U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Report No. 50-255/87028(DRS)
Docket No. 50-255 License No. DPR-20 Licensee:* Consumers Power Company 212 West Michigan Avenue Jackson, MI 49201 Facility Name:
Palisades Nuclear Generating Plant Inspection At:
Covert, Michigan Inspection Conducted:
October 26-30, 1987 Inspector:
S. D. Eick ~
"i~. t,:.J__
. ~~µ.
Approved By:.?'M~ P. Phillips, Chief Operational Programs Section Inspection Summary 12/1~;
1~7 Date rz.- 14-87 Date i 2ji'f/.f7 Date Inspection on October 26-30, 1987 (Report No. 50-255/87028(DRS))
..
Areas Inspected:
Special safety inspection of the licensee's activities with respect to Inspection and Enforcement Bulletin No. 85-03, 11Motor-Operated Valve Failures During Plant Transients Due to Improper Switch Settings.
..
Results:
Of the areas inspected, no violations or deviations were identified.
8712210275 871217 PDR ADOCK 05000255 Q
DETAILS Personis Contacted Consumers Power Company
- l( ;l( ;l( ;l( ;l( ;l( ;l( ;l(
- l'\\ ;l( ;l( ;l( ;l( ;l( ;l( )l: ;l( ;l( M. Brzezinski, Superintendent, Instrumentation and Control A. Fenech, Superintendent, Operations K. Ford, System Engineer P. Hoffman, Plant Manager
.
.
W. Joos, Manager, Administration and Planning R. Kalbach, B&W Site Supervisor
.
B. Kasper, Superintendent, Electrical Maintenance S. Kozup, Technical Engineer G. Lewis, Technical Director J. Malone, Nuclear Licensing Analyst E. McCaleb, Director, QA
.
.
D. Orose, Manager, Engineering and Maintenance E. Osborne, SLlperintendent, Projects J. Palmisano, Superintendent, System Engineering M. Rice, Manager, Operations L. Smith, System Engineer
.
C. Tawney, Superintendent, Mechanical Maintenance A. Vincent, Plant Safety Engineer U.S. Nuclear Regulatory Commission
- l(B. L. Burgess, Chief, Projects Section 2A
.
- l(F. J. Jablonski,
- hief, Quality Programs Section
- l(E. R. Swanson, Senior Resident Inspector
- l(T. V. Wambach, NRR, Licensing Project Manager
)!:Denotes those who attended the exit meeting on October 30, 1987.
Additional plant technical and administrative personnel were contacted by the inspectors during the course of this inspectio.
IE Bulletin Followup (Open) IEB 85-03:
Motor-Operated Valve (MDV) Common Mode Failure During Plant Transients Due to Improper Switch Setting During this inspection, Palisades was in a maintenance outage in which IE Bulletin 85-03 program actions were being implemente Consumers Power had selected MOVATS, Inc. to perform diagnostic testing of their valve operators and MOVATS was to interpret and provide results for each operator teste The overall program being implemented on site, notwithstanding the need for some additional development, appeared Qenerally satisfactor Palisades had included all their MOVs in their diagnostic testing program, with all valves receiving a refurbishmen The licensee had written an.
administrative procedure entitled 11Methodology Document for Responding to
NRC IE Bulletin 85-03 11 which gave a focus to the valve testing activities and appeared to be responsive to the goals and intent of the bulleti During this inspection, in addition to reviewing the licensee 1s bulletin response, the inspectors reviewed drawings, procedures, and engineering records; discussed the valve test program being implemented; reviewed test data; and received additional documents for further review and discussio The detailed inspection findings are addressed below: Bulletin Responses Dated July 31, 1987 and September 17, 1987 b.
One area of concern resulted from a review of these response The responses indicated that, for Item c, current plans were to test as many valves as practical that were identified in the bulletin at the maximum differential pressure; howev~r, if plant conditions prohibited the differential pressure test, the 11 MOVATS data base for valve operation against a differential pressure 11 would be substituted for the performance of these tests. During the inspection the licensee indicated they intended to use a data base formulated from their own testing as substitution for the performance of these tests, not a data base from MOVAT The licensee had agreed to clarify this response in their final report that would be submitted_to the NRC within 60 days of the program 1s completio This clarification is considered an open item (255/87028-0l(DRS)).
Limitorgue-Operated, Rising Stem, Gate and Globe Switch Setting Eva I uati on The concern expressed by IE Bulletin 85-03 was about the proper setting of switches that control the operation of ~otor-operated valve Action Item b of the bulletin required that correct switch settings be established; Item c required differential pressure testing, preferably, or other justification to demonstrate operability with the settings from Item b; and Item d required plant procedures that would assure the maintenance of correct switch settings throughout plant lif Because of prevalent industry practice, most valves covered by the bulletin are Limitorque-operated, rising stem, gate or globe valve This was the case for the twenty-four (24) Palisades valves listed in the September 17, 1987 1 bulletin response by Consumers Powe Below is a list of the switches involved and concerns for their proper setting, typical setting approaches that have been taken, and either the resolution adopted at the Palisades plant or an identification of the need for additional information or other actio The switches discussed are named:
Thermal overload relay
_
Open torque switch Close torque switch
Geared limit switch Open limit Open indication Open torque switch bypass Closed limit Close indication close torque switch bypass (1) Thermal Overload Relay Discussion:
Thermal overloads are sometimes used to protect motor winding insulation from breakdow Devices used appear to uniformly consist of heaters at the motor control center which trip a heat sensitive relay, the contacts of which either interrupt current to the contactor closure coil (which stops the motor) or initiate an overload alarm, or both~ Where thermal overload relays stop operator motor rotation on tripping, the heaters must either be sized to prevent inadvertently stopping the motor or bypassed when motor operation is important-to.
safety, and, they should be sized to protect the motor windings from thermal damag Designs that are being used at this time to eliminate the threat of inadvertent motor trips include:
(1) removing the heaters or relay contacts from.use, (2) using the relay contacts for
.
alarm only, (3) bypassing the relay contacts during all operating modes except when a valve is being exercised for testing, (4) bypassing the relay contacts only during the presence of an automatic safety actuation signal, and (S) oversizing the thermal overload Problems noted with the above designs (with respect to preventing inadvertent trip) include inadequate surveillance of the bypass function (No. 3 and 4), failure to protect the remote manual operation function (No. 4), error in determining proper heater size and failure to install the heater specified (No. 4 and 5), and failure to consider actual running loads which often exceed rated values during valve closure at high system pressures (No. 4 and 5).
No problems have been noted with designs 1 and With respect to protecting the motor windings from thermal damage, the remote location of the thermal overload relay (at the motor control center) prevents it from sensing actual winding temperatur Also, the motor has a long thermal decay time in comparison to the rela These two factors prevent thermal overload protection of the windings during valve setup and testing when frequent stroking at unknown motor current levels can result in exceeding the motor duty cycl The solution is to be knowledgeable of valve running currents and stroke times, and to limit the frequency of valve stroke cycles accordingl **
Site Specifics: Palisades uses thermal overloads for alarm purposes only, lighting a bulb in the control room above the appropriate valve control switc Hence, inadvertent stopping of valve motion is prevented. Since the thermal overloads cannot protect the motor windings, other precautions and measures were provided as follows:
(1)
The electrical maintenance crews and operations personnel were aware of valve duty cycle The bulletin valves were AC powered, and have a 15-minute duty cycle, and a maximum actual stroke time between 5-60 second Therefore, a valve can be stroked up to 15 times at rated current without exceeding the allowable limi ( 2) * The sensitivity of AC va 1 ve operator current is fairly independent of increased loads for a considerable portion of motor torque rang (3)
MOVATS current trace data is available to evaluate any problem Using the thermal overloads for alarm purposes only, along with the precautions mentioned, adequatley eliminates any concern with respect to this issu (2)
Open Torque Switch Discussion: This switch is normally used as a mechanical fuse to limit the mechanical thrust applied to a valve or op~rator when stroking the valve in the open direction. It generally provides no normal control function and is a backup for some other failure-that may cause its nee Because this switch is always bypassed during initial valve unseating, which is the most challenging portion of the open valve stroke, its actual value in providing mechanical protection is questionable. Failure to set it (or its bypass) properly, however, can cause valve failur In fact, this was the cause of the Davis-Besse event that led to !EB 85-0 Plant designs have evolved such that some use the open torque switch (primarily PWRs) and others do not (primarily BWRs).
