| HQ Division | |
|---|
| from | MONTHYEARML16089A3812016-12-310Issue date: 31 December 2016 Title: Draft Regulatory Guide (DG)-1334, Guidance for Implementation of 10 CFR 50.59, Changes, Test, and Experiments ML16327A3702016-11-250Issue date: 25 November 2016 Title: Enclosure 3: Exelon Byron Station Design (Meeting Handout) ML16239A0132016-08-180Issue date: 18 August 2016 Title: External Sender E-mail NRC Feedback and Path-Forward Regarding Draft NEI 96-07 Appendix D ML16239A0092016-08-180Issue date: 18 August 2016 Title: E-mail NRC Feedback and Path-Forward Regarding Draft NEI 96-07 Appendix D Information Notice 2016-09, Recent Issues Identified When Using Reverse Engineering Techniques in the Procurement of Safety-Related Components2016-07-150Issue date: 15 July 2016 Title: Recent Issues Identified When Using Reverse Engineering Techniques in the Procurement of Safety-Related Components Information Notice 2016-07, Operating Experience Regarding Impacts on Site Electrical Power Distribution from Inadequate Oversight of Contractor Activities2016-06-200Issue date: 20 June 2016 Title: Operating Experience Regarding Impacts on Site Electrical Power Distribution from Inadequate Oversight of Contractor Activities Information Notice 2016-07, Operating Experience Regarding Impacts on Site Electrical Power Distribution From Inadequate Oversight of Contractor Activities2016-06-200Issue date: 20 June 2016 Title: Operating Experience Regarding Impacts on Site Electrical Power Distribution From Inadequate Oversight of Contractor Activities RIS 2016-05, Embedded Digital Devices in Safety-Related Systems2016-04-290Issue date: 29 April 2016 Title: Embedded Digital Devices in Safety-Related Systems ML16111A0032016-04-250Issue date: 25 April 2016 Title: Completion of Action Nos. 1a, 1b, and 2 Associated with Topic 1 of the San Onofre Steam Generator Tube Degradation Event Lessons Learned RIS 2016-04, Clarification of 10 CFR 50.46 Reporting Requirements and Recent Issues Identified with Guidance Not Approved for Use2016-04-190Issue date: 19 April 2016 Title: Clarification of 10 CFR 50.46 Reporting Requirements and Recent Issues Identified with Guidance Not Approved for Use ML16070A3622016-03-150Issue date: 15 March 2016 Title: Summary of Public Meeting Between U.S. Nuclear Regulatory Commission Staff and Exelon Generation Company, LLC to Discuss an Appeal of a Compliance Backfit ML16082A0422016-03-140Issue date: 14 March 2016 Title: Email-ASchwab to Tschiltz - Draft of Proposed Detailed Agenda for March 16 Workshop ML15224A0052015-12-180Issue date: 18 December 2015 Title: Final Generic Letter 2016-XX, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools ML15345A0092015-12-090Issue date: 9 December 2015 Title: 12/9/2015 - Qualitative Assessment for Crediting Mitigating Strategies Equipment in Ri Decision Making RIS 2015-13, Seismic Stability Analysis Methodologies for Spent Fuel Dry Cask Loading Stack-up Configuration2015-11-120Issue date: 12 November 2015 Title: Seismic Stability Analysis Methodologies for Spent Fuel Dry Cask Loading Stack-up Configuration RIS 2015-14, Issuance of Enforcement Guidance Memorandum - Emergency Plan and Emergency Plan Implementing Procedure Updates2015-10-300Issue date: 30 October 2015 Title: Issuance of Enforcement Guidance Memorandum - Emergency Plan and Emergency Plan Implementing Procedure Updates ML15181A4182015-07-290Issue date: 29 July 2015 Title: OEDO-14-00565 - 2.206 Closure Letter IR 05000083/20142022015-01-140Issue date: 14 January 2015 Title: University of Florida Safety Inspection Report No. 050083/2014-202 Information Notice 2014-14, Potential Safety Enhancements to Spent Fuel Pool Storage2014-11-140Issue date: 14 November 2014 Title: Potential Safety Enhancements to Spent Fuel Pool Storage RIS 2013-17, Resuming Normal Interactions Between the NRC and NRC Stakeholders Following an Agency Shutdown2013-10-170Issue date: 17 October 2013 Title: Resuming Normal Interactions Between the NRC and NRC Stakeholders Following an Agency Shutdown Information Notice 2013-17, Significant Plant Transient Induced by Safety-Related Direct Current Bus Maintenance at Power2013-09-060Issue date: 6 September 2013 Title: Significant Plant Transient Induced by Safety-Related Direct Current Bus Maintenance at Power Information Notice 2013-17, Significant Plant Transient Induced By Safety-Related Direct Current Bus Maintenance At Power2013-09-060Issue date: 6 September 2013 Title: Significant Plant Transient Induced By Safety-Related Direct Current Bus Maintenance At Power ML13105A0182013-05-160Issue date: 16 May 2013 Title: Request for Additional Information Regarding APS Overall Integrated Plan in