REGULATORY INFORMATION DISTRIBUTION SYSTEM (RZDS)
CCESSION NBR:8901130270 DOC.DATE: 89/01/06 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION WILSON,B.A.
Region 2, Ofc of the Director RECZP.NAME RECIPIENT AFFILIATION CONWAY,W.F.
Florida Power
& Light Co.
SUBJECT:
Ack receipt of 881219" ltr informing NRC of steps taken to correct vxolations noted in Znsp Repts 50-250,251/88-30.
DISTRIBUTION CODE:
IEOID COPIES RECEIVED: LTR I
ENCL 9 SIZE:
/
TITLE: General (50 Dkt)-Insp Rept/Notice of VioIation Response NOTES:
INTERNAL:
RECIPIENT ID CODE/NAME PD2-2 PD AEOD DEDRO NRR/DEST DIR NRR/DLPQ/QAB 10 NRR/DREP/EPB
NRR/DRIS DIR 9A NUDOCS-ABSTRACT OGC/HDS2 RGN2 FILE
COPIES LTTR ENCL RECIPIENT ID CODE/NAME EDISON,G AEOD/DEIIB NRR SHANKMAN,S NRR/DLPQ/PEB 11 NRR/DOEA DIR 11 NRR/DREP/RPB
NRR/PMAS/ILRB12 OE LI RMAN,J REG FI
COPIES LTTR ENCL
1
1
1
1 EXTERNAL: LPDR NSIC NRC PDR RESL MARTIN,D R
I A
IIRZDSII RECZPZENZS
~
PLEASE HELP US K) REDUCE WASTE!
CXNTACZ~ DXX1MERI'ONTROL DESK, ROOM Pl-37 (EXT. 20079)
%0 ELIMINATEACR NAME HKH DZEG%CBVTION LISTS FOR DOCUKWZS KU DGNFT NEED)
TOTAL NUMBER OF COPIES REQUIRED:
LTTR
ENCL
SAN 06 1988 Florida Power and Light Company v'TTN:
Mr. W. F.
Conway Senior Vice President
- Nuclear P. 0.
Box 14000 Juno Beach, FL 33408-0420 Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NOS. 50-250/88-30 AND 50-251/88-30 Thank you for your response of December 19, 1988, to our Notice of Violation issued on November 23, 1988, concerning activities conducted at your Turkey Point facility.
We have evaluated your response and found that it meets the requirements of
CFR 2.201.
We will examine the implementation of your corrective actions during future inspections.
We appreciate your cooperation in this matter.
Sincerely, cc: ~
S.
Odom, Vice President Turkey Point Nuclear Plant M. E. Cross, Plant Manager Turkey Point Nuclear Plant.
ZL. W. Bladow, Plant gA Superintendent PJ. Arias, Jr., Regulatory and Compliance Supervisor State of Florida 0r@naf Sfgnaf y BRUCE A.',YI~
Bruce A. Wilson, Chief Reactor Projects Branch
Division of Reactor Projects bcc: A. E. Edison, Project Manager, Project Directorate II-2, Division of Reactor Projects, NRR NRC Resident Inspector DRS Technical Assistant Document Control Desk S90il30270 S90106 l
P DR ADOCK 05000250
PDC Rjj ~
WPoertner:saj 01/ ~/89 R rl'enjak 01/
/89 p
~0/