If the switch is used, it must be set properly (in conjunction with the associated bypass switch) to enable the valve operator to apply adequate thrust on the valve stem to operate the valve against the limiting differential pressure (dp).
Some licensees have tested valve opening against dp by using a hydro pump as the pressure sourc Unfortunately, the pump capacity allows the pressure to decay before the torque switch becomes 11unbypassed
and the results are inconclusive with respect to torque switch setting adequac A process pump can be used to sustain the dp-and overcome this weaknes With either technique; diagnostic capabilities are available to assess the results and to better determine both setting adequacy and setting margi (3)
Diagnostic testing can determine the valve thrust available at torque switch trip without any existing dp; however, previously used, standard calculations for thrust requirements are considered inadequate. If testing without dp is used to provide the only assurance of valve thrust capability, the burden is on the licensee to show the adequacy of the calculated requirement against which it is compare When the open torque switch is used, low voltage considerations require a torque switch setting upper limit to assure that the*
operator motor is capable of tripping the torque switch under reduced plant voltage condition This is provided in recent plants by an appropriately sized torque switch limiter plat (A negative aspect of this is that the thrust limit from the operator will still be thus limited by the upper torque switch setting when nominal voltage is available.)
Site Specifics:
The open torque switch was bypassed for all bu! let1n valves except for four in the HPSI system; hence, these four were the only ones of concern in properly setting this switc Differential pressure (dp) testing had already been completed, with some data collected, on one train of the HPSI valve Problems were encountered during the dp testing which included the failure of test equipment during one test and inadequate valve performance during anothe Due to plant conditions at the time of testing, the other train of HPSI valves were not tested against d Because of this and problems encountered with the HPSI train that was tested, it was not clear how the licensee would assure adequate torque switch settings with margin to allow for wear and degradation in the futur Hence, the setting of the open torque switch for the four HPSI valves of concern is an open item pending further licensee action and submittal of the final report required by the bulletin (255/87028-02(DRS)).
Close Torque Switch Discussion:
The close torque switch is normally used to stop motor rotation on the completion of valve travel in the close direction. Since it provides a normal control function and is exercised on every closure stroke, setting generally needs more careful consideration than for the open torque switc The limiting requirement for closure is at the end of travel when the thrust requirements are highest, the affect on flow control is most significant, and when the switch is almost never bypasse Hence 1 it is very important that the thrust at torque switch trip equal the most limiting closure thrust requirement and that margin be available to allow for valve and operator degradation between retests, refurbishment, etc.
Differential pressure testing, using system process pumps, with appropriate data gathering and diagnostic evaluation is a positive means of assuring adequacy with margi Other approaches may be considered adequat One would be to periodically test against full dp without diagnostics. Another might be to do an opening dp test (using a hydro pump and diagnostics) and extrapolate that data to closing by adding two times the 11 stem area times system pressure 11 to determine a ballpark closing thrust requirement; then, use diagnostics to assure that the 11closure thrust -at torque switch trip 11 matches that number with margi The upper end of stem thrust is limited by valve and operator design.. It.happens t~at ~he Limitorque op~rator can excee9 its own rating if the design is not proper or if the torque switch is set too hig After the torque switch trips, the motor continues to run at full speed until the motor contactor opens, continuing to thrust load the stem beyond that required for valve operatio Then, inertial affects continue to add load until the motor is at res The final load must be less than that resulting in damage to the valve or operato If the design is improper, the final stem thrust load may exceed upper limits even if the torque switch is set for a thrust trip point below that required for proper operatio Normally, however, there should be an acceptable range within which both upper and lower thrust limits can be me Undervoltage considerations can have an important impact on the close torque switch setting. Since the torque switch must open to stop motor rotation in the close direction, any time low voltage is present such that enough torque cannot be developed to trip the torque switch, the motor will cook at locked rotor condition This will trip a thermal overload or cause motor winding burnou Hence, it is important that (1) the torque switch limiter plate be sized properly with consideration for low voltage qualification of the valve operator, (2) that the
- limiter plate remain installed and is not modified to allow higher switch settings, and (3) that the voltage at the valve (not the motor control center or main bus) be guaranteed at stall torque (or locked rotor} conditions to be equal to or greater than that for which the operator is qualifie Other factors in assuring an adequate torque switch setting are valve and valve operator mechanical condition Gate valve seat friction factors being determined lately appear to be anywhere from half to twice that assumed in the past using previously accepted formulas; filed measurements of stem thrust show that valve stem thread lubrication may impact thrust values by a factor or two; stem packing tightening has been shown to be a significant factor, actually causing motor burnout in more severe cases of overtightenin These concerns have to be
addressed by maintenance, surveillance, and post maintenance test programs, not only to assure that the torque switch setting will correspond to an acceptable thrust, but to assure that all other operability factors are maintained as wel Site Stecifics:
All twenty-four bulletin valves close with the closeorque switch limiting torqu Similar concerns addressed in the discussion concerning open torque switch setting adequacy and testing apply to the close torque switch; however, the licensee intends to perform more extensive dp testing with simultaneous data collection using MOVATS diagnostic equipmen This testing with data collection and evaluation should provide a much sounder base for assuring proper valve operation and
. should indicate the operating margin provided by the operator at the torque switch setting selecte The resolution of bulletin concerns with respect to the close torque switch will be considered an open item pending the completion of testing and test evaluation (255/87028-03(DRSJ). *
Undervoltage considerations for th~ bulletin valves have not been directly evaluated to assure that the valves will remain operable in the event of an undervoltage conditio However, an undervoltage analytical evaluation was performed on a LPSI injection valve which concluded that sufficient voltage was available to ensure proper response of the individual load and proper response of the other combined loads (some bulletin valves included) on the Motor Control Center (MCC).
Since the LPCI valve.analyzed was a 11 limiting case 11 for motor and wire size, the inspectors viewed the conclusion that the bulletin valves would also be responsive in undervoltage conditions as appropriat The inspectors recommended that the licensee take voltage readings on a selected number of bulletin valves to
.
