establish appropriate quantitative or qualitative acceptance criteria when performing an ASME Section XI successive exam on RCP welded support RCP-A-1-IWA. Specifically, the licensee did not establish acceptance criteria to determine if the evaluation of the actual indication growth during successive examinations against the predicted growth was satisfactorily accomplished.

Description:

In October 2020, while performing an ASME Section XI liquid penetrant (PT) exam on reactor coolant pump (RCP) welded support RCP-A-1-IWA, the licensee discovered two linear indications exceeding the acceptance criteria of ASME Section XI Table IWB-3410-1. ASME Section XI provides two options for addressing flaws or relevant conditions that exceed the IWB-3410-1 acceptance criteria: repair/replacement activity or analytical evaluation. The licensee accepted the flaws for continued service via Westinghouse analysis LTR-SDA-20-079-P, Rev. 0.

According to ASME Section XI IWB-2420, components with flaws or relevant conditions accepted for service through analytical evaluation must be reexamined for the subsequent three inspection periods. During each successive inspection, the growth of the flaw or relevant condition must be compared with the predicted flaw growth from the analytical evaluation. If the flaw growth remains within the acceptance criteria predicted by the analytical evaluation, the component continues to be inspected for the remaining periods. If the flaw growth exceeds the predicted growth, IWB-2420(d) requires reexamination of the entire component and examination of additional components in accordance with IWB-2430.

In October 2023, the licensee performed the first successive PT exam on RCP-A-1-IWA.

They observed both indications had grown in length by an amount they judged to be small. In AR 02469663, the licensee evaluated the linear indications as essentially unchanged from the previous exam. However, the inspectors noted the licensee did not include growth acceptance criteria in the successive PT exam instructions.

This was noteworthy because indications are detected with PT exams via bleedout, and the size and shape of the bleedout are influenced by the exam itself, in addition to the associated flaw. Consequently, the measurement of the indication does not directly correlate to the flaw measurement. The lack of acceptance criteria for determining growth evaluation created an unclear standard for dispositioning linear indications during successive exams.

Furthermore, as per IWB-2420(d), additional actions are required if the flaws growth exceeds that of the analytical evaluation. However, there was no clear standard for determining if those actions were necessary.

Corrective Actions: The licensee entered the issue into their corrective action program, established growth acceptance criteria for both indications via Westinghouse Analysis LTR-SDA-20-079-P, Rev. 1, and confirmed both indications met the acceptance criteria.

Corrective Action References: AR 02471727 - ISI Inspection Potential Violation App B Criterion V ISI

Performance Assessment:

Performance Deficiency: The licensees failure to establish acceptance criteria for the successive PT exam of RCP-A-1-IWA was contrary to 10 CFR 50 Appendix B, Criterion V, and was a performance deficiency.

Screening: The inspectors determined the performance deficiency was more than minor because if left uncorrected, it would have the potential to lead to a more significant safety concern. Specifically, the failure to establish acceptance criteria for the successive exam of RCP support RCP-A-1-IWA would have the potential to allow growth of a service induced flaw to continue beyond the bounds of the flaw growth predicted by the analytical evaluation.

Such flaw growth would have the potential to challenge the structural integrity of the support and its associated safety barrier.

Significance: The inspectors assessed the significance of the finding using IMC 0609 Appendix A, The Significance Determination Process (SDP) for Findings At-Power.

Specifically, the inspectors utilized IMC 0609, Appendix A, Exhibit 1, Initiating Events Screening Questions, and determined the finding was of very low safety significance (Green)because it did not result in an RCS leak or likely affect other systems used to mitigate a loss of coolant accident.

Cross-Cutting Aspect: H.12 - Avoid Complacency: Individuals recognize and plan for the possibility of mistakes, latent issues, and inherent risk, even while expecting successful outcomes. Individuals implement appropriate error reduction tools. Specifically, due to the licensees position on the identified flaw being acceptable for continued service for the life of the plant, they did not plan for the possibility of a different outcome during the successive examinations. They also did not apply error reduction techniques of ensuring they had all the information necessary to perform the exam to completion, which included verification any identified flaw growth would not require additional exam expansions or evaluations.

