AUG 0 3 1988 Docket Nos. 50-250, 50-251 License Nos.
DPR-31, DPR-41 Fl ida Power and Light Company
~
~
TN:
Mr. W. F.
Conway Senior Vice President
- Nuclear P. 0.
Box 14000 Juno Beach, FL 33408-0420 Gentlemen:
SUBJECT:
NOTICE OF VIOLATION (NRC INSPECTION REPORT NOS. 50-250/88-11 AND 50-251/88-11)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by D.
R. Brewer on April 25 - June 3, 1988.
The inspection included a review of activities authorized for your Turkey Point facility.
The report documenting this inspection was sent to you by letter dated July 7, 1988.
NRC concerns relative to the inspection findings were also discussed in an Enforcement Conference held on July 13, 1988.
A summary of this Enforcement Conference is enclosed.
Your dedicated commitment to conducting a broad based root cause determination and holding all levels of personnel including management accountable for these errors is supported by the NRC and should result in minimizing these events in the future.
Based on the r'ecent series of events affecting valve alignment at Turkey Point, the NRC feels that FPL corrective actions were appropriate.
The NRC will continue to monitor progress in this area while holding FPL management accountable for improvement.
The violation, with pertinent references and elements to be included in your response, is described in the enclosed Notice.
This is similar to a violation contained in the Notice sent to you by our letters dated March 18, 1988, April 15, 1988, April 26, 1988 and May 25, 1988.
Because
"similar violations,"
as described in the NRC Enforcement Policy, are of significant concern to the NRC, please give particular attention in your response to the identification of the root cause of this problem and your corrective actions to prevent recurrence.
In accordance with Section 2.790 of the NRC's
"Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosures will be placed in the NRC Public Document Room.
8808150340 880803 PDR ADOCK 05000250 PNU
Florida Power and Light Company AUG 0 3
)988 The responses directed by this letter and its enclosures are not subject to'the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, Pub.
L. No.96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely, Original signed by Enclosures:
1.
Enforcement Conference Meeting Summary 3.
List of Attendees 4.
Handouts J.
Nelson Grace Regional Administrator e
cc~/encls:
Q.
S.
Odom, Vice President key Point Nuclear Plant
. E.'ross, Plant Manager Turkey Point Nuclear Plant Lk. W. Bladow, Plant gA Superintendent rias, Jr., Regulatory and Compliance Supervisor bcc w/encls:
~Lieberman, Director, Office of Enforcement 4.
E. Edison, Project Manager, Project Directorate II-2, Division of Reactor rojects, NRR C Resident Inspector DRS Technical Assistant Document Control Desk State of Florida R I R
lenjak:er 07/4.)/88 Wils n
/88 RII G en ns 07/g7/88 RII RII eyes rnst 7/g7'88 07~88