IR 05000206/1980029
| ML19341A953 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 01/12/1981 |
| From: | Norderhaug L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Papay L SOUTHERN CALIFORNIA EDISON CO. |
| References | |
| NUDOCS 8101290548 | |
| Download: ML19341A953 (2) | |
Text
- - - -
_ __ _ _-
._ -
__
_
_ _ _ _ _ _ _ _ _
m_
. _.
_
-__
__
_
f*)* %
c UNITED STATES
! * ; 3,_g(
NUCLEAR REGULATORY COMMISSION
~c.h [c nEGION V
-/'
b[
1900 N. CALIFORNI A BOULEVARD
o,
'
%.% e *Y [
SU6TE 202, WALNUT CREEK PLAZA
,
..e WA LNUT CR E E K, CAllFORNt A 94596 January 12, 1981
,
'
j Docket No. 50-206 j
?
,
M'k
Southern California Edison Comoany
- "[
.
".'
P. O. Box 800 An J{N 2244 Walnut Grove Avenue
.
Rosemead, California 91770
--,y Attention: Dr. L. T. Papay, Vice President advanced Engineering Gentlemen:
This letter refers to the routine safeguards inspection of your activities authorized under NRC License No. DPR-13 conducted by Messrs. W. P. Mortensen, E. J. Pcwer and D. W. Schaefer of this office on November 3 - 7 and 18 - 21, 1980.
It also refers to the discussions of our inspection findings held by the inspectors with Mr. J. M. Curran and memoers of his staff on November 7, 1980 and with Mr. H. E. Morgan, acting for Mr. Curran on November 21, 1980.
The inspection included examination of activities related to your program for physical protection against industrial sabotage and against theft of special nuclear material in accordance with applicable requirements of Title 10, Code of Federal Regulations, Part 73, " Physical Protection of Plants and Materials", and pertinent license conditions as described in the enclosed inspection report. Uithin these areas, the inspection consisted of selective examinations of procedures and records, interviews with facility personnel and observations by the inspectors.
Based on the results of this inspection, it appears that certain of your activities were not conducted in full compliance with NRC requirements, as set forth in the Notice of Violation, enclosed herewith as Appendix A.
Pursuant to the provisiens of 10 CFR 2.201 you are required to respond as indicated therein.
In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2 Title 10, Code of Federal Regulations, documentation of findings of your
,
security precedures are exempt from disclosure; therefore, the enclosure to
!
this letter, the inspection report, and your response to the items listed in the enclosure to this letter will not be placed in the Public Document i
Room and will receive limited distribution.
i
,
@
..
t
--
,
..,,...., - -,,. -
-y,,
,,
.y.9--.,.,,._3--_.,,cy
,.,
.,.,.
%.y,--
.,.,.--
,, -,,,,
,,%y,.
-
,
,.
n a
Southern California Edison Corrpany-2-January 12, 1981 Should you have any questions concerning this letter, we wf11 te glad to discuss them with you.
Sincerely,
/l:'
,
.
.
)
/
,'
-ml7 4 2
.t 'v c T'
,/c / {R LeRoy
. 'l'orderhau
-
/
A j
Safeguards Branch [g, Chief Enclosures:
A.
Accendix A - Notice of Violation B.
Inspection Reoort tio. 50-205/80-29 (IE-V-411)
cc w/ enclosure:
R. Dietch, SCE J. M. Curran, SCE
..