Enforcement:

Violation: Title 10 CFR 50 Appendix B, Criterion V, Instructions, Procedures, and Drawings requires, in part, that instructions, procedures, or drawings shall include appropriate quantitative or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished.

Contrary to the above, since approximately October 2020, the licensee failed to establish appropriate quantitative or qualitative acceptance criteria in instructions for determining that important activities have been satisfactorily accomplished. Specifically, the licensee accepted two indications found on RCP welded support RCP-A-1-IWA through analytical evaluation, involving successive ASME Section XI examinations to evaluate actual indication growth against the predicted growth. However, in their successive examination instructions, contained in WO 40748764-01, the licensee did not establish acceptance criteria to determine if the evaluation of the actual indication growth during successive examinations against the predicted growth was satisfactorily accomplished.

Enforcement Action: This violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

Unresolved Item (Open)

Potential Failure to Correct an NRC Identified Violation URI 05000266,05000301/2023004-03 71152A

Description:

In July 2022, the NRC issued a non-cited violation of 10 CFR 50, Appendix B, Criterion V, for the licensees failure to prescribe an appropriate instruction or procedure with the appropriate acceptance criteria for determining the technical specification required concentration of sodium hydroxide in the spray additive tank. Specifically, the licensee failed to include instrument uncertainty when calculating the sodium hydroxide concentration. The licensees corrective action for this violation was to submit a change to the preventative maintenance (PM) model work order, which calculated this concentration.

In 2023, when reviewing the PM work order instructions, the inspectors identified that the procedures were the same as in 2022, ignoring instrument uncertainty. The licensee uses the Asset Information Center (AIC) program to perform PM changes. Inspectors found that the licensee had failed to correctly enter the PM into AIC by leaving the required asset change table empty. This failure caused the PM change to linger in AIC, and the licensee never updated the PM model work order.

Inspectors found no requirements to check the status of PM changes in AIC, and further questioning showed several other PM changes missing similar information. While these other examples were administrative, the oldest change that remained in AIC dates back to 2020.

The licensee performed this work order twice with the incorrect instructions for each unit between July 2022 and October 2023. The results of these tests were within the narrower band, which considered instrument uncertainty.

Planned Closure Actions: Because the inspectors did not gather all of the required information until close to the end of the quarter a URI is being issued. The inspectors need to work with regional experts from the Enforcement & Investigation Coordination Staff team to determine if this violates NRC requirements.

Licensee Actions: Once the licensee became aware of the problem, they updated the asset change table and made assignments to progress the change through the AIC system. The PM model work order has been updated.

Corrective Action References: AR 02472083 - PMC in Screening for Extended Amount of Time and AR 02473217 - CA Untimely due to Inappropriate Closure to PMCR

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On January 8, 2024, the inspectors presented the integrated inspection results to Michael Durbin, Site Vice President, and other members of the licensee staff.
  • On October 20, 2023, the inspectors presented the radiation protection inspection results to Michael Durbin, Site Vice President, and other members of the licensee staff.
  • On November 3, 2023, the inspectors presented the In-service inspection results to Seth Johnson, Site Maintenance Director, and other members of the licensee staff.
  • On November 30, 2023, the inspectors presented the Emergency Action Level and Emergency Plan change review inspection results to Eric Schultz, Regulatory Affairs Manager, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

