IR 05000250/1988018
| ML17345A472 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 10/26/1988 |
| From: | Wilson B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Conway W FLORIDA POWER & LIGHT CO. |
| References | |
| NUDOCS 8811010432 | |
| Download: ML17345A472 (2) | |
Text
ACCEMRATED DI~i~BUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RZDS)
ACCESSION NBR:8811010432 DOC.DATE: 88/10/26 NOTARiZED:
NO
'OCKET
~
~
FACIL:50-250 Turkey Point Plant, Unit 3, Florida Powe and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Powe" and Light C 05000251 AUTH.NAME AUTHOR AFFILIATEION WILSON,B.A.
Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION CONWAY,W.F.
Florida Power
& Light Co.
SUBJECT:
Ack receipt of 880930 ltr informing NRC of steps taken to correct violations noted in Insp Repts'50-250/88-18.
'I
)
DISTRIBUTION CODE IEOlD COPIES RECEIVED:LTR J ENCL +
SIZE:
TITLE: General,(50 Dkt)-Insp Rept/Notice of Violation Response NOTES:
INTERNAL:
TERNAL:
RECIPIENT ID CODE/NAME PD2-2 PD AEOD NRR MORISSEAUgD NRR/DLPQ/QAB 10 NRR/DREP/EPB
NRR/DRZS DIR 9A NUDOCS-ABSTRACT OGC/HDS2
'ES/DSR DEPY LPDR NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME EDISON,G DEDRO NRR/DLPQ/PEB
NRR/DOEA DZR 11 NRR/DREP/RPB
NRR PMAS/ILRB12 b " BE N,J G RXLE
RGN2 FILE
NRC PDR RESL MARTIN,D COPIES LTTR ENCL
1
2
1,
1 R
D S
TOTAL NUMBER OF COPIES REQUIRED:
LTTR
ENCL
OCT C 6 IS88 Florida Power and Light Company
/ATTN:
Mr. W. F.
Conway Senior Vice President - Nuclear P. 0.
Box 14000:,
Juno Beach, FL 33408-0420 Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NOS. 50-250/88-18 AND 50-251/88-18 Thank you for your response of September 30, 1988, to our Notice of Violation issued on September 2,
1988, concerning activities conducted at your Turkey Point facility.
We have evaluated your response and found that it meets the requirements of
CFR 2.201.
We will examine the implementation of your corrective actions during future inspections.
We appreciate your cooperation in this matter.
Sincerely, cg w/encl:
M. S.
Odom, Vice President Turkey Point Nuclear Plant
+.
E. Cross, Plant Manager Turkey Point Nuclear Plant
~.
W. Bladow, Plant gA Superintendent Q. Arias, Jr., Regulatory and Compliance Supervisor State of Florida Or}jfnat Stgnc~
W~.
8RUCE.Ai. iV(LSCi'1 Bruce A. Wilson, Chief Reactor. Projects Branch
Division of Reactor Projects
~
~
cc w/encl:
G.
E. Edison, Project Manager, Project Directorate II-2, Division of Reactor Projects, NRR ARC Resident Inspector DRS Technical Assistant Document Control Desk l
881 1 Ol 0432 88'26 PDR ADOCK 05000250
PNU RII C. ~
MLewis 10/9 l/88 RI RCr enjak 10/
/88 ME~(