U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
REGION III
Report No. 50-237/78-26 Docket No. 50-237 License No. DPR-19 Licensee: Commonwealth Edison Company Post Office Box 767 Chicago, IL 60690 Facility Name: Dresden Nuclear Generating Station, Unit 2 Inspection At: Dresden Site, Morris, IL Inspection Conducted: October 23-25 and October 31-November 2, 1978 f.h* h!'
Inspectors: M.G.Finley
//[7 2[
<,(f. hY
/2/7/78 P. Patterson
/,$/7///
Approved By: ['A hi C
f Safeguards Branch Insyection Summary Inspection on October 23-26 and October 31-November 2, 1978 (Report No. 50-237/78-26)
Areas Inspected: Material Control and Accountability including facility organizr.tien and operation; measurements and control; storage and internal contro.'.s; shipping and receiving; records and reports; inventory and invent >ry verification; and management of material control system. The inspection involved 45 inspector-hours onsite by two NRC inspectors.
Results: Of the seven areas inspected, no apparent items of noncompliance or deviations were identified in six areas; one apparent item of noncom-pliance/ deficiency - failure to dispatch Forms NRC-741 on the same day material was shipped (Paragraph 7).
Details (Part 2.790(d) Information)
.
?901099y r