2467591

Loss of Input from ISFSI

09/21/2023

AOP-21

PPCS Malfunction

OI-111

PPCS ISFSI Thermal Performance Monitoring Alarm

Response

Procedures

OP-AA-102-1002

Seasonal Readiness

40850481-01

PC-49.3 - Cold Weather Preparation for PAB

09/29/2023

71111.01

Work Orders

40850482-01

PC-49.4 - Cold Weather Preparation for PAB and Facades

09/29/2023

Corrective Action

Documents

Resulting from

Inspection

2470239

2MS-2082 Equipment Label

10/21/2023

110E017, Sheet 1

Safety Injection System

110E018, Sheet 1

Auxiliary Coolant System

ISI-2282

Isometric - Auxiliary Feedwater to Steam Generator B

ISI-2338

Isometric - Aux. Feedwater Pump 2P-29

M-217

Auxiliary Feedwater System

107

Drawings

P-241

Emergency Feedwater from DB-3 into CTMT Penetration P-5

CL 13 E Part 1

Auxiliary Feedwater Valve Lineup Turbine-Driven Unit 2

71111.04

Procedures

CL 7A

Safety Injection System Checklist Mode 1, 2, 3 Unit 1

Calculations

2014-0007

Allowable Flood Levels

Corrective Action

Documents

Resulting from

Inspection

2469972

Cart Partially in a Flood Exclusion Zone

10/18/2023

Fire Plans

PFP-1-CONT-

FAC

Pre-Fire Plan Unit 1 Containment Building/Facade

NP 8.4.17

PBNP Flooding Program

71111.05

Procedures

OM 3.27

Control of Fire Protection and NFPA 805 Equipment

AR 02423369

Foreign Material Found on FA 1D19

03/31/2022

AR 02423501

Piping Support Gap Dimensions Exceed Allowable Total

04/01/2022

71111.08P

Corrective Action

Documents

AR 02423534

Foreign Material Discovered on Lower Core Plate

04/02/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AR 02423607

Dry Boric Acid Residue on CETNAS 35 and 37

04/03/2022

AR 02423957

Foreign Material in Primary Side of Steam Generator

04/06/2022

AR 02424003

Indication Found on CTMT Liner Plate at Dome Truss #8

04/07/2022

AR 02424004

Horizontal Gouge Found on the Liner Plate at Dome Truss #2

04/07/2022

AR 02424005

Liner Plate - Working DT# 2 and #8 Removing the Required

04/07/2022

AR 02424259

Foreign Material from U1 Manipulator Bridge

04/09/2022

AR 02424354

Recordable Indications on U1 Containment Moisture Barrier

04/10/2022

AR 02469663

Unit 1 A RCP Welded Attachment Liquid Penetrant Indications

10/15/2023

AR 02469871

Liquid Penetrant Exam Indication Found on CCW Piping

10/17/2023

AR 02469557

NRC Identified - Potential Leak Chase Caulk Degradation

10/13/2023

AR 02470057

NRC Identified: Containment Moisture Barrier Degradation

10/19/2023

AR 02470059

NRC Identified

10/19/2023

AR 02470185

NRC Identified - Boric Acid Screening/Evaluation Deficiencies

10/20/2023

AR 02471725

ISI Inspection Potential Violation 10 CFR 50.55

11/06/2023

Corrective Action

Documents

Resulting from

Inspection

AR 02471727

ISI Inspection Potential Violation App B Criterion V