assure that the analysis done on the LPSI valve.was indeed valid for the other valve This was done, and a review of the data indicated that the undervoltage concern had been adequately addressed by the license (4)
Open Limit Switch Discussion:
The open limit switch is normally taken from the No. 4 contacts on the Limitorque geared limit switch 11open
rotor. It provides the control function of determining the upper limit of valve stem travel in the open direction and stops motor rotation by opening the circuit to the associated motor contactor coi The setting of this switch must assure an adequate valve stroke but, normally, must prevent backseatin Valve backseats are normally to provide a seal that is redundant to the valve packing in order to allow packing replacement without the need to drain down the process syste They are not normally used otherwise, and inadvertent or deliberate
backseating using the power of the motor-operated, or motor inertia, can and has caused valve stem shearing, stem thread twisting, and valve bonnet-metal working until stem scoring and packing blowout occurre Hence, it is important to set the open limit switch away from the backseat and with enough margin to allow for motor contactor dropout time and inerti Independent verification (test, etc.) should follow any setting of the switch to assure it is done properl This is also the switch that some licensees adjust to mee Plant Technical Specification stroke time limits. While this practice should be discouraged, no problems are known to have been identified from this practic Site Specifics:
The Palisades bulletin valves "open on limit" using the open limit switch to stop the motor before the valve stem backseat MOVATS diagnostic testing was used to assure adequate limit switch settings which prevents backseating of valves. Also, the licensee had provided an adequate maintenance program (through procedures and training) that ensured additional stem travel would be available after electric operation. This was done manually using the handwhee It was also the philosophy of the licensee never to deliberately backseat the valve on motor operation. Since the valves were properly guarded against backseating there was no concern with respect to this switch settin (5)
Open Indication Discussion:
Open indication is usually identified by the presence of a light that goes out only when the valve is fully close Common practice has been to derive on/off contacts for this light from the Limitorque geared limit switch, "close" roto In the past, this rotor was set to turn (or switch) very close to the end of valve closure. It is recognized now, however, that the open torque switch bypass (when used) often uses this same roto The setting of the point where the rotor turns has conflicting requirements for these two switche In setting for ideal position indication, there is not adequate bypass of the torque switch to assure valve operability; conversely, changes to satisfy the bypass requirements have resulted in false valve position indication. Hence, resetting of the "close" rotor to address open torque switch bypass concerns must be accompanied by an evaluation of the affect on position indication and other switches on the same rotor as necessar Site Specifics: All of Palisades 1 valves used four rotor geared limit switches with the open indication moved from Rotor No. 2 to Rotor No. 4; therefore, eliminating the problems identified with having the open indication and the open torque switch bypass on the same rotor. All concerns with this switch setting have been adequately addressed by the license *
(6)
Open Torque Switch Bypass Discussion:
When an open torque switch is used, the bypass switch is required to bypass it during the initial portion of the open stroke so that the torque switch will not prematurely stop valve travel due to high torque conditions required for initial valve movemen There is no clear answer on where to set the bypass; but, if the valve operator (not the stem) has moved 20% of its.tota 1 travel di stance away from the seat when the bypass opens has been accepted as adequat Note on earlier discussion items that the open torque switch is not a necessary requiremen When it is used, however, it requires the bypass which has conflicted in use with the setting of the switch used for open valve indicatio Hence, the use of any of these switches cannot be considered independently of the other Site Specifics:
The open torque switch bypass was being used only for four bulletin valves in the HPSI system, with all others having the open torque switch taken completely out of the open logic via a jumpe The four valves that did use the bypass were being set to open approximately 20%-25% of the total distance away from the seat and were being verified as adequate by MOVATS testing. These actions satisfy any concerns with regard to this switch settin (7)
Close Limit Discussion:
The close limit switch is not often used on r1s1ng stem valve When it is, it is usually related to addressing a special valve problem or application and takes the place of the close torque switch in opening up the motor circuit at the end of valve closure. It may be used with or without a close torque switch in series with it for over torque protectio (the same switch in parallel with the torque switch would be called a close torque switch bypass.)
While special considerations (particularly setting precision and repeatability) are involved, there are no known problems occurring with this application to be concerned abou This is probably due to the special attention this type of application receives, the fact that it may be a more reliable design than with the torque switch, and because the valve population using this feature is smal Site Specifics:
None of the licensee 1 s bulletin valves were wired to 11close on limit.
Motor rotation was being stopped by actuation of the close torque switch in all cases.
(8) Close Indication Discussion:
Close indication is usually identified by the presence of a light that goes out only when the valve is *
fully ope Common practice has been to derive on/off contacts
for this light from the Limitorque geared limit switch, 11open
roto This rotor turns 90 degrees at the end of the open stroke to turn out the close indication light, leaving the open indication light on to show a fully open condition. While concern exists for the point of setting for the open indication light, as indicated earlier, there has been no problem identified with the setting of the switc Site Specifics:
No anomalies or concerns for the setting of this switch were revealed by the inspection of the valve schematic diagrams or discussions with the licensee's staf (9) Close Torque Switch Bypass Di sc.ussi on:
The close torque switch bypass acts in the same manner as the open torque switch bypass; however, contrary to its counterpart's function, it normally bypasses the torque switch during the lightest duty portion of the strok In fact, it is not normally required at all to get the valve stroke started unless, perhaps, the valve has been backseated prior to the close strok Some designs do not incorporate a close torque switch bypass while others use up to a 95% to 98% bypass to eliminate uncertainties with the close torque switch for as much of the valve stroke as reasonable possibl There appears to be merit to the extended bypass, especially if surveillance testing, maintenance, etc., is less than fully adequate in assuring torque swit:h setting accurac Site Specifics:
The licensee used a close torque switch bypass which opened early in valve travel. Since the valves were properly guarded against backseating there was no concern with respect to this switch settin Maintenance of Correct Switch Settings Action item d of the bulletin required procedures that would ensure the adequacy of correct switch settings throughout plant life. This would involve all programmatic activities that assure long term valve operability because degradation of either the valve or operator affect the adequacy of the torque switch settings. This adequacy assurance has to be continued after certain maintenance activities (such as packing adjustments) are made with surveillances properly considering all switch setting The licensee indicated during the inspection that their long-term operability program had not yet been fully established; however, Palisades did have good detailed maintenance procedures concerning the refurbishment/repair of Limitorque MOVs that were revised and rewritten by Babcock & Wilcox to ensure that switch settings were properly set and maintaine Consumers Power had been actively involved in providing training for its employees with regard to the electrical and mechanical refurbishment/set-up of the Limitorque motor operator Actual refurbishment/set-up was being performed by Babcock & Wilcox engineers and field technicians with Palisades 1 employees assisting with the wor According to the licensee 1s bulletin response, it was their intent to continue with contracted experts (e.g., B&W, MOVATS) in future testing of the operator The inspector commented that it could be to the licensee 1s benefit if their own employees were more closely involved in these activitie The licensee had committed to address their plans for a long-term operability program in the final written report to be submitted on test program completio Inspection and resolution of this item is pending further evaluation and action by the licensee and is considered an open item (255/87028-04(DRS)). Open Items Open items are matters which have been discussed with the licensee, which will be reviewed further by the inspector, and which involve some action on the part of the NRC or licensee or bot Open items disclosed during the inspection are discussed in Paragraphs 2a, 2b(2), 2b(3), and 2.
Exit Interview The inspectors met with the licensee representatives (denoted in Paragraph 1) on October 30, 1987, to discuss the scope and findings of the inspectio The licensee acknowledged the statements made by the inspectors with respect to items diJcussed in the repor The inspector also discussed the likely informational content of the inspection report with regard to documents or processes reviewed by the inspectors during the inspectio The licensee did not identify any such documents/processes as propriet '
I
'
.*
,.
l U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Report No. 50-255/87028(DRS)
Docket No. 50-255 License No. DPR-20 Licensee:
Consumers Power Company 212 West Michigan Avenue Jackson, MI 49201 Facility Name:
Palisades Nuclear Generating Plant Inspection At:
Covert, Michigan Inspection Conducted:
October 26-30, 1987 Inspector:
P. R. Wohld fcA, I({~
S. D. Eick ~
o. [,:.Jc__
~-~V Approved By:~~";rP~illips, Chief Operational Programs Section Inspection Summary
!2-/1q/~ Date 1-i.- 14-87 Date i 2j;'f/.f7 Date Inspection on October 26-30, 1987 (Report No. 50-255/87028(DRS))..
