IR 05000250/1988020
| ML17347A871 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 10/12/1988 |
| From: | Cline W NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Conway W Florida Power & Light Co |
| References | |
| NUDOCS 8810250493 | |
| Download: ML17347A871 (3) | |
Text
~cczdmrga>>&Rr8kRVZN5.i~ÃP48&~.i@'~~~
I'(
ACCESSiON NBR:8810250493 DOC.DATE: 88/10/12 NOTARIZED:
NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C
05000251
~
~
AUTH. NAME AUTHOR AFFILIATION LINEiW.E.
Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION CONWAY,W.F.
Florida Power a light Co.
SUBJECT:
Ack receipt of 881003 ltr informing NRC of steps taken to correct violations noted in Znsp Repts 50-250/88-20.
DISTRIBUTION CODE:
ZE04D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Safeguards Inspection Rpt/NOV Response (50 DKT)-Publicly Available NOTES:
RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G COPIES LTTR ENCL
0
1 RECIPIENT ZD CODE/NAME PD2-2 PD COPIES LTTR ENCL
1 INTERNAL: AEOD/DOA NRR/DRIS/SIB 9A NUDOCS-ABSTRACT RGN2 FILE
1
NRR/DRZS/SGB 9D
1 NRR PMAS/ILRB12
1 ~
1
1
1
1
EXTERNAL: LPDR Nslc
1
1 NRC PDR
1 TOTAL NUMBER OF COPIES REQUIRED:
LTTR
ENCL
Docket Nos.
50-250, 50-251 License Nos.
~ r. ~988 Florida Power and Light Company ATTN:
Mr.
W.
F.
Conway Senior Vice President
- Nuclear P. 0.
Box 14000 Juno Beach, FL 33408-0420 Gentlemen:
SUBJECT:
REPORT NOS. 50-250/88-20 AND 50-251/88-20 Thank you for your response of October 3,
1988, to our Notice of Violation issued on September 1,
1988, concerning activities conducted at your Turkey Point facility.
We have evaluated your response and found that it meets the requirements of
CFR 2.201.
We will examine the implementation of your corrective actions during future inspections.
We appreciate your cooperation in this matter.
Sincerely, William E. Cline, Chief Nuclear Materials Safety aad Safeguards Branch Division of Radiation Safety and Safeguards cc:
J.
S.
Odom, Vice President Turkey Point Nuclear Plant J.
E. Cross, Plant Manager Turkey Point Nuclear Plant L.
W. Bladow, Plant gA Superintendent J. Arias, Jr.,
Regulatory and Compliance Supervisor State of Florida bcc'.
NRR/DRIS/SB B. Murray, RIV Document Control Desk (RIDS IE04),
016 NRC Resident Inspector State of Florida G.
E. Edison, Project Manager, Project Directorate II-2, Division of Reactor Projects, NRR DRS Technical Assi stant RIh
~~
RI RI pi/'illman:tj
> re RC lenjak 10/P /88 10/it/88 10/PP/8 88i0250493 88iOi2 PDR ADQCK 05000250 G
PNU
~Go/
l/(
./
~
p,