Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-250/88-28 & 50-251/88-28
ML17347B044
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/16/1989
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Conway W
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8904030116
Download: ML17347B044 (2)


Text

gc CpLEMTED DISTR1BUTI ON DEMO.iSTRATION SYFI EM REGULATORY ZNFORMATION DISTRIBUTZON SYSTEM (RIDS)

ACCESSION NBR:8904030116 DOC.DATE: 89/03/16 NOTARIZED: NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C TH.NAME AUTHOR AFFILIATION LIANiC.A.

Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION CONWAY,W.F.

Florida Power a Light Co.

SUBJECT:

Ack receipt of 881221 ltr re steps taken to correct violations noted in Insp Repts 50-250/88-28

& 50-251/88-28.

DISTRIBUTION CODE:

IE01D COPIES RECEIVED:LTR L ENCL Z)

SIZE:

/

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

DOCKET g 05000250 05000251 RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: AEOD DEDRO NRR/DEST DIR NRR/DLPQ/QAB 10 NRR/DREP/EPB

NRR/DRIS DIR 9A NUDOCS-ABSTRACT OGC/HDS2 RGN2 FILE

RNAL: LPDR NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME EDISONiG AEOD/DEIIB NRR SHANKMAN,S NRR/DLPQ/PEB 11 NRR/DOEA DIR 11 NRR/DREP/RPB

NRR/PMAS/ILRB12

IEBERMAN,J EG FILE

NRC PDR COPIES LTTR ENCL

1

1

1

1

~ TO ALL itRIDS" RECIP~'IEASE HELP US K) REDUCE RESTE!

CGNZACT THE DOCGMEÃZ CGNZ'ROL DESK, ROOM Pl-37 (EXT. 20079)

TO ELIKQQXB YOUR NME HKH DISTEGBUTXQN LISTS FOR DOCUMEÃIS YOU DON'T NEED)

TOTAL NUMBER OF COPIES REQUIRED:

LTTR

ENCL

MAR i6 Qg Florida Power and Light Company ATTN:

Mr.

W.

F.

Conway Senior Vice President - Nuclear P. 0.

Box 14000 Juno Beach, FL 33408-0420 Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NOS. 50-250/88-28 AND 50-251/88-28 Thank you for your response of December 21, 1988, to our Notice of Violation issued on November 23, 1988, concerning activities conducted at your Turkey Point facility.

We have evaluated your response and found that it meets the requirements of

CFR 2.201.

We will examine the implementat'ion of your corrective actions during future inspections.

We appreciate your cooperation in this matter.

Sincerely, Vela~

Caudle A. Julian, Chief Engineering Branch Division of Reactor Safety cc:

J.

S.

Odom, Vice President Turkey Point Nuclear Plant J.

E. Cross, Plant Manager Turkey Point Nuclear Plant L.

W. Bladow, Plant gA Superintendent J. Arias, Jr., Regulatory and Compliance Supervisor State of Florida bcc..

G.

E. Edison, Project Manager, Project Directorate II-2, Division of Reactor Projects, NRR NRC Resident Inspector DRS Technical Assistant Document Control Desk W

einsorge:gb

/g/89 rion

/)g /89 ake 0 /(>/89 RC le jak 03// /89 gpp4030iib B~o~~~~i pgp ADOCN 0 NU 6