Areas Inspected: Special safety inspection 9f the licensee's activities with respect to Inspection and Enforcement Bulletin No. 85-03, 11Motor-Operated Valve Failures During Plant Transients Due to Improper Switch,Settings.il Results:
Of the areas inspected, no violations or deviations were identifie *
(Open) IEB 85-03:
Motor-Operated Valve (MOV) Common Mode Failure During Plant Transients Due to Improper Switch Setting During this inspection, Palisades was in a maintenance outage in which IE Bulletin 85-03 program actions were being implemente Consumers Power had selected MOVATS, Inc. to_perform diagnosti~ testing of their valve operators and MOVATS was to interpret and provide results for each operator teste The overall program being implemented on site, notwithstanding the need for some additional development, appeared ~enerally satisfactory. Palisades had included all their MOVs in their diagnostic testing program, with all valves receiving a refurbishmen The licensee had written an.
administrative procedure entitled 11Methodology Document for Responding to
'*
NRC IE Bulletin 85-03 11 which gave a focus to the valve testing actiyit1es and appeared to be responsive to the goals and intent of the bulleti During this inspection, in addition to reviewing the licensee's bulletin response, the inspectors reviewed drawings, procedures, and engineering records; discussed the valve test program being implemented; reviewed test data; and received additional documents for further review and discussio The detailed inspection findings are addressed below: Bulletin Responses Dated July 31, 1987 and September 17, 1987 One area of concern resulted from a review of these response The responses indicated that, for Item c, current plans were to.test as many valv~s as practical that were identified in the bulletin at t8e maximum differential pressure; howev~r, if plant conditions prohibited tne differential pressure test, the 11 MOVATS data base for.valve operation against a differential pressure" would be substituted for the performance of these tests. During the inspection the licensee indicated they intended to use a data base formulated from their own*
testing as substitution for the performance of these tests, not a data base from MOVAT The licensee had agreed to clarify this response in their final report that would be submitted.tq th~ NRC within 60 days of the program 1s completio This clarification is considered an open item (255/87028-0l(DRS)).
Limitor Risin Stem, Gate and Globe Switch Settin The concern expressed by IE Bulletin 85-03 was about the proper setting of switches that control the operation of motor-operated valve Action Item b of the bulletin required that' correct switch settings be established; Item c required differential pressure testing, preferably, or other justification to dem9nstrate operability with the settings from Item b; and Item d required plant.procedures that would assure the maintenance of correct switch settings throughout plant lif Because of prevalent industry practice, most valves covered by the bulletin are Limitortjue-operated, rising stem, gate or globe valve This was the case for the twenty-four (24) Palisades valves listed in the September 17, 1987, bulletin response by Consumers Powe Below is a list of the switches involved and concerns for their proper setting, typica1 setting approaches t~at have been taken, and either the resolution adopted at the Palisades plant or an identification of the need for additional information or other actio The switches discussed are named:
Thermal overload relay
.
Open torque switch Close torque switch
Geared limit switch Open limit.
Open indicatiol)
Open torque switch bypass Closed limit Close indication close torque switch bypass (1) Thermal Overload Relay Discussion~ Thermal overloads are sometimes used to protect motor.winding insulation from breakdow Devices used appear to uniformly consist of heaters at the motor control center
~hich trip a heat sensitive relay, the contacts of ~hich either interrupt current to the contactor closure coil (which stops the motor) or initiate an overload alarm, or bot Where thermal overload relays stop.operator motor fOtation on trippin~,
the heaters must either be sized to prevent inadvertently stopping the motor or bypassed when motor operation is important to.
safety, and, they should be sized to protect the motor windings from thermal damag Designs that are being used.at this time to eliminate the threat of inadvertent motor trips include:
(1) removing the heaters or relay contacts from.use, (2) using the relay ~ontacts for
.
alarm only, (3) bypassing the relay contacts during all operating modes except when a valve is being exercised for testing, (4) bypassing the relay contacts only during the_presence of an automatic safety actuation signal, and (5) oversizing the thermal overload Problems noted with the above designs (with respect to preventing inadvertent trip) include inadequate surveillance of the bypass function (No. 3 and 4), failure to protect the remote manual operation function (No. 4), error in determining proper heater size and failure to install the heater specified (No. 4 and 5), and failure to consider actual running loads which often exceed rated values during valve closure at high system pre~sures (No. 4 and 5).
No problems have been noted with designs 1 and With respect to protectil)g the motor windings from thermal damage, the remote location of the thermal overload relay (at the motor control center) prevents it from sensing actual winding temperature. Also, the motor has a long thermal decay time in comparison to the rela These two factors prevent thermal overload protection of the windings during valve setup and testing when frequent stroking at unknown motor current levels can result in exceeding the motor duty cycl The solution is to be knowledgeable of valve running currents and stroke times, and to limit the frequency of valve stroke cycles accordingl *
Site Specifics: Palisades uses thermal overloads for alarm purposes only, lighting a bulb in the control room above the appropriate valve control switc Hence, inadvertent stopping of valve motion is prevented. Since the thermal overloads cannot protect the motor windings, other precautions and measures were provided as follows:
(1)
The electrical maintenance crews and operations personnel were aware of valve duty cycles. The bulletin valves were AC powered, and have a 15-minute duty cycle, and a maximum actual stroke time between 5-60 second Therefore, a valve can be stroked up to 15 times at rated current without exceeding the allowable limi (2)
The sensitivity of AC valve operator current is fairly independent of increased loads for a considerable portion of motor torque rang (3)
MOVATS current trace data is available to evaluate any problem Using the thermal overloads for alarm purposes only, along with the precautions mentioned, adequatley eliminates any concern with respect to this issu (2)
Open Torque Switch Discussion: This switch is normally used as a mechanical fuse to limit the mechanical thrust applied to a valve or operator when stroking the valve in the open direction. It generally provides no normal control function and is a backup for some other failure that may cause its nee Because this switch is always bypassed during initial valve unseating, which is the most challenging portion of the open valve stroke, its actual value in providing mechanical protection is questionable. Failure to set it (or its bypass) properly, however, can cause* valve failur In fact, this was the cause of the Davis-Besse event that led to IEB 85-0 Plant designs have evolved such that some use the open torque switch (primarily PWRs) and others do not (primarily BWRs).
If the switch is used, it must be set properly (in conjunction with the associated bypass switch) to enable the valve operator to apply adequate thrust on the valve stem to operate the valve against the limiting1differential pressure (dp).
Some licensees have tested valve opening against dp by using a hydro pump as the pressure sourc Unfortunately, the pump capacity allows the pressure to decay before the torque switch becomes 11unbypassed
and the results are inconclusive with respect to torque switch setting adequac A process pump can be used to sustain the dp and overcome this weaknes With either technique; diagnostic capabilities are available to assess the results and to.better determine both setting adequacy and setting margi *
(3)
Diagnostic testing can determine the valve thrust available at torque switch trip without any existing dp; however, previously used, standard calculations for thrust requirements are considered inadequate. If testing without dp is used to provide the only assurance of valve thrust capability, the burden is on the licensee to show the adequacy of the calculated requirement against which it is compare When the open torque switch is used, low voltage considerations require a torque switch setting upper limit to assure that the operator motor is capable of tripping the torque switch under reduced plant voltage conditions. This is provided in recent plants by an appropriately sized torque switch limiter plat (A negative aspect of this is that the thrust limit from the operator will still be thus.limited by the upper torque switch setting when nominal voltage is available.)
Site Specifics:
The open torque switch was bypassed for all bul let1n valves except for four in the HPSI system; hence, these four were the only ones of concern in properly setting this switc Differential pressure (dp) testing had already been completed, with some data collected, on one train of the HPSI valve Problems were encountered during the dp testing -
which included the failure of test equipment during one test and inadequate valve performance during another.
Due to plant conditions at the time of testing, the other train of HPSI valves were not tested against d Because of this and problems encountered with the HPSI train that was tested, it was not clear how the licensee would assure adequate torque switch settings with margin to allow for wear and degradation in the futur Hence, the setting of the open torque switch for the four HPSI valves of concern is an open item pending further licensee action and submittal of the final report required by the bulletin (255/87028-02(DRS)).
Close Torque Switch Discussion:
The close torque switch is normally used to stop motor rotation on the completion of valve travel in the close direction. Since it provides a normal control function and is exercised on every closure stroke, setting generally needs more careful consideration than for the open torque switc The limiting requirement for closure is at the end of travel when *
the thrust requirements are highest, the affect on flow control is most significant, and when the switch is almost never bypasse Hence, it is very important that the thrust at torque switch trip equal the most limiting closure thrust requirement and that margin be available to allow for valve and operator degradation between retests, refurbishment, etc.
