Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-250/88-21 & 50-251/88-21
ML17345A508
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/09/1988
From: Wilson B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Conway W
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8811150474
Download: ML17345A508 (4)


Text

ACGZLEHATED DISTRIBUTION DEMONSTRATION SYSTEM

'EGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CESSION NBR:8811150474 DOC.DATE: 88/11/09 NOTARIZED: NO DOCKET g

FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION WILSON,B.A.

Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION CONWAY,W.F.

Florida Power

& Light Co.

SUBJECT:

Ack receipt of 881024 ltr informing NRC of steps taken to correct violations noted in Insp Rept 50-250/88-21.

DISTRIBUTION CODE:

IEOID COPIES RECEIVED: LTR ENCL M SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Vio ation Response NOTES RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: AEOD NRR MORISSEAU i D NRR/DLPQ/QAB 10 NRR/DREP/EPB

NRR/DRIS DIR 9A NUDOCS-ABSTRACT OGC/HDS2 RGN2 FILE

EXTERNAL: LPDR NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME EDISON,G DEDRO NRR/DLPQ/PEB 11 NRR/DOEA DIR 11 NRR/DREP/RPB

NRR/PMAS/ILRB1 2 OE L N,J HE@ FFF E

NRC PDR RESL MARTIN,D COPIES LTTR ENCL A

NOTE TO ALL "RIDS" RECIPZEPIS:

PLEASE HELP US 'ZO REDUCE WASTEl CXKZACT 'IHE DOCIM'".Pl CONIBOL DESK RCCM Pl-37 (EXT. 20079)

KO EI1IMIlQZE KKR K&K PRCH DISTRIBVZIGN LISTS FOR DOCUHEHZS YOU DONPT NEED<

A D

D S

TOTAL NUMBER OF COPIES REQUIRED:

LTTR

ENCL

HOV Oe ieae Florida Power and Light Company TTN:

Mr.

W.

F.

Conway Senior Vice President - Nuclear P. 0.

Box 14000 Juno Beach, FL 33408-0420 Gentlemen:

SUBJECT:

REPORT NOS. 50-250/88-21 AND 50-251/88-21 Thank you for your response of October 24, 1988, to our Notice of Violation issued on September 26, 1988, concerning activities conducted at your Turkey Point facility.

We have evaluated your response and found that it meets the requirements of

CFR 2.201.

We wi 11 examine the implementation of your corrective actions during future inspections.

We appreciate your cooperation in this matter.

Sincerely, Original signed by Bruce A. Wilson, Chief Reactor Projects Branch

Division of Reactor Projects cc: ZJ.

S.

Odom, Vice President Turkey Point Nuclear Plant 2J.

E. Cross, Plant Manager Turkey Point Nuclear Plant

.

W. Bladow, Plant gA Superintendent J. Arias, Jr.,

Regulatory and Compliance Supervisor State of Florida bcc:

G.

E. Edison, Project Manager, Project Directorate II-2, Division of Reactor Projects, NRR RC Resident Inspector DRS Technical Assistant Document Control Desk RII WKPoertner:er 11/'7 /88 RVCrlenjak 11/ 7/88 gpfy>~0474 381l09 pap AKiOCK 0 000250

PDC