11/06/2023

Engineering

Changes

EC 298500

Revise DWG. and Calc for Support EB-9-FW-H4 for As-Built

Config

05/26/2023

BAS22-059

Boric Acid Leak Screening R-1 Cetnas 35 and 37

04/04/2022

BAS23-013

Boric Acid Leak Screening 2SI-829B

01/27/2023

BAS23-123

Boric Acid Leak Screening 1SI-835A

10/09/2023

BAS23-124

Boric Acid Leak Screening 1SI-878B

10/09/2023

BAS23-125

Boric Acid Leak Screening 1RH-720

10/09/2023

BAS23-128

Boric Acid Leak Screening 1CV-270A

10/10/2023

BAS23-130

Boric Acid Leak Screening 1SC-950

10/10/2023

BAS23-135

Boric Acid Leak Screening 1P-1A

10/17/2023

LTR-SDA-20-079-

P

Point Beach Unit 1 Reactor Coolant Pump Flaw Assessment

for As-Found Linear Indications During Fall 2020 Refueling

Outage

Rev. 0

LTR-SDA-20-079-

P

Point Beach Unit 1 Reactor Coolant Pump Flaw Assessment

for As-Found Linear Indications During Fall 2020 Refueling

Outage

Rev. 1

Engineering

Evaluations

NPC-47876

Report of Unit 1 Reactor Coolant Pump A Flaw Evaluations

05/01/1989

NDE Reports

2010PT-004

PT of RCP-A-1-IWA

03/18/2010

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2010VT-033

VT-3 of EB-9-FW-H4

03/10/2010

20U1 Ven-005

PT of RCP-A-1-IWA

10/15/2020

20U1Ven-004

PT of RCP-A-2-IWA

10/17/2020

PB1-IWEV-22-

109

VT-3 of Moisture Barrier Section A1-A2

04/13/2022

PB1-PT-23-003

PT of RCP-A-1-IWA

10/16/2023

PB1-UT-23-015

UT of RC-10-AC-1001-03

10/13/2023

PB1-UT-23-016

UT of RC-10-AC-1001-04

10/13/2023

PB1-UT-23-017

MRP-146 UT of RC-10-AC-1001-04

10/13/2023

PB1-UT-23-029

UT of RC-10-AC-1001-03

10/13/2023

PB1-VT-22-012

VT-3 of EB-9-FW-H4

04/08/2022

PB1-VT-23-030

VT-3 of SI-2501R-2-SI-1

10/16/2023

ER-AP-116-1000

Boric Acid Corrosion Control Program

Rev. 8

FP-PE-B31-

P1P8-GTSM-013

Welding Procedure Specification

Rev. 4

NDE-173

PDI Generic Procedure for the Ultrasonic Examination of

Austenitic Piping Welds

Rev. 19

NDE-451

Visible Dye Penetrant Examination Temperature Applications

40F to 125F

Rev. 33

NDE-451

Visible Dye Penetrant Examination Temperature Applications

40F to 125F

Rev. 32

NDE-754

Visual Examination (VT-3) of Nuclear Power Plant

Components

Rev. 24

NDE-757

Visual Examination (VE) ASME Class 1 Components

Fabricated with Alloy 600/82/182 Materials

Rev. 12

NDE-760

VT-1, VT-3 & General Visual Examination of IWE Boundary

Components

Rev. 11

Procedures

WPS 8-MN-

GTAW

Welding Procedure Specification

Rev. 7

WO 40278323

HB-19 Piping Replacement

09/01/2022

WO 40753055

Repair of Degraded Expansion Joints

04/12/2022

Work Orders

WO 40767857

CCW Piping Replacement

03/25/2021

71111.11A

Miscellaneous

Point Beach 2023

Compilation of Licensed Operator NRC Requalification Testing 12/04/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Licensed