-*
Differential pressure testing, using system process pumps, with appropriate data gathering and diagnostic evaluation is a positive means of assuring adequacy with margi Other approaches may be considered adequat One would be to periodically test against full dp without diagnostics. Another might be to do an opening dp test (using a hydro pump and diagnostics) and extrapolate that data to closing by adding two times the 11 stem area times system pressure 11 to determine a ballpark closing thrust requirement; then, use diagnostics to assure that the 11closure thrust at torque switch trip 11 matches that number with margi The upper end of stem thrust is limited by valve and operator desig It happens that the Limitorque operator can exceed its own rating if the design is not proper or if the torque switch is set too hig After the torque switch trips, the motor continues to run at full speed until the motor contactor opens, continuing to thrust load the stem beyond that required for valve operatio Then, inertial affects continue to add load until the motor is at rest. The final load must be less than that resulting in damage to the valve or operato If the design is improper, the final stem thrust load may exceed upper limits even if the torque switch is set for a thrust trip point below that required for proper operatio Normally, however, there should be an acceptable range within which both upper and lower thrust limits can b,e me Undervoltage considerations can have an important impact on the close torque switch setting. Since the torque switch must open to stop motor rotation in the close direction, any time low voltage is present such that enough torque cannot be developed to trip the torque switch, the motor will cook at locked rotor conditions. This will trip a thermal overload or cause motor winding burnou Hence, it is important that (1) the torque switch limiter plate be sized properly with consideration for low voltage qualification of the valve operator, (2) that the limiter plate remain installed and is not modified to allow higher switch settings, and (3) that the voltage at the valve (not the motor control center or main bus) be guaranteed at stall torque (or locked rotor) conditions to be equal to or greater than that for which the operator is qualifie Other factors in assuring an adequate torque switch setting are valve and valve operator mechanical condition Gate valve seat friction factors being determined lately appear to be anywhere from half to twice that assumed in the past using previously accepted formulas; filed measurements of stem thrust show that valve stem thread lubrication may impact thrust values by a factor or two; stem packing tightening has been shown to be a significant factor, actually causing motor burnout in more severe cases of overtightenin These concerns have to be
-*
addressed by maintenance, surveillance, and post maintenance test programs, not only to assure that the torque switch setting will correspond to an acceptable thrust, but to assure that all other operability factors are maintained as wel Site S~ecifics: All twenty-four bulletin valves close with the closeorque switch limiting torqu Similar concerns addressed in the discussion concerning open torque switch setting adequacy and testing apply to the close torque switch; however, the
.
licensee intends to perform more extensive dp testing with simultaneous data collection using MOVATS diagnostic equipmen This testing with data collection and evaluation should provide a much sounder base for assuring proper valve operation and should indicate the operating margin provided by the operator at the torque switch setting selecte The resolution of bulletin concerns with respect to the close torque switch will be considered an open item pending the completion of testing and test evaluation (255/87028-0J(DRSJ).
Undervoltage considerations for the bulletin valves have not been directly evaluated to assure that the valves will remain operable in the event Qf an undervoltage conditio However, an undervoltage analytical evaluation was performed on a LPSI injection valve which concluded that sufficient.voltage was available to ensure proper response of the individual load and proper response of the other combined loads (some bulletin valves included) on the Motor Control Center (MCC).
Since the LPCI valve.analyzed was a ulimiting caseu for motor and wire size, the inspectors viewed the conclusion that the bulletin valves would also be responsive in undervoltage conditions as appropriate.. The inspectors recommended that tbe licensee take voltage readings on a ~elected number of bulletin valves to
.
assure that the analysis done on the LPSI valve.was indeed valid for the other valves. This was done, and a review of the data indicated that the undervoltage concern had been adequately addressed by the license (4)
Open Limit Switch Discussion:
The open limit switch is normally taken from the No. 4 contacts on the Limitorque geared limit switch 11open
rotor. It provides the control function of determining the upper limit of valve stem travel in the open direction and stops motor rotation by opening the circuit to the associated motor contactor coil. The setting of this switch must assure an adequate valve stroke but, normally, must prevent backseatin Valve backseats are normally to provide a seal that is redundant to the valve packing in order to allow packing replacement without the need to drain down the process syste They are not normally used otherwise, and inadvertent or deliberate
backseating using the power of the motor-operated, or motor inertia, can and has caused valve stem shearing, stem thread twisting, and valve bonnet metal working until stem scoring and packing blowout occurre Hence, it is important to set the open limit switch away from the backseat and with enough margin to allow for motor contactor dropout time and inerti Independent verification (test, etc.) should follow any setting of the switch to assure it is done properl This is also the switch that some licensees adjust to meet Plant Technical Specification stroke time limits. While this practice should be discouraged, no problems are known to have been identified from this practic Site Specifics:
The Palisades bulletin valves 11 open on limit
using the open limit switch to stop the motor before the valve stem backseat MOVATS diagnostic testing was used to assure adequate limit switch settings which prevents backseating of valves. Also, the licensee had provided an adequate maintenance program (through procedures and training) that ensured additional stem travel would be available after electric operation. This was done manually using the handwhee It was also the philosophy of the licensee never to deliberately backseat the valve on motor operation. Since the valves were properly guarded against backseating there was no concern with respect to this switch settin (5)
Open Indication Discussion:
Open indication is usually identified by the presence of a light that goes out only when the valve is fully close Common practice has been to derive on/off contacts for this light from the Limitorque geared limit switch, 11close
roto In the past, this rotor was set to turn (or switch) very close to the end of valve closure. It is recognized now, however, that the open torque switch bypass (when used) often uses this same roto The setting of the point where the rotor turns has conflicting requirements for these two switche In setting for ideal position indication, there is not adequate bypass of the torque switch to assure valve operability; conversely, changes to satisfy the bypass requirements have resulted in false valve position indication. Hence, resetting of the 11close 11 rotor to address open torque switch bypass concerns must be accompanied by an evaluation of the affect on position indication and other switches on the same rotor as necessar Site Specifics: All of Palisades* valves used four rotor geared limit switches with the open indication moved from Rotor No. 2 to Rotor No. 4; therefore, eliminating the problems identified with having the open indication and the open torque switch bypass on the same rotor. All concerns with this switch setting have been adequately addressed by the license **
(6)
Open Torque Switch Bypass Discussion:
When an open torque switch is used, the bypass switch is required to bypass it during the initial portion of the open stroke so that the torque switch will not prematurely stop valve travel due to high torque conditions required for initial valve movemen There is no clear answer on where to set the bypass; but, if the valve operator (not the stem) has moved 20% of its total travel distance away from the seat when the bypass opens has been accepted as adequat Note on earlier discussion items that the open torque switch is not a necessary requiremen When it is used, however, it requires the bypass which has conflicted in use with the setting of the switch used for open valve indication. Hence, the use of any of these switches cannot be considered independently of the other Site Specifics:
The open torque switch bypass was being used only for four bulletin valves in the HPSI system, with all others having the open torque switch taken completely out of the open logic via a jumper. The four valves that did use the bypass were being set to open approximately 20%-25% of the total distance away from the seat and were being verified as adequate by MOVATS testing. These actions satisfy any concerns with regard to this switch settin (7) Close Limit Discussion:
The close limit switch is not often used on r1s1ng stem valve When it is, it is usually related to addressing a special valve problem or application and takes the place of the close torque switch in opening up the motor circuit at the end of valve closure. It may be used with or without a close torque switch in series with it for over torque protectio (the same switch in parallel with the torque switch would be ca 11 ed a close torque switch bypass.)
While special considerations (particularly setting precision and repeatability) are involved, there are no known problems occurring with this application to be concerned about. This is probably due to the special attention this type of application receives, the fact that it may be a more reliable design than with the torque switch, and because the valve population using this feature is smal Site Specifics:
None of the licensee 1s bulletin valves were wired to 11close on limit.
