IR 05000261/1979001
| ML14358A396 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 02/16/1979 |
| From: | Sutherland J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Jackie Jones CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML14175B024 | List: |
| References | |
| NUDOCS 7903280084 | |
| Download: ML14358A396 (2) | |
Text
- 'R REGO UNITED STATES UNUCLEAR REGULATORY COMMISSION REGION II Z
101 MARIETTA STREET, ATLANTA, GEORGIA 30303 In Reply Refer To:
FEB 1 6 1979 RII:GRJ 50-261/79-1 Carolina Power and Light Company ATTN:
Mr. J. A. Jones Executive Vice President Engineering, Construction and Operation 411 Fayetteville Street Raleigh, North Carolina 27602 Gentlemen:
This refers to the inspection conducted by Mr. G. R. Jenkins of this office on January 8-12, 1979 of activities authorized by NRC License N DPR-23 for the H. B. Robinson 2 facility, and to the discussion of our
.
findings held with Mr. R. B. Starkey at the conclusion of the inspectio Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspecto Within the scope of this inspection, no items of noncompliance were disclose We have examined actions you have taken with regard to previously identi fied enforcement matters and unresolved items. The status of these items is discussed in the enclosed repor In accordance with Section 2.790 of the NRC's "Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. If this report contains any information that you (or your contractor)
believe to be proprietary, it is necessary that you make a written appli cation within 20 days to this office to withhold such information from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the documen If we do not hear from you in this regard within the specified
- period, the report will be placed in the Public Document Roo O~
- FEB 1 61979 Carolina Power and Light Company-2 Should you have any questions concerning this letter, we will be glad to discuss them with yo
Sincerely, Jack T. Sutherland, Chief Fuel Facility and Materials Safety Branch Enclosure:
Inspection Report No. 50-261/79-1 cc w/enclosure:
Mr. R. B. Starkey Plant Manager Post Office Box 790 Hartsville, South Carolina 29550