Operator Annual

Operating Test

Results

Results for 2023

Corrective Action

Documents

2468823

Emergency Power Supply Light Lit on U2 Turb EH Control

10/06/2023

Miscellaneous

PBN LOC 21B

004S

Simulator Exercise Guide Scenario #4

71111.11Q

Work Orders

40952180

Emergency Power Supply Light Lit on U2 Turb EH Con

10/07/2023

2371361

1CV-1296 Failed Primary Boundary Leak Test

10/12/2020

2442792

Received Unexpected C02E 1-10 G-04 Diesel Trip or Lockout

11/30/2022

2463453

G-04 EDG Fuel Oil Pump

07/30/2023

2466593

G-02-42/FTC2 G-02 FO Pump #2 Relay Failed

09/10/2023

2468875

N-31 SRNI Failed to Energize Following U1 S/D

10/07/2023

2468947

N-40 NI Fission Channel Has Periods of Spiking

10/07/2023

2469615

Retest N-31/N-35 Detector Insulation Resistances in U1R41

10/14/2023

Corrective Action

Documents

2471207

1NI-40A WR Log Power Channel Failed Low

10/31/2023

PBN-1-CI-SYS01

Primary Containment Integrity Maintenance Rule Function

Scoping Document

PBN-1-NI-SYS01

Nuclear Instrumentation Maintenance Rule Function Scoping

Document

PBN-2-DG-

SYS01

Diesel Generator Maintenance Rule Function Scoping

Document

Miscellaneous

PBN-C-125V-

SYS01

25 V DC Maintenance Rule Function Scoping Document

ER-AA-100-2002

Maintenance Rule Program Administration

MA-AA-100-1028

Certification of Quality Control Inspection Personnel

NP 11.1.14

Inspection Planning

NP 11.1.15

Quality Control Inspections

Procedures

PI-AA-104-1000

Condition Reporting

40760699-01

2LT-961 - Replace Sump B Level Transmitter

03/16/2023

40760699-02

2LT-961 - Bench Check Level Transmitter

2/12/2022

71111.12

Work Orders

40774713-01

2/P-038A, P-038A Replace Agastat Relay per FBN 02364452

06/16/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

40836158-08

G-04, Replace BTR and SDRX2 Protective Relays

08/03/2023

40836158-10

G-04, Replace CTL/Protective Contactors FF, FFP1, BPMC,

K1

08/03/2023

40836158-12

G-04, Replace Local-Remote Protective Relays

08/04/2023

40836491-01

G-04 - Replace Alarm Panel Capacitor

08/01/2023

2468875

N-31 SRNI Failed to Energize Following U1 S/D

10/07/2023

2468947

N-40 NI Fission Channel Has Periods of Spiking

10/07/2023

2469317

Transfer Tube Gate Valve Not Fully Shut

10/11/2023

Corrective Action

Documents

2469615

Retest N-31/N-35 Detector Insulation Resistances in U1R41

10/14/2023

110E018, Sheet 4

Auxiliary Cooling System

21595-21

Fuel Transfer Tube

21766-1

Fuel Transfer Arrangement

Drawings

883D195, Sheet

Nuclear Instrument Trip Signals

PBNP Shutdown Safety Assessment and Fire Inspection

Checklist for 10/13/2023 at 0045

10/13/2023

Miscellaneous

PRF-1562

PBNP Shutdown Safety Assessment and Fire Inspection

Checklist, Days

10/21/2023

CL 1E Unit 1

Containment Closure Checklist Unit 1

NP 10.3.5

Risk Monitoring and Risk Management

NP 10.3.6

Shutdown Safety Review and Safety Assessment

Procedures

OP 3B

Reactor Shutdown

40821751

IN-31 DET: Replace SR/IR Detector Assy (IN31/N35)

10/10/2023

71111.13

Work Orders

40830737

1ICP 4.24 - NI Source Range Ch. Insp, Mnt & Cal

10/10/2023

2398724

Sprinkler Deflector Below 1HX-22C MSR

07/16/2021

2463522

Repeat: Sprinkler Deflector Below

1HX-22C MSR/2HX-22C MSR

07/31/2023

2463555

WR Needed to Move Guard on Sprinkler

08/01/2023

2468196

HX-269 Not Cooling

09/29/2023

2468250

Review 1(2)A06 ACMP for an Operator Challenge

09/30/2023

2469640

1B-03 Ground Fault Upon Re-energization

10/15/2023

Corrective Action

Documents

2470289

Relief Valve Previously Installed Incorrectly

10/22/2023

71111.15

Drawings

499B466, Sh 303

1B-03 480V Undervoltage Scheme

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Miscellaneous

ACMP for the 1A-06/2A-06 SWGR Room Temp.