Motor rotation was being*stopped by actuation of the close torque switch in all cases.
(8) Close Indication Discussion:
Close indication is usually identified by the presence of a light that goes out only when the valve is fully ope Common practice has been to derive on/off contacts
- for this light from the Limitorque geared limit switch, 11open
rotor. This rotor turns 90 degrees at the end of the open stroke to turn out the close indication light, leaving the open indication light on to show a fully open conditio While concern exists for the point of setting for the open indication light, as indicated earlier, there has been no problem identified with the setting of the switc Site Specifics:
No anomalies or concerns for the setting of this switch were revealed by the inspection of the valve schematic diagrams or discussions with the licensee's staf (9) Close Torque Switch Bypass Discussion:
The close torque switch bypass acts in the Sqme manner as the open torque switch bypass; however, contrary to its counterpart's function, it normally bypasses the torque switch during the lightest duty portion of the strok In fact, it is not normally required at all to get the valve stroke started unless, perhaps, the valve has been backseated prior
to the close strok Some designs do not incorporate a close torque switch bypass while others use up to a 95% to 98% bypass to eliminate uncertainties with the close torque switch for as much of the valve stroke as reasonable possibl There appears to be merit to the extended bypass, especially if surveillance testing, maintenance, etc., is less than fully adequate in assuring torque switch setting accurac Site Specifics:
The licensee used a close torque switch bypass which opened early in valve travel. Since the valves were properly guarded against backseating there was no concern with respect to this switch settin Maintenance of Correct Switch Settings Action item d of the bulletin required procedures that would ensure the adequacy of correct switch settings throughout plant life. This would involve all programmatic activities that assure long term valve operability because degradation of either the valve or operator affect the adequacy of the torque switch settings. This adequacy assurance has to be continued after certain maintenance activities (such as packing adjustments) are made with surveillances properly considering all switch setting The licensee indicated during the inspection that their long-term operability program had not yet been fully established; however, Palisades did have good detailed maintenance procedures concerning the refurbishment/repair of Limitorque MOVs that were revised and rewritten by Babcock & Wilcox to ensure that switch settings were properly set and maintaine !
'
Consumers Power had been actively involved in providing training for its employees with regard to the electrical and mechanical refurbishment/set-up of the Limitorque motor operators. Actual refurbishment/set-up was being performed by Babcock & Wilcox engineers and field technicians with Palisades' employees assisting with the wor According to the licensee's bulletin response, it was their intent to continue with contracted experts (e.g., B&W, MOVATS) in future testing of the operator The inspector commented that it could be to the licensee's benefit if their own employees were more closely involved in these activitie The licensee had committed to address thei~ plans for a long-term operability program in the final written report to be submitted on test program completio Inspection and resolution of this item is pending further evaluation and action by the licensee and is considered an open item (255/87028-04(DRS)). Open Items Open items are matters whic~ have been discussed with the licensee, which will be reviewed further by the inspector, and which involve some action on the part of the NRC or licensee or bot Open items disclosed during the inspection are discussed in Paragraphs 2a, 2b(2), 2b(3), and 2.
Exit Interview The inspectors met with the licensee representatives (denoted in Para~raph 1) on October 30, 1987, to discuss the scope and findings of the inspectio The licensee acknowledged th~ statements made by the inspectors with respect to items discussed in the repor The inspector also discussed the likely informational content of the inspection report with regard to documents or processes reviewed by the inspectors quring the inspectio The licensee did not identify any such documents/processes as propriety.
- -..I NI'~ Fl)llM 11111 r
111~~*
IE MC 0!.35 ORS U.S. N.UCLEAR ~EGULATOR'I COMMISSION INSPECTOR'S REPORT Office of Inspection and Enforcement t/C/!-
I WOJ./Lt>
PRINCIPAL INSPECTOR (Nam.. 18*1. flt*I. *1111 fllldalfl inill.ll}
/,UO JI£...{> I PETE!?-
,e..
REVIEWER P/.lll..LIPS,, /v/0"171!5 LICENSEE/VENDOR TRANSACTION TYPE DOCKET NO. CB digi11l OR LICENSE NO. CBY PRODUCT! 113 digi11l REPORT NEXT INSPEC. DA. TE N SE M Y x I
-
INSERT
-
M -
MODIFY osooozss ll
-
D -
DELETE c
-
R -
REPLACE D
PERIOD OF INVESTIGATION/INSPECTION INSPECTION PERFORMED BY ORGANIZATION CODE OF REGION/HO CONDUCT-r---~~----r--""'"'.~---T--r--------------.-.----------------l ING ACTIVITY (SEe /EMC 0530 "Manpower Report-*
1----FR_o_M-r---+--r-T_o_r---+..:.X...:..i 1 -
REGIONAL OFFICE STA.FF LJ OTHER ing-WeeklyMsnpawnrR~porting "forcod PERFORMANCE APPRAISAL TEAM M DAY Y MO. I DAY Y RESIDENT INSPECTOR
REGION
DIVISION BRA.NCH l-'"T"--lf--r--+--r-+-....--+--r--lf--r--+---1
I I o 2. "' B 17 tlo l3lo Bl7 11:-~..... --.;.L..~~i..:-..... ~~~~~-:-l
..... it-~"":""'.~'."."':'~.,...,.,.,,.~':'"':'~!'"l'":,.,...,...,.,,.,.~..... ~
.....,,.,.,,,..,,.,,~.....,.,,..,,,.,,.,,...,,.,,,..,,.,..,,,............,....,,,.,................ ~_..,~.~-~--+-------t
~*-':*:* -.--,'.*:..;_,_.. _:*~' 26:*~::* :=.-:*;::::r:i1 *- *.. ~ * *~:.. :;~.. :-?*'*.-:_-,--... _.-.~;~.. ~-:'r0\\i2 ;~*-->*:*'.*.:***._
.... -~'.' --- -
~
~.::. 33
,.................................................................................................................... -.;.-.......-:;......;....;...-.------------------""'"--................ ~----------r-.---------4 REGIONAL ACTION CCheck one box only! -
)<
02 _ SAFETY
........... ----------------t--t IBi 1 -
_
03 -
INCIDENT x
2 -
REGIONAL OFFICE LmER 04 -
ENFORCEMENT I ISPECTl~~::~~~~~;,i~~ FINDINGS B
1 -
CLEAR 2 -
VIOLATION
......
05 -
MGMT. AUDIT TOTAL NUMBER OF VIOLATIONS AND DEVIATIONS TYPE OF ACTIVITY CONDUCTED !Check one box only!
-
-
06 -
MGMT. VISIT 07 -
SPECIAL OB -VENDOR 09 -
MAT.ACC ENFORCEMENT CONFERENCE HELD
-
10 -
PLANT SEC.
11 -
INVENT. VE LJ 14 -
INQUIRY LJ 15 -
INVESTIGATION
-
12 -
SHIPMENT/EXPORT 13-IMPORT REPORT CONT A.IN 2.790 INFORMATION LmER OR REPORT TRANSMITTAL DATE NRC FORM591 OR RE LmERISSUED REPORT SENT TOHO. FOR ACTION
-
3 -
DEVIATION A I 8 c I 0 A I B I c D B c I D I M DAY Y M DAY I Y VIOLATION&DEV!A.TION El 1VI I
I I I
I I 1-YES I I 1 -
YES l I~ I... 1;-1 ',
I I
U E*1
TION C*
m UL u
MODULE REQ. FOLLOW P REC-ORD w
"' a::
c !!!
- > z "'
"' :r
- !!
u
...
a::
- >
a::
c w
w
"'
u
- I!
~ ::> z B
c D
I I
I I
I I
I I
I I
I I
I I
I I
"'
a::
- >
a::
c...
"' "'
u
- I!
