IR 05000250/1988014
| ML17345A426 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 09/15/1988 |
| From: | Wilson B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Conway W FLORIDA POWER & LIGHT CO. |
| References | |
| NUDOCS 8810050299 | |
| Download: ML17345A426 (2) | |
Text
ACCZ>MRATZD DISIGUBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
CESSION NBR:8810050299 DOC.DATE: 88/09/15 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION WILSON,B.A.
Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION CONWAY,W.F.
Florida Power
& Light Co.
SUBJECT: Ack receipt of 880829 ltr informing NRC of steps taken to correct violations noted in Insp Rept 50-250/88-14.
DISTRIBUTION CODE:
IEOID COPIES RECEIVED:LTR (ENCL /
SIZE:
(
TITLE: General (50 Dkt)-Insp Rept/Notice of VioTation Response NOTES RECIPIENT ID CODE/NAME PD2-2 PD COPIES LTTR ENCL
1 RECIPIENT ID CODE/NAME EDISON,G COPIES LTTR ENCL
2 A
INTERNAL: AEOD NRR MORISSEAU,D NRR/DLPQ/QAB 10 NRR/DREP/EPB
NRR/DRIS DIR 9A NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR DEPY RNAL: LPDR NSIC
1
1
1
1
1
1
1
1
1
1 NRC PDR
1 DEDRO
NRR/DLPQ/PEB 11
NRR/DOEA DIR 11
NRR/DREP/RPB
2 NRR/PMAS/ILRB12
O~Zr-G FI,LE
1 CH2 FXQ" 07. ~ 1 R
I h
TOTAL NUMBER OF COPIES REQUIRED:
LTTR
ENCL
Florida Power and Light Co'mpany ATTN:
Mr. W.
F.
Conway Senior Vice President Nuclear P. 0.
Box 14000 Juno Beach, FL 33408-0420 Gentlemen:
SUBJECT:
REPORT NOS. 50-250/88-14 AND 50-251/88-14 Thank you for your response of August 29, 1988, to our Notice of Violation issued on July 29, 1988, concerning activities conducted at your Turkey Point facility.
We nave evaluated your response and found that it meets the requirements of
CFR 2.201.
We will examine the implementation of your corrective actions during future inspections.
We appreciate your cooperation in this matter.
Sincerely, Original signed by R. V. Crlenjak Bruce A. Wilson, Chief Reactor Projects Branch
Division of Reactor Projects cc:
J.
S.
Odom, Vice President Turkey Point Nuclear Plant J.
E. Cross, Plant Manager Turkey Point Nuclear Plant L.
W. Bladow, Plant QA Superintendent J. Arias, Jr.,
Regulatory and Compliance.
Supervisor State of Florida bcc:
G.
E. Edison, Project Manager, Project Directorate II-2, Division of Reactor Projects, NRR NRC Resident Inspector DRS Technical Assistant Document Control Desk RII CC istensen:er 09/)( /88 RCrl enjak 09/I( /88 po 0050299 egppg 5 ADOCK 05000 Sp PDC