09/30/2023

MA-AA-203-1000

Maintenance Testing

NP 11.1.14

Inspection Planning

Procedures

RMP 9377-1

Relief, Safety, and Safety Relief Valve Installation and

Removal

Drawings

684J741, Sheet 3

Chemical and Volume Control

Engineering

Changes

298474

Replace 1P-1A RCP Seal Housing, Re-Route Bypass Piping

DG-M02

Westinghouse Piping Class Summary

Procedures

EN-AA-205-1104

Standard Design Process

40605130

1P-1A/Install New RCP Seal Housing

10/26/2023

71111.18

Work Orders

40830572

PB1, Unit 1 as Left RCS Pressure Test

11/02/2023

Corrective Action

Documents

2471207

1NI-40A WR Log Power Channel Failed Low

10/31/2023

Corrective Action

Documents

Resulting from

Inspection

2470968

NRC Containment Walkdown

10/28/2023

PBF-2058

Fire Protection/NFPA 805 Fire Surveillance

10/07/2023

Tagout

SI SI-866A-O 01

10/12/2023

Miscellaneous

Tagout

SI SI-878A-O 01

10/12/2023

AD-AA-101-1004

Work Hour Controls

FP-MA-ES-01

Electrical Safety

MA-AA-101-1000

Foreign Material Exclusion Procedure

OP 1B

Reactor Startup

OP 1C

Startup to Power Operation

OP 3C

Hot Standby to Cold Shutdown

OP-AA-100-1007

Conduct of Fuel Handling Activities

OP-AA-101-1000

Clearance and Tagging

RESP 4.1

BOL Physics Tests

71111.20

Procedures

SY-AA-100-1011

Fatigue Management

2462392

2HX-12D As-Found Coating Inspection 2023

07/14/2023

71111.24

Corrective Action

Documents

2469560

1CV-1296, ORT 46 Results Unsat

10/13/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2469864

1ICP 05.021 - Pressurizer Level Control System Calibration

10/17/2023

2470715

IT 01A - High Head Safety Injection Pumps and Valves

(Cold S)

10/26/2023

2471287

2RE-211, Cont. Air Part. Rad Mon. Step Change & Increasing

10/31/2023

2471375

OI 55 Primary Leak Rate

11/01/2023

2471401

OI 55 Primary Leak Rate

11/01/2023

2471407

U2 Increase Unidentified RCS Leakage

11/01/2023

2471421

Operator Challenge Determination

11/01/2023

2471423

Various Boric Acid Buildup Found During U2 Cont Entry

11/01/2023

2471750

2RC-431B PZR Spray Valve Steam Leak

11/06/2023

2462782

The PMT for 2HX-12D Was Questioned due to Vague

Guidance

07/19/2023

2470696

Review OP-AA-100-1000 Guidance

10/25/2023

2471803

NRC Identified M&TE Documented WO Record Copy Was

Incorrect

11/07/2023

2471808

Timely Writing of AR for NRC Identified Issue Not Written

11/07/2023

2471925

ICP 06.099 - Condensate Storage Tank Level Instruments

11/08/2023

2473108

Record Supplement Required for WO 40856397-01

11/27/2023

2473127

IST Sign-Off in IT 08A Not Completed Correctly

11/27/2023

2474630

NRC Identified Work Package Closeout Gap for 1RH-701

Repack

2/15/2023

Corrective Action

Documents

Resulting from

Inspection

2475914

Valve Drawings May Not Reflect Installed Packing

01/04/2024

684J741, Sheet 2

Chemical & Volume Control

684J741, Sheet 3

Chemical & Volume Control

88904

Forged Bolted Bonnet Primary Nuclear Motor Operated Gate

Valve for: ASA 1500 lb. - 10"

Drawings

M-207, Sheet 4

Service Water System

Miscellaneous

Supplement for WO 40830718-01

11/02/2023

IT 03D

RHR Valve Exercise Test for Operation or Shutdown Unit 1

IT 08A

Cold Start of Turbine-Driven Auxiliary Feed Pump and Valve

Test (Quarterly)

IT 210

SI Valves (Cold Shutdown)

Procedures

MA-100-1015

Valve Packing

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

MA-AA-100-1021

Motor Operated Valve Stem Lube and Actuator Gearbox

Grease Inspection

MA-AA-203-1000

Maintenance Testing

OI 55

Primary Leak Rate Calculation

ORT 46

Auxiliary Charging Line Unit 1

RMP 9106

Pressurizer Spray Line Control Valve Maintenance

RMP 9376-2

Limitorque MOV Testing for Gate and Globe Valves

TS 33

Containment Accident Recirculation Fan-Cooler Units Unit 1

40656662-01

1RH-00701 / Repack Valve

10/29/2023

40656662-02

1RH-00701 / Operations PMT

11/08/2023

40656662-03

1RH-00701-O / Perform MOV Actuator Check-out

10/21/2023

40747600

Replace 1CV-01296 During Next Outage

10/13/2023

40811889-01

2A-05, Calibrate Tech Spec Relays

08/16/2023

40811889-11

2-274/A05 Perform Calibration of Degraded Voltage Relay

08/16/2023

40821613-01

1-62/A01 - Calibrate New Replacement Relay

10/02/2023

40821613-02

1-62/A01 - Replace Relay

10/22/2023

40830354-01

1SMS-02082 - Contactor & Thermal Overload Testing

10/16/2023

40830354-03

1MS-2082 - Return to Service

11/08/2023

40830508-01

IT-01A, High Head Safety Injection Pumps/Valves (Cold

Shutdown)

