U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
REGION V
Report No. 50-206/80-24 Docket No. 50-206 License N DPR-13 Safeguards Group Licensee:
Southern California Edison Company 2244 Walnut Grove Avenue Rosemead, California 91770 Facility Name:
San Onofre Unit 1 Inspection at:
San Onofre Inspection at:98 Inspection conducted:August 4-8, 1980 Inspectors:
___
A. J. H6<n, Reactor Inspector Date Signed Date Signed Date Signed Approved By: ' /
<t If B. H Faulk enberrL, qhief, Reactor Projects Section 2 Date Signed Reactor 00eiations and Nuclear Support Branch Summary:
Inspection on August 4-8, 1980 (Report No. 50-206/80-24)
Areas Inspected: Routine, announced inspection of fire protection modifications, IE Bulletin/Circular followup, and independent inspection effort. This inspection involved 25 hours2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br /> by one NRC inspecto Results:
No items of noncompliance or deviations were.identifie RV Form 219 (2)
80 117 0f6
DETAILS 1. Persons Contacted J. Curran, Plant.Manager
- H. Morgan, Superintendent
- J. Haynes, Manager, Nuclear Engineering (New)
- D. Nunn, QA Manager
- G. McDonald, QA/QC Supervisor
- L. Gregory, Startup, SCE
- R. Tinsley, Startup
- L. Hebert, Startup
- D. Nicholson, Startup BPC
- D. Nanda, Project, SCE F. Briggs, Engineer S. Scholl, Engineer
- Denotes those persons who attended the exit intervie. IE Bulletin/Circular Followup a. (Closed)Bulletin 80-08 The licensee determined that all containment liner penetration welds within the scope of this Bulletin were required to be fully radiographed during constructio No further action require b. (Closed)Bulletin 80-12 The inspector verified that the licensee has implemented procedure changes that meet the requirements of the Bulleti c. (Closed)Bulletin 80-16 The licensee determined that this Bulletin is not applicable to San Onofre Unit. Fire Protection Modifications Amendment No. 44 to Provisional Operating License No. DPR-13 consists of changes to the Appendix A Technical Specifications for fire protection systems. The amendment, in part, requires certain fire protection modifications be completed by the end of the Core 8 refueling (Spring 1980).
The inspector reviewed completed work packages and verified that most of the modifications have been completed, including acceptance by the SCE QA department. One of the committments in the SER (to amendment 44)
has been changed, but the inspector was unable to verify, during this inspection, NRR approval for the chang Further reviews by NRR and consultants as to the acceptability of the modifications being made by the licensee may require additional change The inspector will further review the status of the licensee's fire protection modifications at a later inspectio (80-18-02)
4. Exit Interview The inspector met with the licensee representatives denoted in paragraph 1 on August 8, 1980 to discuss the findings of this inspection. The inspector noted that the completion of the fire protection modifications will be followed during a later inspection (see paragraph 3).