IR 05000250/1988025

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-250/88-25 & 50-251/88-25
ML17345A535
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/09/1988
From: Decker T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Conway W
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8811220186
Download: ML17345A535 (2)


Text

3)',)WRlBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8811220186 DOC.DATE: 88/11/09 NOTARIZED: NO DOCKET I FACI~:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250

~

~

~

~

50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION ECKER,T.R.

Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION CONWAYiW.F.

Florida Power

& Light Co.

SUBJECT:

Ack receipt of 881026 ltr informing NRC of steps taken to correct violations noted in Insp Repts 50-250/88-25.

DISTRIBUTION CODE:

IE01D COPIES RECEIVED:LTR I

ENCL M SIZE:

/

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: AEOD NRR MORISSEAUgD NRR/DLPQ/QAB 10 NRR/DREP/EPB

NRR/DRIS DIR 9A NUDOCS-ABSTRACT OGC/HDS2 RGN2 FILE

ERNAL: LPDR NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME EDISON,G DEDRO NRR/DLPQ/PEB

NRR/DOEA DIR 11 NRR/DREP/RPB

NRR/PMAS/ILRB12 OE LIEBERMANgJ

E'TSK~

NRC PDR RESL MARTIN,D COPIES LTTR ENCL NOZE K) ALL 'KIDS" RECIPERIS:

PIZ~E HELP US TO REDUCE %ASTB!

COPE~ ~ DOCUMEPZ CXKZROL DESK, RXN Pl-37 (EXT. 20079) I HIaIKQQZE YOUR MME PKM DIPI%GHOTIQN LISTS KR DOCUMENTS YOU DON'T NEEDf TOTAL NUMBER OF COPIES REQUIRED:. LTTR

ENCL

~ Florida Power and Light Company ATTN:

Mr. W. F.

Conway Senior Vice President

- Nuclear P. 0.

Box 14000 Juno Beach, FL 33408-0420 NOV 09 l988 Gentlemen:

'SUBJECT:

REPORT. NOS. 50-250/88-25 AND 50-251/88-25 Thank you for your response of October 26, 1988, to our Notice of Violation, issued on September 27, 1988, concerning activities conducted at your Turkey Point facility.

We have evaluated your response and found that it meets the requirements of

CFR 2.201.

We will examine the implementation of your corrective actions during future inspections.

We appreciate your cooperation.in this matter.

Sincerely, cc: ~J.

S.

Odom, Vice Presi dent Turkey Point Nuclear Plant

~.

E. Cross, Plant Manager Turkey Point Nuclear Plant

~.

W. Bladow, Plant QA Superintendent M. Arias, Jr., Regulatory and Compliance Supervisor State of Florida Thomas R. Decker, Acting Chief Emergency Preparedness and Radiological Protection Branch Division of Radiation Safety, and Safeguards bccv G.

E. Edison, Project Manager, Project Directorate II-2, Division of Reactor Projects, NRR NRC Resident Inspector ~

DRS Technical Assistant Document Control Desk RII PSto dart:ra 11/8 /88 11/Oq /88

=-

RI If/t.gz Pr RCrlenjak 11/o 'f/88 8811220186 881109'DR ADOCK 05000250 G

PNU lp

~Ho/