NRC/NRO/DNRL/LB2
From kanterella
Jump to navigation
Jump to search
(NRC/NRO/DNRL/LB2) | |
|---|---|
1 May 2012 - 28 September 2018 | |
| HQ Office | |
Region 1Division
Branch
Region 2Division
Branch
Region 3Division
Branch
Region 4Division
Branch
| |
| [from] | MONTHYEARML18176A0512018-09-280Issue date: 28 September 2018 Title: APR1400 Chapter 15, Accident and Transient Analyses, Final Safety Evaluation Report ML18173A1012018-09-280Issue date: 28 September 2018 Title: APR1400 Chapter 14, Verification Programs, Final Safety Evaluation Report ML18082A2982018-09-280Issue date: 28 September 2018 Title: APR1400 Chapter 2, Site Characteristics, Final Safety Evaluation Report ML18081A5052018-09-280Issue date: 28 September 2018 Title: APR1400 Chapter 12, Radiation Protection, Final Safety Evaluation Report ML18078A0162018-09-280Issue date: 28 September 2018 Title: APR1400 Chapter 11, Radioactive Waste Management, Final Safety Evaluation Report ML18044A1852018-09-280Issue date: 28 September 2018 Title: APR1400 Chapter 10, Steam and Power Conversion System, Final Safety Evaluation Report ML18043A8872018-09-280Issue date: 28 September 2018 Title: APR1400 Chapter 9, Auxiliary Systems, Final Safety Evaluation Report ML17013A1462018-08-290Issue date: 29 August 2018 Title: Audit Summary to Review KHNP APR1400 Non-LOCA Chapter 15, Transient and Accident Analyses - Memo ML17230A2602018-08-210Issue date: 21 August 2018 Title: Summary for Audit Conducted from July 29, 2015 Through April 27, 2017and Transmittal Memo APR1400 Chapters 4, 6 and 9 ML18180A3272018-07-310Issue date: 31 July 2018 Title: APR1400 Topical Report Safety Evaluation, Realistic Evaluation Methodology for Large Break Loss of Coolant Accident of the APR1400 - KHNP Letter ML18131A2162018-06-210Issue date: 21 June 2018 Title: United States - Advanced Pressurized Water Reactor Advanced Topical Report Safety Evaluation for Topical Report MUAP-07001-P, Revision 6, the Advanced Accumulator - Letter ML18150A6482018-06-070Issue date: 7 June 2018 Title: APR1400, Supplementary Information for Safety Evaluation with No Open Items for Chapter 14.3, Inspections, Tests, Analyses and Acceptance Criteria (ITAAC) - Letter to KHNP ML18156A0432018-06-050Issue date: 5 June 2018 Title: APR1400 Topical Report Safety Evaluation, Realistic Evaluation Methodology for Large Break Loss of Coolant Accident of the APR1400 ML18156A0452018-06-050Issue date: 5 June 2018 Title: APR1400 Topical Report Safety Evaluation, Realistic Evaluation Methodology for Large Break Loss of Coolant Accident of the APR1400 - Letter to KHNP ML18149A5492018-05-310Issue date: 31 May 2018 Title: APR1400 Chapter 14.3.2, Structural and Systems Engineering - ITAAC, Safety Evaluation Report with No Open Items - Letter to KHNP ML18147A0022018-05-300Issue date: 30 May 2018 Title: Apr 1400 Chapter 13, Conduct of Operation, Safety Evaluation Report with No Open Items - Letter to KHNP ML18130A3672018-05-250Issue date: 25 May 2018 Title: APR1400 PLUS7, Fuel Design for APR1400, Topical Report Safety Evaluation Redacted ML18130A3702018-05-250Issue date: 25 May 2018 Title: APR1400 PLUS7, Fuel Design for APR1400, Topical Report Safety Evaluation - Letter to KHNP ML17188A3032018-05-210Issue date: 21 May 2018 Title: APR1400 Chapter 6, Engineered Safety Features, Safety Evaluation Report with No Open Items - Memorandum to ACRS ML17188A3042018-05-210Issue date: 21 May 2018 Title: APR1400 Chapter 6, Engineered Safety Features, Safety Evaluation Report with No Open Items - Letter to KHNP ML18054A6872018-05-210Issue date: 21 May 2018 Title: APR1400 Chapter 14.3, Verification Programs, Safety Evaluation Report with No Open Items ML18054A6882018-05-210Issue date: 21 May 2018 Title: APR1400 Design Certification Application - Safety Evaluation with No Open Items for Chapter 14, Section 14.3, Inspections, Tests, Analyses, and Acceptance Criteria (Itaac), (Except for Section 14.3.2, Structural and Systems Engineering) ML18054A6862018-05-200Issue date: 20 May 2018 Title: APR1400 Chapter 14.3, Verification Programs, Safety Evaluation Report with Open Items - Memorandum to ACRS Memo ML18122A2232018-05-080Issue date: 8 May 2018 Title: APR1400 Chapter 19, Section 19.2, Severe Accident Evaluation, Safety Evaluation Report with No Open Items - Letter to KHNP ML18128A3002018-05-080Issue date: 8 May 2018 Title: APR1400 Chapter 17, Quality Assurance and Reliability Assurance, Safety Evaluation Report with No Open Items - Letter to KHNP ML18128A1132018-05-080Issue date: 8 May 2018 Title: APR1400 Chapter 19, Section 19.0 and Section 19.1, Probabilistic Risk Assessment and Severe Accident Evaluation, Safety Evaluation Report with No Open Items - Letter to KHNP ML18122A2242018-05-080Issue date: 8 May 2018 Title: APR1400 Chapter 19, Section 19.2, Severe Accident Evaluation, Safety Evaluation Report with No Open Items - Memorandum to ACRS ML18068A1292018-03-260Issue date: 26 March 2018 Title: March 7, 2018 Summary of Public Meeting with KHNP to Discuss Proposed ITAAC for the APR1400 ML18073A2552018-03-260Issue date: 26 March 2018 Title: Summary of March 14, 2018 Public Meeting with KHNP to Discuss Human Factors Engineering ML17265A1182018-03-230Issue date: 23 March 2018 Title: Letter to KHNP for the Safety Evaluation Report for Topical Report APR1400-F-A-TR-1200A-P Realistic Evaluation Methodology for Large Break Loss of Coolant Accident of the APR1400 ML18052B3162018-03-190Issue date: 19 March 2018 Title: Chapter 3 Phase 4 SER ML17269A3042018-03-190Issue date: 19 March 2018 Title: Letter to KHNP for Transmittal of Phase 4 Chapter 15 Safety Evaluation Report Transient and Accident Analyses ML17269A3152018-03-190Issue date: 19 March 2018 Title: Transmittal Memo to ACRS of the Chapter 15 Phase 4 Safety Evaluation Report Transient and Accident Analyses, APR1400 Design Certification ML18017A2432018-03-190Issue date: 19 March 2018 Title: Chapter_3_Phase_4_Letter ML18074A0322018-03-190Issue date: 19 March 2018 Title: APR1400 P4 Chapter 7 ACRS ML18074A0312018-03-190Issue date: 19 March 2018 Title: Apr 1400 P4 Chapter 7 Letter to KHNP ML18073A3912018-03-140Issue date: 14 March 2018 Title: Response to RAI 357-8344, Question 06.02.04-11, Notifying KHNP of the Need for an APR1400 Containment ITAAC to Verify That GDC 55, 56, and 57 Requirements Are Satisfied ML17166A1142018-02-230Issue date: 23 February 2018 Title: APR1400 Chapter 2 Phase 4 - Section 2.5 - Memo to ACRS ML17166A2692018-02-220Issue date: 22 February 2018 Title: APR1400 Chapter 2 Phase 4 - Section 2.5 - Letter to Korea Hydro and Nuclear Power Co., Ltd ML18012A6272018-01-250Issue date: 25 January 2018 Title: Chapter_9_Phase_4_Letter ML17276A0372018-01-250Issue date: 25 January 2018 Title: Transmittal Letter to KHNP for the Phase 4 Chapter 19.5, Aircraft Impact Assessment Safety Evaluation Report ML17271A3482018-01-250Issue date: 25 January 2018 Title: APR1400 P4 Chapter 19.3 Letter to KHNP ML17243A1242018-01-250Issue date: 25 January 2018 Title: Korea Hydro and Nuclear Power Co., Ltd, - Advanced Power Reactor 1400 Design Certification Application - Safety Evaluation with No Open Items for Section 19.4, Loss of Large Areas of the Plant Due to Explosions or Fire ML17340A9412018-01-120Issue date: 12 January 2018 Title: APR1400 Large Break Loss of Coolant Accident (LBLOCA) Topical Report Audit Issues - (Non-Proprietary) ML18011B0642018-01-110Issue date: 11 January 2018 Title: Removal of PRA-Based SMA Insights from Chapter 19 SER and APR1400 Design Certification Rule ML17276B5182017-12-280Issue date: 28 December 2017 Title: APR1400 P4 Chapter 18 ACRS Memo ML17188A3152017-12-280Issue date: 28 December 2017 Title: APR1400 Chapter 16 Phase 4 ACRS Memorandum ML17324B2882017-12-280Issue date: 28 December 2017 Title: APR1400 P4 Chapter 14.1-14.2 ACRS Memo ML17334A1042017-12-270Issue date: 27 December 2017 Title: APR1400 Chapter 4 Phase 4 Memorandum ML17132A2862017-12-260Issue date: 26 December 2017 Title: Audit Report of Structural and Seismic Design Supporting Chapter 3, Design of Structures, Systems, Components, and Equipment, of the Advanced Power Reactor 1400 Design Control Document ML17188A3112017-12-220Issue date: 22 December 2017 Title: