GO2-82-803, Advises That Deficiency Repts Re Electrical Cable Routing, Termination,Labeling,Power Supplies & QC Documentation Have Been Reopened.Interim Repts Will Be Provided by 821218

From kanterella
Jump to navigation Jump to search
Advises That Deficiency Repts Re Electrical Cable Routing, Termination,Labeling,Power Supplies & QC Documentation Have Been Reopened.Interim Repts Will Be Provided by 821218
ML20063N934
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/23/1982
From: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, G2-82-803, GO2-82-803, NUDOCS 8210070370
Download: ML20063N934 (2)


Text

  • Docket No. 50-397 w

a 50.55(e) Report s

'P j'i:)

Washington Public Power Supply System P.O. Box 968 3000 GeorgeWashingtonWay Richland, Washington 99352 (509)372-50007 ,

Docket No. S0-397

' ," !? u ;

September 23, 1982 G02-82-803 Mr. R. H. Engelken U.S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596

Subject:

NUCLEAR PROJECT NO. 2 10CFR50.55(e) REPORTABLE CONDITIONS #22, 37, 40, 49, 53, 54, 60, 64, and 82; DEFICIENCIES IN ELECTRICAL CABLE ROUTING, TERMINATION, LABELING, POWER SUPPLIES, AND QUALITY CONTROL DOCUMENTATION

Reference:

Letter GI2-82-101, D.M. Sternberg to R.G. Matlock, dated August 17, 1982, same subject.

This is to inform you that WNP-2 has initiated the necessary actions to re-open the following 10CFR50.55(e)'s:

  1. 22, Cable Routing Design Errors
  1. 37, Routing of Mainsteam Line Detector
  1. 43, Electrical Separation of RPS Scram
  1. 49, SGTS Dampers
  1. 50, Low Level Sensors (Wiring)
  1. 53, Separation Violations Within HPCS System
  1. 54, Separation Violations Within PGCC and Cable Spreading Room .
  1. 60, Class 1E Analog Instrument / Cable Not Identified as IE
  1. 64, PGCC Cable Routing and Termination Discrepancies
  1. 82, Installation / Documentation Interim reports on the above items will be provided by December 18, 1982. All subsequent reports will be provided on a quarterly basis until a final report is filed.

10CFR50.55(e) #40, Recirculation Nozzle Safe End Modification, is not connected with Electrical Separation, and as such, need not be reopened.

'B210070370 820923 PDR ADOCK 05000397

_S_ PDR _

<r i

C h

.o-e f

Mr. R. H. Engelken Page Two September 23, 1982 G02-82-803

^

t If there are any questions concerning this matter, contact Roger Johnson at (509) 377-2501, extension 2712.

l l

[

. . a lock i

. Program Director, WNP-2 .!

LCF/kd ,

r cc: W.S. Chin, BPA - Site A. Forrest, Burns and Roe - HAPO i N.D. Lewis, NRC J. Plunkett, NUS Corp. '

l R.E. Snaith, Burns and Roe - NY  !

-V. Stello, NRC i

, A. Toth, WNP-2 Resident NRC Inspector - 917Q F

'[

]

t

. - _ _ - _ - _ _ _ _ _ . . - _ - _ _ _ _ _