IE Insp Rept 50-237/78-33 & 50-249/79-34 on 781121 & 1227-28.No Noncompliance Noted.Major Areas Inspected:Spent Fuel Storage Rack Records,Repair Program, & Nondestructive Examination Activities
ML17173A680
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 01/25/1979
From: Danielson D, Eric Lee
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML17173A678 List:
References
50-237-78-33, 50-249-78-34, NUDOCS 7903130047
Download: ML17173A680 (3)


Text

...

U.S. NUCLE~ REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report No. 50-237/78-33; 50-249/78-34 Docket No. 50-237; 50-249 License No. DPR-19; DPR-25 Licensee:

Commonwealth Edison Company P. 0. Box 767 Chicago, Illinois 60690 Facility Name:

Dresden Nuclear Power Station, Units 2 and 3 Inspection At:

Dresden Site, Morris, Illinois Inspection Conducted:

November 21, December 27 and 28, 1978

/JI*.

.

.*~-

I.... I.,_

  • ' *

l

  • /

/* l \\

Inspector:

E. W. K. Lee i ;

I,.- ;, I I 7 *-.

I -1 _, f i

.

/, f '/.*\\.. l t* V\\. ~- L. I f-c,.

Approved By: D. H. Danielson, Chief I J.:;;_.S / '/ 'j

)

Engineering Support Section 2 Inspection Summary Inspection on November 21, December 27 and 28, 1978 (Reports N /78-33 and No. 50-249/78-34)

Areas Inspected:

Spent fuel storage rack records, repair program, and observation of NDE work activitie The inspection involved 14

. inspector-hours onsite by one inspector.

. Results:

No items of noncompliance or deviations were identified.

,.

DETAILS Persons Contacted Principal Licensee Employees

  • J. D. Brunner, Technical Staff Engineer R. Kyrouac, Quality Control Engineer
  • B. R. Shelton, Administrative Assistant G. Smith, Technical Staff Engineer
  • B. B. Stephenson, Station Superintendent The inspector also talked with and interviewed several other licensee and contractor employees, including members of the quality control and NDE personne *Denotes those present at the exit intervie Functional or Program Areas Inspected Spent Fuel Storage Rack - Review of Records The inspector reviewed General Electric Company Product Quality Certifications (PQC) No. 549, No. 552, No. 553, No. 557, and N and Nuclear Services Corporation inspection report dated May 21, 197 The inspector determined that the documents indicated that specification and procedure requirements were me No items of noncompliance or deviations were identifie.

Spent Fuel Storage Rack - Review of Repair Program The inspector reviewed the repair program dated December 13, 1978, and the metallurgical report of a cracked rac It was determined that corrective action and acceptance criteria were stated in the repair progra The inspector has no further questions at this tim No items of noncompliance or deviations were identifie.

Observation of NDE Work Activities The inspector observed liquid penetrant examination of the structural welds on Spent Fuel Storage Racks No. 98, Side B; No. 106, Side A; and No. 105, Side It was determined that:

(1) several indications were

-

2 -

  • found and are being evaluated in accordance with the repair program; (2) procedure requirements were met; and (3) personnel were properly qualifie No items of noncompliance or deviations were identifie Exit Interview The inspector met with the licensee representatives (denoted in the Persons Contacted paragraph) on December 28, 197 The inspector summarized the scope and findings of the inspectio The licensee acknowledged the informatio