Response to Order EA-12-049 ML1218500372012-07-110Issue date: 11 July 2012 Title: NRC Response to Performance Contracting, Inc. Regarding the Wolf Creek/Callaway Bypass Test Plan and Preliminary Results ML1212805092012-06-180Issue date: 18 June 2012 Title: May 1, 2012 - Summary of Teleconference with Performance Contracting, Inc., Regarding Large Flume Testing for Point Beach Nuclear Plant ML13162A6292012-03-210Issue date: 21 March 2012 Title: From Andrea Russell to Samson Lee: PRB Revised Notes Attached ML12031A0102012-02-070Issue date: 7 February 2012 Title: Acceptance for Review of Boiling Water Reactor Owners Group (BWROG) Topical Report BWROG-TP-11-022, Revision 1, Pressure-Temperature Limits Report Methodology for Boiling Water Reactors (TAC ME7649), ML1036206292010-12-230Issue date: 23 December 2010 Title: Email to Jim Bleigh (Performance Contracting, Inc.) Requesting Public Version of Debris Piles & Conclusions Information Notice 2010-10, Implementation of a Digital Control System Under 10 CFR 50.592010-05-280Issue date: 28 May 2010 Title: Implementation of a Digital Control System Under 10 CFR 50.59 ML1005396232010-02-220Issue date: 22 February 2010 Title: Lessons Learned Task Force Action Plan Regarding Stress Corrosion Cracking Dec 2009 (Final Update) ML0934406132009-12-150Issue date: 15 December 2009 Title: Notice of Meeting with Boiling Water Reactor Owners Group (BWROG) to Discuss the BWROG Ew of In-vessel Downstream Effects for Boiling Water Reactor ML0932102342009-12-070Issue date: 7 December 2009 Title: NRC Regulatory Issue Summary 2009-xx Monitoring the Status of Regulated Activities During a Pandemic ML0930006022009-11-130Issue date: 13 November 2009 Title: Summary of Meeting with the Boiling Water Reactor Owners Group Bwrog), to Discuss the BWROG Review of in-Vessel Downstream Effects for Boiling Water Reactors (Bwrs) ML0832502332008-12-020Issue date: 2 December 2008 Title: Summary of Public Meeting with Operators of Vogtle Units 1 & 2, San Onofre Units 2 & 3, St. Lucie Unit 1, Turkey Point Unit 3, Indian Point Units 2 & 3, Nuclear Energy Institute, and Alion Science and Technology Information Notice 2008-18, Loss of Safety-Related Motor Control Center Due to Bus Fault2008-12-010Issue date: 1 December 2008 Title: Loss of Safety-Related Motor Control Center Due to Bus Fault 2016-08-18 |
|---|
| to | MONTHYEARML16295A1282016-10-210Issue date: 21 October 2016 Title: Completion of Action 6c from the SONGS Lessons Learned Report ML16111A0032016-04-250Issue date: 25 April 2016 Title: Completion of Action Nos. 1a, 1b, and 2 Associated with Topic 1 of the San Onofre Steam Generator Tube Degradation Event Lessons Learned ML15323A0042015-11-160Issue date: 16 November 2015 Title: Memo Completion of Actions Associated with Topics 4,5, and 7 of the San Onofre Steam Generator Tube Degradation Event Lessons Learned ML15320A1042015-11-160Issue date: 16 November 2015 Title: Completion of Actions Associated with Topics 4, 5, and 7 of the San Onofre Steam Generator Tube Degradation Event Lessons Learned ML1212505882012-07-090Issue date: 9 July 2012 Title: Working ASR Team Charter ML1212805092012-06-180Issue date: 18 June 2012 Title: May 1, 2012 - Summary of Teleconference with Performance Contracting, Inc., Regarding Large Flume Testing for Point Beach Nuclear Plant ML12054A0832011-09-160Issue date: 16 September 2011 Title: Email from S. Rosenberg, NRR to A. Russell, NRR North Anna Seismic Issue Restart Action Plan ML12044A1382011-08-250Issue date: 25 August 2011 Title: Email from L. Cunningham, NRR to R. Auluck, NRR Et Al FW: PNO-11-11- 005A (North Anna) - Update ML1033401192010-12-060Issue date: 6 December 2010 Title: G20100592/EDATS: OEDO-2010-0775 - Draft Agenda for Forthcoming Meeting on 12/13/2010 with Petitioner on Requested Action Under 10 CFR 2.206 Regarding October 21, 2003 Event at Callaway Plant, Unit 1 ML1020904002010-01-270Issue date: 27 January 2010 Title: Email from Sabah Farideh to Mensah, Tanya, Et Al; Subject: G20090690-2.206 Petition Request ML1020903972010-01-260Issue date: 26 January 2010 Title: Email from Mensah, Tanya to Saba, Farideh, Et Al; Subject: Pis. Review: Draft G20090690 ML0832502332008-12-020Issue date: 2 December 2008 Title: Summary of Public Meeting with Operators of Vogtle Units 1 & 2, San Onofre Units 2 & 3, St. Lucie Unit 1, Turkey Point Unit 3, Indian Point Units 2 & 3, Nuclear Energy Institute, and Alion Science and Technology ML0832306632008-11-180Issue date: 18 November 2008 Title: Draft of BWROG ECCS Strainers Walkdown Guidance, Rev. C ML0832306562008-11-070Issue date: 7 November 2008 Title: Email: BWROG-ECCS Strainer Committee Walkdown Guidance 2016-04-25 |
|---|