~ ::>
G.. z I I I I I I I I I I I I I I I TI. Z.515 /73 B
I I
I I
I I I I I a:
w
-'
m
~ ~ ~
-'
z
~ I I
- i:ES es - 0 3 ( MoV-s j c I
I I
I I I I I I 1-+-+-........... _........_.... _..... +--f-~'--........... _...._.._-t I I I I I D
I I
I I
I I
I I
I I I I I I
I I I I I B
I I
I I I I I
-. **
c I
I D
I I
I I
I I
I I
I I I I I B !
I I
I I
I I I I I B I B
I I
I I
I I I I I c
I I I
I I I I I I
- CIRCLE SEQUENCE IF VIOLATION OR DEVIATION
~
I I
I I
I I I I I MODULE NUMBER INS I I I I I I I I I I I I I I I I I I I I
..;., __,..,, _-.
.:.. - ~
~**:;._* *-
>
>
I I
MODULE INFORMATION
. I I
I I
i I
I I
c I
I I
I D
I I
I I
I I
I I
B I
I I
I c
I I
I 1,.,-
D I
I f,
I I
IA I
I I
I
I I
I I
c I
I I
I D
I I I I
I I
B I
I I
I c
I I
I I
D I
I I
I-55
'lllODULE REO. FOLLOWUP w
a:
- >
a::
c
...
... "'
u
- I!
~ ::>
G.. z I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I
I I I I I I I I I I I I I I I
I I I I I
I I I I I I I I I I I I I I I I I I I I I I
-'
w
~
-'
.. Enclosure C 1.NSt.ECTION PLAN FACILITY:
PALt5ADes SCH£DULID DATC(s):
10/zc, - :so/87
~~~.
~~-+-1
---~~~~~~~~~~~~~~~~---
P. llJOl-ILD
. 5, EleJC-.
uvL>UL[ N " COMP
~SPECTION FOCUS
~SIGNED TO TI. 2515/73 IE' Bllu..eTitJ. ss-03 I * ~on>e. - OP12-ATeD D,e..5
.
VAL.VG°"
COMl-l.OtJ,.,,_ot>E, F"AILA.lf<!.es Du£1/\\l'"f
.
/'LAI-IT T!2A#.IS"le>ff5 i>Uc?O
/1-tP~~e<...
.. FOcus Si>JITC/-1 S"lt'TT7Al<!j t:J,N
{)..llTAJEi.SSllJ6J MoVATS TE.ST/A.J<!j I
/AJS"l'e c77o#S
µe..J'
&'lA7'°EV 7D j.Cl..OS
- r:.EB. 8S'-o3;r /JJ Tl-H:: FUTVl!- ~2.70 I Fol-W(,L)-" *op ON p,.eev1oe1~ <--Y D£S
-*-
/0Ei"NT//:!IG"0 ITC!M,12.EVIG"tu oF
/?.e&tOVS p,es /lo/Sf'C(?o.N ;z.£PoR-TS To
,tl.lt 7ti/Z.J.1 IN 511-fll-AR-t77:H5
.
/<>fl. C!-Losutff!...
~----
>--------
-
-
---
r; PLAN PREPARED BY: __
s._.u_. e;_,_c:._il-_________ DATE: ___
l'f'-_. _*-_1°,_/zu
___ J e
...... 7 __
_
PLAN APPROVED BY: ~
Dl.TE: ___
/,,:1)~~~b
........
l5'..,....v %7 ___
_
PLAN REVIEWED BY: ~<....: ~---- DATE:_...../4~,h
........ ::...iCJ,d'-"........ -Z ___ _
l'SF k'>JTION.t SH!ITS AS N:CtSS*f
...
I r-
- ~
RP 05168
~*
- SALP FUNCTIONAL AREA ASSESSMENT AND PRELIMINARY INSPECTOR EVALUATION FORM
/'
-'
Facd 1'1ty:
PAt..t5ADe5 F.UNCTIONAL AREAS PLANT OPERATIONS RADIOLOGICAL CONTROLS MAINTENANCE SURVEILLANCE FIRE PROTECTION EMERGENCY PREPAREDNESS SECURITY Inspection Report No.:....,......._B_7_-_oo...;.......Z8-=-----
./
I II III IV v
Dev Unit Rat1n I
/JA I
I
/JA I
j
~
/JA IJA NA NA I_
I I
Pl El RI Al Tl I I
NI SI I
NA
-
I OUTAGES
~-..-..-..-....,..,..,..---......,.......-..-..-..-..-L---'--..-L--..~---..-1..--..-J..----L-..-..L----J'---..-1 *
tJA I QUALITY PROGRAMS & ADMI *
_.,....,~~~~==-='~=-=..i.:....-=--'-'------~~....,.........__....,........__....,............._....,......._._~---..!--~~~I *
J
~ I CONTROLS AFFECTING QUALITY LICENSING ACTIVITIES
"
--=~-..----...,..,..,...,.-==~~,.,..,---..-----.L-~-...._____,..__ __
......____,.-L---L---..L---J'--~1 *
NA TRAINING & QUALIFICATION
-=~~:..:..;:;~.,::,...,.,,~....,...........,...........,...........,...........,....... __..___.____,._.__....,.......1--....,.......-1..-....,.......-L---L----L-----~I~
EFFECTIVENESS SOILS AND FOUNDATIONS CONTAINMENT, SAFETY-RELATED STRUCTURES & MAJOR STEEL SUPPORTS PIPING SYSTEMS & SUPPORTS I
Cl
NI SI I
Tl I SAFETY-RELATED COMPONENTS RI I MECHANICAL UI I AUXILIARY SYSTEMS Cl I
Tl
!ELECTRICAL EQUIPMENT AND CABLES II I
I INSTRUMENTATION NI 1---..-------..-------------------------'-~----L---~---.J.---L---'----~---~---~--I
- Functional areas for Construction and Operations CRITERIA FOR DETERMINING CATEGORY RATING Management Involvement in Assuring Qualit.
Approach to Resolution of Technical Issues from a Safety Standpoin.
Responsiveness to NRC Initiative.
Enforcement Histor.
Operational and Construction Event.
Staffing (including management).
RATING KEY:
(For Categories 2 - Declining and 3, provide narrative basis for conclusion)
Category 1 Category 2 - Declining Category 2 Category 3
...
I Inspector(s) concerns adequately addressed or I
- ... *1=1 Inspection ~aluation_ Form being processe /']
Lead Inspect j), [,,.Ck-Section Chief~
- ze/17 (S"gnature)
(Date)
(Signature) (Date)
March 3, 1986
- -* D MODIFY ITEM N TYPE DKT YYXXX H rODE-ftmeltltlt 6:t FOLLOWUP ISSUE DATE ITI 11 IJ li.YYMMDD RESPONSE DUE DATE DUE DATE Lii I I I I
~y Y H HD D PERSON ASSIGNED
--
_, -
v
...
j
-
BULLETIN CLOSEOUT DATE rn HI Fl 1/.i1 Y Y M M D D 11(1111 (.,Y Y HK DD
~
p Is I 1H+ I I I I I I I I I
°'-
BRIEF DESCRIPTION I
I
'1
'
I
- "
s~-~1_.. "'!\\
T R A C K l N G I
S Y S I E M STATUS 81',
CLOSEOUT REPORT I
~
v..,
pi
'&;:;
INTERIM RPT. I l>>
B..i
'1jt:
INPUT BULLETINS CIICULAIS LICENSE DSG. I
[1111111 OJ Ya..
I I I I I I I I I I 1 9(....
INSPECTOR 1 I I *I I I I I I I I 1t/1o I SUBMITTED BY:
SoJ..J.1A Ef'--¥-C/I~
I I I
.. '
I I J I t
- TYPE COOE -
B c
Rev. 4/85
REGION
rn NEW ENTRY D MODIFY ITEK NO *.
