IR 05000250/1988039

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-250/88-39 & 50-251/88-39
ML17347B042
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/20/1989
From: Wilson B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Conway W
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8904030086
Download: ML17347B042 (2)


Text

gC CELEBRATED DISTRIBU'EON DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8904030086 DOC.DATE: 89/03/20 NOTARIZED: NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C TH.NAME AUTHOR AFFILIATION LSON,B.A.

Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION CONWAYiW.F.

Florida Power

& Light Co.

SUBJECT:

Ack receipt of 890303 ltr re steps taken to correct vioaltions noted in Insp Repts 50-250/88-39 6 50-251/88-39.

DISTRIBUT10N CODE:

IE01D COPIES RECEIVED:LTR ~ ENCL +

SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

DOCKET 05000250 05000251 RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: AEOD DEDRO NRR/DEST DIR NRR/DLPQ/QAB 10 NRR/DREP/EPB

NRR/DRIS DIR 9A NUDOCS-ABSTRACT OGC/HDS2 RGN2 FILE Ol RNAL: LPDR NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME EDISONgG AEOD/DEIIB NRR SHANKMAN,S NRR/DLPQ/PEB

NRR/DOEA DIR 11 NRR/DREP/RPB

NRR/PMAS/ILRB12-BBE N, J REG LE

NRC PDR COPIES LTTR ENCL

1

1

1

1 NCTE 'IO ALL "RIDS" RECIPIENIS:

PIZASE HELP US IO REDUCE HASTE CGNZACT THE DOCUMEÃ7 CXÃI$QL DESKS ROC'l-37 (EXT. 20079) m ELQGMAXB RX1R NME FBI DIPT1GBVZIGN LISTS FOR DOCUMENIS YOU DCH'T NEED1 TOTAL NUMBER OF COPIES REQUIRED:

LTTR

ENCL

MAR 2 0 ]98g Florida Power 5 Light Company ATTN:

Mr. W.

F.

Conway Senior Vice President

- Nuclear P. 0.

Box 14000 Juno Beach, FL 33408-0420 Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NOS. 50-250/88-39 AND 50-251/88-39 Thank you for your response of March 3, 1989, to our Notice of Violation i'ssued on January 24, 1989, concerning activities conducted at your Turkey Point facility.

We have evaluated your response and found that it meets the requirements of

CFR 2.201.

We will examine the implementation of your corrective actions during future inspections.

We appreciate your cooperation in this matter.

Sincerely, cc:

J.

S.

Odom, Vice President Turkey Point Nuclear Plant J.

E. Cross, Plant Manager Turkey Point Nuclear Plant L.

W. Bladow, Plant QA Superintendent R. Hart, Regulatory and Compliance Supervisor State of Florida Original Boned Q BRUCE A. V/iL"-ON Br uce A. Wilson, Chi ef Peactor Projects Branch

Division of Reactor Projects bcc:

G.

E. Edison, Project Manager, Project Directorate II-2, Division of Reactor Projects, NRR NRC Resident Inspector DRS Technical Assistant Document Control Room 8904030086 890320 PDR ADOCK 05000250

PNU Rl I WPoertner:saj 03/,

/89 RC lenjak 03/g/89 m~o f