Security Baseline Inspection Report 05000266/2024403 and 05000301/2024403
ML24344A079
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 12/11/2024
From: Michael Ziolkowski
NRC/RGN-III/DRSS
To: Durbin M
Point Beach
References
IR 2024403
Download: ML24344A079 (1)


Text

SUBJECT:

POINT BEACH NUCLEAR PLANT - SECURITY BASELINE INSPECTION REPORT 05000266/2024403 AND 05000301/2024403

Dear Michael Durbin:

On November 13, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Point Beach Nuclear Plant and discussed the results of this inspection with Jeff Baugniet, Security Manager and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

December 11, 2024 This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Michael E. Ziolkowski, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security Docket Nos. 05000266 and 05000301 License Nos. DPR-24 and DPR-27

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000266 and 05000301

License Numbers:

DPR-24 and DPR-27

Report Numbers:

05000266/2024403 and 05000301/2024403

Enterprise Identifier:

I-2024-403-0027

Licensee:

NextEra Energy Point Beach, LLC

Facility:

Point Beach Nuclear Plant

Location:

Two Rivers, WI

Inspection Dates:

November 04, 2024 to November 13, 2024

Inspectors:

G. Bonano, Physical Security Inspector

Approved By:

Michael E. Ziolkowski, Chief

Security, Emergency Preparedness, and Incident Response Branch

Division of Radiological Safety and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Point Beach Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1)

  • Tier I: All Requirements
  • Tier II: 02.06 a,d; 02.07 a; 02.08 a,b,c,e,i
  • Tier III:

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On November 13, 2024, the inspectors presented the security baseline inspection results to Jeff Baugniet, Security Manager and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Miscellaneous

NextEra Energy Point Beach, LLC

Point Beach Nuclear Plant

PSP, T&QP, SCP and ISFSI Security Program

CS-R3.4

Two-Person (Line of Sight) Rule for VA Entries

PBSAP 1.22

Patrols

PBSAP 1.3.2

Vehicle Processing

PBSAP 1.3.4

Personnel Searches

PBSAP 6.1

Access Point Officers

PBSAP 6.3

Post 3, Gatehouse Officer

PBSRP 2.65

Security Keys, Locks, Combinations and Passwords

PBSRP 3.1

Emergency and Delivery Search Exceptions

SY-AA-102-1000

Safeguards Information Program

SY-AA-102-1020

Security Badge Control and Use

SY-AA-102-1021

Conduct of Personnel Searches

SY-AA-102-1022

Vehicle and Material Searches

SY-AA-102-1023

Visitor Access Control

SY-AA-102-1024

Escorting Vehicles and Material

SY-AA-102-1026

Security Posts and Patrols

SY-AA-102-1027

Preparation and Response to Demonstrations, Strikes and

Labor Disputes

SY-AA-102-1028

Security Systems and Equipment Compensatory Measures

71130.02

Procedures

SY-AA-102-1029

Controlling Gates and Vehicle Barriers

5