IE Insp Rept 50-237/78-26 on 781023-26 & 1031-1102. Noncompliance Noted:Failure to Dispatch Form NRC-741 on Same Day Matl Was Shipped.Details Withheld(Ref 10CFR2.790)
ML19274D092
Person / Time
Site: Dresden Constellation icon.png
Issue date: 12/07/1978
From: Finley A, Hind J, Patterson J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19274D090 List:
References
50-237-78-26, NUDOCS 7901090401
Download: ML19274D092 (1)


Text

.

.

,

.

'

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report No. 50-237/78-26 Docket No. 50-237 License No. DPR-19 Licensee: Commonwealth Edison Company Post Office Box 767 Chicago, IL 60690 Facility Name: Dresden Nuclear Generating Station, Unit 2 Inspection At: Dresden Site, Morris, IL Inspection Conducted: October 23-25 and October 31-November 2, 1978 f.h* h!'

Inspectors: M.G.Finley

//[7 2[

<,(f. hY

/2/7/78 P. Patterson

/,$/7///

Approved By: ['A hi C

f Safeguards Branch Insyection Summary Inspection on October 23-26 and October 31-November 2, 1978 (Report No. 50-237/78-26)

Areas Inspected: Material Control and Accountability including facility organizr.tien and operation; measurements and control; storage and internal contro.'.s; shipping and receiving; records and reports; inventory and invent >ry verification; and management of material control system. The inspection involved 45 inspector-hours onsite by two NRC inspectors.

Results: Of the seven areas inspected, no apparent items of noncompliance or deviations were identified in six areas; one apparent item of noncom-pliance/ deficiency - failure to dispatch Forms NRC-741 on the same day material was shipped (Paragraph 7).

Details (Part 2.790(d) Information)

.

?901099y r

t

.