10/26/2023

40830685-01

1-62/A01 - Calib & Test UV Bus Stripping Time Delay Relay

10/25/2023

40830718-01

1ICP 5.21 - Pressurizer Level Control System Calibration

10/19/2023

40830934

AF-4001-0: U1 MOV Stem Lube/Actuator Gearbox Grease

Inspection

10/11/2023

40834570-01

2HX-012D GL 89-13 Open/Inspect/Clean/Close HX

09/15/2023

40834570-02

2HX-012D Operations PMT/RTS

09/15/2023

40834570-21

2HX-012D Contingency Perform Section XI System Leak Test

09/15/2023

40856193-01

ICP 6.99 - Condensate Storage Tanks Level Inst Cal

11/06/2023

40856397-01

IT-08A, 1P-29 AFP Cold Start Test/Valves

11/01/2023

40856421-01

IT-05 Train A

10/02/2023

Work Orders

40856546-01

0-PT-FP-003 Electric Motor-Driven Fire Pump Functional Test

10/13/2023

CFR 50.54(q) Qualification Records (Spreadsheet)

05/05/2023

71114.04

Miscellaneous

NUC EPR 2001

CFR 50.54(Q) Qualification Guide

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

PCR 02399684

50.54(Q) Screening for LAR 296

01/06/2023

EP 8.0

Maintaining Emergency Preparedness

Procedures

EP 8.0

Maintaining Emergency Preparedness

AR 02469336

RCP Draining Water on the 10 Foot Platform

AR 02469531

Two Lapel Air Samplers Faulted

Corrective Action

Documents

AR 02469579

RP Technician Received Dose Alarm

Corrective Action

Documents

Resulting from

Inspection

AR 02470037

Very High Radiation Area Barrier Questioned

10/19/2023

HPIP 1.66

Dosimetry Placement for Extremity and Multiple Whole Body

Locations and Extremity Dose Determination

RP-AA-102-1000

Alpha Monitoring

Procedures

RP-AA-103-1002

High Radiation Area Controls

PBPROD-M-

231014-23

1CV-1296 & 1CV-1426 Removal

PBPROD-M-

231015-11

1RH-709B Cleaning and Gasket Replacement

PBPROD-M-

231015-6

Breach and Posting Change for 1RH-709B

PBPROD-M-

231016-23

1RH-709B-Lapping

PBPROD-M-

231016-8

RCP Lower, A Side O Ring Removal and Shielding Install

Radiation Surveys

PBPROD-M-

231016-9

RCP Lower, A Side Impeller Removal

23-1021

RCP Seal Replacement

23-1032

Containment Valve Maintenance Activities

23-1034

PAB Valve Maintenance Activities

71124.01

Radiation Work

Permits (RWPs)

23-1069

A RCP Impeller Work

Miscellaneous

Crew A SCBA

Qualification

Status

The Self-Contained Breathing Apparatus Qualifications of

Crew A

10/13/2023

71124.03

Procedures

HPIP 3.52

Airborne Radioactivity Surveys

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

NP 4.2.32

Respiratory Protection Program

Work Orders

Work Order

Package

40856649-01

PC-75.1 Perform Maintenance on the SCBA

09/27/2023

Corrective Action

Documents

Resulting from

Inspection

AR 02470095

Dose Assessment Process Enhancements

10/19/2023

Miscellaneous

Personnel Contamination Event Dose Assessment

2/24/2023

HPIP 1.60

Calculating Shallow and Deep Dose Rates due to Skin

Contamination

71124.04

Procedures

NISP-RP-006

Portable Personnel Contamination Monitoring

2ICP 02.003A

Reactor Protection System Logic Train A Surveillance Test

Procedures

PBN-BFJR-18-

054

MSPI Basis Document for PBNP

71151

Work Orders

40827293-01

2P-11B-M, MCE Analyze Motor

08/10/2023

2430785

SAT Analysis Work Order Documentation (NRC Identified)

06/27/2022

2430785

SAT Analysis Work Order Documentation (NRC Identified)

