IR 05000250/1988034
| ML17347A964 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 02/06/1989 |
| From: | Peebles T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Conway W FLORIDA POWER & LIGHT CO. |
| References | |
| NUDOCS 8902150246 | |
| Download: ML17347A964 (2) | |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
CESSION NBR:8902150246 DOC.DATE: 89/02/06 NOTARIZED:
NO DOCKET g
FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION PEEBLES,T.A.
Region 2, Ofc of the Director RECIP.NAME RECXPIENT AFFILIATXON CONWAY,W.F.
Florida Power
& Light Co.
R SUBJECT:
Ack receipt of 890117 ltr responding to notice of violation noted in Insp Repts 50-250/88-34
& 50-251/88-34.
DISTRIBUTION CODE:
IE01D COPIES RECEIVED:LTR (
ENCL U SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of VioTation Response NOTES INTERNAL:
EXTERNAL:
RECIPIENT ID CODE/NAME PD2-2 PD AEOD DEDRO NRR/DEST DIR NRR/DLPQ/QAB 10 NRR/DREP/EPB
NRR/DRIS DIR 9A NUDOCS-ABSTRACT OGC/HDS2 RGN2 FILE
LPDR NSIC COPIES LTTR ENCL
1
1
1
1
RECIPIENT ID CODE/NAME EDISON,G AEOD/DEIIB NRR SHANKMAN,S NRR/DLPQ/PEB 11 NRR/DOEA DIR 11 NRR/DREP/RPB
NRR/XMAS/ILRB1 2 OE RMAN,J
~ZKZ
NRC PDR COPIES LTTR E
1
1
2
I I
CL D
NAZE M ALL "RICG" RECIPIENIS:
P~~E HELP US TO REDUCE~!
CChZACZ 'IHE DXXJMZiZ CO!~L DESK, ROOM Pl-37 (EYE. 20079)
'IO ELI!CCK~ KXJR KQK PRON DISTRIBVZIQN LISTS POR DOCUMENIS YOU DON'T NEED!
')
TOTAL NUMBER OF COPXES REQUIRED:
LTTR
ENCL ~3
February 6,
1989 Docket Nos. 50-250, 50-251 License Nos.
DPR-31, DPR-41 Florida Power and Light Company ATTN:
Mr.
W. F.
Conway Senior Vice President - Nuclear P. 0.
Box 14000 Juno Beach';
FL 33408-0420 Gentlemen:
SUBJECT'RC INSPECTION REPORT NOS. 50-250/88-34 AND 50-251/88-34 Thank you for your response of January 17, 1989, to our Notice of Violation issued on December 15, 1989, concerning activities conducted at your Turkey Point facility.
We have evaluated your response and found that it meets the requirements of 10 CFR 2.201.
We will examine the implementation of your corrective actions during future inspections.
We appreciate your cooperation in this matter.
cc:
J.
S.
Odom, Vice President Turkey Point Nuclear Plant J.
E. Cross, Plant Manager Turkey Point Nuclear Plant L.
W. Bladow, Plant QA Superintendent J. Arias, Jr., Regulatory and Compliance Supervisor State of Florida Thomas A. Peebles, Chief Operations Branch Division of Reactor Safety bcc:
G.
E. Edison, Project Manager, Project Directorate II-2, Division of Reactor Projects, NRR NRC Resident Inspector DRS Technical Assistant Document Control Desk
.'jl lpga~ lj RI I),'y]
RI I/Kl
~
/]1)
RGihbs:svh ABelisle FJape 01/" 9/89 Ol/)i /89 01/ $+89 J
)
)
RCrl enjak
/89 RI I
-.. TPeebl es (g/ii/89 i/o