TYPE CODE PERSON WHO IDENTIFIED* ITEM 1jf ~~l~f~1i1:H, If I I
I.ER LEll EVENT DATE REPORT DATE I ~( J I J ~J
.,J I I I I I I a
i..t Y MMD D LER REPO TYPE
~
3 -
T"R AC LER REVISION D
- 1.. s IESPONSE DUE DATE PERSON ASSIGNED G
SYSTEM FOLLOWUP DUE DATE STATUS
\\'AW3E ~ LICENSE DSG. I 11111111111
'la'\\
CI..OSEOUT REPORT N INPUT TYPE CODE AEO'S
- A DEVIATIONS.SS(E)
E 10 era 20 F
ALLEGATI~N G
IAL
ORDERS TO LICENSEE l
LER, L
CONFlllHATOIY ACTION LTl H OPEN ITEK
p PART 21 SIGNIFICANT SAFETY FIN µNRESOLVED ITEM WITHDRAWN s
u w IJLE NO,;
I 2.fs-ls 1 1 f31 l I 11 I I I
~y t lfR~b b (olplsl/IIlsl**l 11 1111 I I VIOLATION - SEV. LEVEL 1, 2, 3,:
4, s
'li1 * BRIEF DESCRIPTION C:..LAfi!.1 F !CATI 0 Cl F (J.s o F INTERIM REPORT *N ;\\.
INSPECTO,~
I I I I I I I I I I I I I J~I J
,.~
2.Aa "'-'---"*
B A s F' 0 ~ H I.) L A T e-D F P,.o,.., - r µ.
l:'" ' ~" /J T e-s Ti N Gt *
w I L-1.-
C: L A R.. I F 'I 1N F I ""
~ 'L
~E p 0
~ T
~ I..).B
""'
IT T E i)
T 0 N
,~ e.
( 'I" S"" B
~ t;r 5" -
0 3 )
'"
1111111111111111 J::
S/""9
..,
..,
INTERIM REPORT NO~
INSPIC'l'Oll
-..
INTERIM REPORT NO.*
INSPECTOR pl I I I I I I I I I I I I I I 0
/~
~
t4/1o *
'
SUBMITTED BY:
Rev, 4/85
EJ.
NEW ENTR D ~DIFY ITEK N TYPE CODE PERSON WHO IDENTIFIED*ITEM
- ,.T~
- I~ f ! 1=1i=i +If I LEI EVENT DATE I ~( 11 J JJ
~ r it LU REPORT DATE
.,J I I I I I I
~YYKKDD US PON SI LER llEPOJlT TYPE Q
3 -
T.R AC LER REVISION D
'I JLE N DUE DATE PERSON ASSIGNED G
SYSTEM FOLLOWUP DUE DATE
-
STATUS l"~*fil[B Y...
s LICENSE DSG. t 111II[11111
'la'4 CLOSEOUT REPORT N INPUT TYPE COD AEO'S
"A DEVIATIONS D*
50.55(E)
E 10 CFR 20 F
ALLEGATION G
IA I ORDERS TQ LICENSEE K
LER *.
L CONFUHATOIY ACTION LTl H OPEN ITEM O
PART 21 P
SIGNIFICANT SAFETY FIN S
µNRESOLVED ITEM U
WITHDRAWN W
J,1,IJJJJ zfslsf7f3f VIOLATION - SEV. LEVEL 1, 2, 3, ;
4, 5 (0 lrlsl/l~lslTI 11 I I I I I I e:tBflllH BRIEF DESCRIPTION NO 16.ST 0 p
' f"*
e /J
I I,
T o~ q I! ~
5 I IA I
'la...
TC H s -e 'T T IN C1 ( I E' B
'
SUBMITTED BY:
.5 0/-J I A; El c.¥---
INSPECTOR INTERIM REPORT *N1 ~
,~
I I I I I I I I I I I I I J*,.J J '"k 2ACI ~*~-.
8 ~ -
0 3 I
INTERIM REPORT NO~
IHSPICTOI
,.
1111111111111111 2N
!,4ts S/'°'9 11 I II 111111111 H. 11111 l I
INTUIM REPORT NO *.
IHSPEC'l'O "'
lllfllllllll I I I l
~*t
,./1o E1 NEW ENTR D ~DlFY
REGION
3 -
T"R A C G
SYSTEM INPUT TYPE CODE PERSON WHO IDENTIFIED*ITEM
.FOLLOWUP DUE DATE STATUS AEO'S DEVIATIONS 50.55(E)
- A E F
G l
~
L H
p ITEM NO, TYPE CODE if~!l:f 1~1=1-iot1f 1
\\~Amw ~
s 10 era 20 ALLEGATION IAL 11JLI N. zfsfsl1)3]
LU REPORT DATE 1111111
"YYKKDD llESPONSE DUE DATE J;l,IJRI DI J BRIEF DESCRIPTION tJ 0 LER REPO TYPE Q
LER REVISION D
- 1-a PERSON ASSIGNED LICENSE DSG. II I I I 1 I I I I I IJ
'laq CLOSEOUT REPORT N (olplsl/l:clslTI 111JJ1 I I
'"*'-.
Tes-,
0ATA AVAIC.ABLe INTERIM REPORT*N,.-t-------
Qlt-f--t-+.... -1
'-k OF T/.tti LIHtlOfZ-Q..us c.c,ose ro
~ue W/TC/-1 Sc
.,...
INTEllIK llEPORT NO~
'"
2..i
!,4ts
.,.,
INTUIM REPORT NO.* ~
'*
.
SUBMITTED BY:
.SON IA Et~
ORDERS TQ LICEHSEE LER :.
CONFIBMATOIY ACTION LT OPEN ITEK PART 21 SIGNIFICANT SAFETY FIN µNRESOLVED ITEM WITHDRAWN VIOLATION - SEV. LEVEL INSPECTOll I I I I I I I I I I I I I l*-1 J 2Aa ~~-
INSPICTO 'I/IQ(.
- ..
INSPECTOR I I I 1* I I I I I I I I I I I 1 s
u w 1, 2, J,:
4, s Rev, 4/85
- 1
R E G I 0 N B
MEW ENTR HOD I FY ITEM N TYPE CODE PERSON WHO IDENTIFIED* ITEM f r~:p f
~l~l1=i
i
1:f 0l I.Ell EVENT DATE I 1;t 1 I J
~J
- a r I!.
LEll REPORT DATE
' 1111 11
"y Y MMD b USPONSE LER llEPOllT TYPE g 3* -
T.R AC LER REVISION D
- 1,.a
~LE N DUE DATE PERSON ASSIGNED Zf sfsb)3 I J;l,IHI RI>>' J BRIEF DESCRIPTION Lo N VA '- V e Of'~IZA81l-I l r c. E Al s ;; 1£ (:r FB s-S" -
() 3) -
~,...
.
~
- -~ *
'
r*
SUBMITTED BY:
G SYSTEM FOLLOWUP DUE DATE STATUS
,,~.~ ~
s LICENSE DSG. *I 111)1[11111
'la..
CLOSEOUT REl?ORT N INPUT TYPE CODE AEO'S
- A DEVIATIONS.55(E)
E 10 CFll 20 F
ALLEGATI'lN *
G IAL l
ORDERS TQ LICEHSEE K
LER; L
CONFUMATOIY ACTION LT H OPEN ITEK
PART 21 P
SIGNIFICANT SAFETY FIN S
µNRESOLVED ITEK U
WITHDRAWN W
,
e:FE-1111 H VIOLATION - SEV. LEVEL l 1 2, 3, :
4, s g y
' I+ e
,~
I I I I I I I I I I I I I l~I)
&
~k 2Aa ~...
INTERIM REPORT *NO. *
- \\
.
INSPECTOR INTERIM llEPORT ~O~
IHSPIC'l'OI
,.
I I I I I I I 111111111 2n S/llC<.
!Jtts
- ..
INTERIM REPORT NO *.
INSPECTOR I I I f I I I I I I I I I I I 1 lt:
~/1o Re /85