APR1400 Chapter 16 Phase 4 SER Letter to KHNP ML17334A1612017-12-220Issue date: 22 December 2017 Title: APR1400 Chapter 4 Phase 4 Letter ML17324B3272017-12-220Issue date: 22 December 2017 Title: APR1400 P4 Chapter 14.1-14.2 SER Draft ML17324B3142017-12-220Issue date: 22 December 2017 Title: APR1400 P4 Chapter 14.1-14.2 Letter to KHNP ML17276B3402017-12-220Issue date: 22 December 2017 Title: APR1400 P4 Chapter 18 Letter to KHNP ML17270A4252017-09-280Issue date: 28 September 2017 Title: NRC Response Letter to KHNP Response to RAI 19-87 and Status Update ML17188A3002017-07-070Issue date: 7 July 2017 Title: APR1400 Chapter 6, Engineered Safety Features, Safety Evaluation Report with No Open Items ML17023A2582017-03-170Issue date: 17 March 2017 Title: APR1400 Chapter 14, Verification Programs, (Section 14.2 - ITP) Phase 2 Safety Evaluation with Open Items ML17058A4452017-03-170Issue date: 17 March 2017 Title: APR1400 Chapter 14, Phase 2 SER W/Ois Transmittal Letter to KHNP ML16300A2012016-12-070Issue date: 7 December 2016 Title: Audit Summary for the Korea Hydro and Nuclear Power Co. Ltd Advanced Power Reactor 1400 Electric Power System ML16300A1842016-12-070Issue date: 7 December 2016 Title: Memorandum - Audit Summary for the Korea Hydro and Nuclear Power Co. Ltd Advanced Power Reactor 1400 Electric Power System ML16265A5052016-10-060Issue date: 6 October 2016 Title: Apr 1400, Acceptance of Topical Report APR1400-K-Q-TR-11005-NP, Revision 5, KHNP Quality Assurance Program Description for the Apr 1400 Design Certification ML14148A4632014-07-280Issue date: 28 July 2014 Title: Final Safety Evaluation - Advanced Power Reactor 1400 Final Topical Report Safety Evaluation for KHNP Topical Report APR1400-K-Q-TR-11005-NP, Revision 4, KHNP Quality Assurance Program Description for APR1400 Design Certification ML14155A1722014-07-280Issue date: 28 July 2014 Title: Concurrence - Advanced Power Reactor 1400 Final Topical Report Safety Evaluation for the KHNP Topical Report APR1400-K-Q-TR-11005-NP, Revision 4, KHNP Quality Assurance Program Description for APR1400 Design Certification ML12263A3032012-08-290Issue date: 29 August 2012 Title: NEI 08-01 Draft Rev 5 - NRC Staff and NEI Discussion e-mails August 28, 2012 to August 30, 2012 ML12115A2052012-05-010Issue date: 1 May 2012 Title: Audit Plan for Reviewing the US-APWR Turbine Driven Emergency Feed Water Pump Room Transient Heat-Up Calculations 2018-09-28 |
| [to] | MONTHYEARML17013A1462018-08-290Issue date: 29 August 2018 Title: Audit Summary to Review KHNP APR1400 Non-LOCA Chapter 15, Transient and Accident Analyses - Memo ML17230A2602018-08-210Issue date: 21 August 2018 Title: Summary for Audit Conducted from July 29, 2015 Through April 27, 2017and Transmittal Memo APR1400 Chapters 4, 6 and 9 ML18121A1312018-04-260Issue date: 26 April 2018 Title: MHIs Response to NRCs Request for Additional Information 1099 ML18073A2552018-03-260Issue date: 26 March 2018 Title: Summary of March 14, 2018 Public Meeting with KHNP to Discuss Human Factors Engineering ML18068A1292018-03-260Issue date: 26 March 2018 Title: March 7, 2018 Summary of Public Meeting with KHNP to Discuss Proposed ITAAC for the APR1400 ML18016A3322018-01-160Issue date: 16 January 2018 Title: Email Response: Removal of PRA-based SMA Insights from Chapter 19 SER and APR1400 Design Certification Rule ML17023A2582017-03-170Issue date: 17 March 2017 Title: APR1400 Chapter 14, Verification Programs, (Section 14.2 - ITP) Phase 2 Safety Evaluation with Open Items ML16300A2012016-12-070Issue date: 7 December 2016 Title: Audit Summary for the Korea Hydro and Nuclear Power Co. Ltd Advanced Power Reactor 1400 Electric Power System ML16300A1842016-12-070Issue date: 7 December 2016 Title: Memorandum - Audit Summary for the Korea Hydro and Nuclear Power Co. Ltd Advanced Power Reactor 1400 Electric Power System ML16211A3512016-08-040Issue date: 4 August 2016 Title: Supplemental Safety Evaluation Report for Topical Report APR1400-K-Q-TR-11005-NP, Revision 5, Knhp Quality Assurance Program Description for the APR1400 Design Certification 2018-08-29 |