06/27/2022

2472729

SW Leak on FS-3764, G-01 DG Sprinkler Flow Switch

11/19/2023

2472966

One Bank of the E PZR Heater Group Not Cycling

11/23/2023

2473217

CA Untimely due to Inappropriate Closure to PMCR

11/28/2023

Corrective Action

Documents

2474248

Alarm on Fireworks, Leak Now Affecting Electronics of FS

2/11/2023

2472083

PMC In Screening for Extended Amount of Time

11/10/2023

2472083

PMC In Screening for Extended Amount of Time

11/10/2023

2473217

CA Untimely due to Inappropriate Closure to PMCR

11/28/2023

Corrective Action

Documents

Resulting from

Inspection

2473415

PMT WO Task Not Closed

11/30/2023

Drawings

M-208 Sheet 4

P&ID Fire Protec./Sprinkler Sys. Point Beach N.P. Unit 1

Miscellaneous

RSI 4973

The Effect of Vacuum Breaker Maintenance Practices and

Nitrogen Cover Gas Elimination on Spray Additive Tank

Sodium Hydroxide and Concentration Measurements at Point

Beach

MA-AA-204-1000-

10001

Preventive Maintenance Change Request (PMCR)

71152A

Procedures

PI-AA-104-1000

Condition Reporting

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

40819818-01

SAT NAOH SR 3.06.07.3

01/11/2023

40819820-01

SAT NAOH SR 3.06.07.3

01/11/2023

40847898-01

SAT NAOH SR 3.06.07.3

07/13/2023

40847905-01

SAT NAOH SR 3.06.07.3

07/13/2023

40957465-01

1T-1E, One Bank of the E PZR Heater Group Not Cycling

11/24/2023

Work Orders

40957465-02

1C-042, Operations PMT/RTS

11/29/2023

2449867

Relief Valve Lifted and will not Reseat

03/02/2023

2452187

2SI-887 Relief Valve Seal Broken

03/24/2023

2453733

2CS-2108 Relief Valve Failed As-Found Testing

04/07/2023

2454105

2AF-4079B Fail Its As-Found Test after Removal

04/11/2023

2454747

2SW-2963 Relief Valve Failed Its As-Found Test

04/17/2023

2454756

2SW-2959 Relief Valve Failed Its As-Found Test

04/17/2023

2454780

2SW-2885 Relief Valve Failed Its As-Found Test

04/17/2023

2455025

2LO-258 Relief Valve Failed Its As-Found Test

04/19/2023

2455031

2CV-257 Relief Valve Failed Its As-Found Test

04/19/2023

2456037

2AF-4079B Relief Valve Failed Its As-Found Test

04/28/2023

2457217

0SW-04440 Relief Valve Failed Its As-Found Test

05/09/2023

2457544

WL-1330B Relief Valve Failed Its As-Found Test

05/12/2023

2457671

WL-1130A Relief Valve Failed Its As-Found Test

05/15/2023

2457689

SW-4438 Relief Valve Failed Its As-Found Test

05/15/2023

2457796

MRC Cognitive Trend Relief Valves Failing As-Found Testing

05/16/2023

2459247

SW Piping Blockage on SW-2801 Relief Valve Inlet Piping

2462368

2CC-00721D Relief Valve Failed Its As-Found Test

07/14/2023

2462378

2SW-0293 Relief Valve Failed Its As-Found Test

07/14/2023

2463835

DA-6372B Relief Valve Failed Its As-Found Test

08/04/2023

2471083

1SW-0431 Relief Valve Failed Its As-Found Test

10/30/2023

2471355

1CC-747D Relief Valve Failed Its As-Found Test

11/01/2023

2471418

1FD-2412 Relief Valve Failed Its As-Found Test

11/01/2023

2471419

1FD-2410 Relief Valve Information

11/01/2023

2471530

1AF-4079B Relief Valve Failed Its As-Found Test

11/02/2023

2471541

1CS-2187 Relief Valve Failed Its As-Found Test

11/03/2023

2471588

1CC-751 Relief Valve Failed Its As-Found Test

11/03/2023

71152S

Corrective Action

Documents

2471749

1LO-3609 Relief Valve Failed Its As-Found Test

11/06/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2471993

1LO-243 Relief Valve Failed Its As-Found Test

11/09/2023