Framatome Richland Inspection Schedule for Caledar Year 2026
ML25177A141
Person / Time
Site: Framatome ANP Richland
Issue date: 06/26/2025
From: Eric Michel
NRC/RGN-II/DFRSS/FOB2
To: Stephens L
Framatome
References
Download: ML25177A141 (1)


Text

Mr. Lance Stephens Site Manager Framatome Inc.

2101 Horn Rapids Road Richland, WA 99354

SUBJECT:

FRAMATOME-RICHLAND - INSPECTION SCHEDULE FOR CALENDAR YEAR 2026

Dear Lance Stephens:

Enclosed is the schedule of inspections to be performed by the U.S. Nuclear Regulatory Commission (NRC) inspectors at the Framatome-Richland facility in calendar year 2026. The inspection schedule is provided in advance to minimize the resource impact on your staff and allow for the resolution of any scheduling conflicts and personnel availability issues, well in advance of inspector arrival onsite.

Please note that any regional initiative, reactive inspections, or additional inspections needed to support new processes or technologies are not included in the schedule and will be added as detailed schedule information becomes available. If circumstances arise which cause the NRC inspectors to change the dates of the planned inspections, we will contact you to discuss the change as early as possible. Please contact Cynthia Taylor (404) 997-4480 with any questions or concerns you may have regarding this letter or the inspection schedule.

This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html, and at the NRC Public Document Room, in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Eric C. Michel, Chief Fuels Oversight Branch 2 Division of Fuels, Radiological Safety, and Security Docket No. 07001257 License No. SNM-1227

Enclosure:

As stated cc w/ encl: Distribution via LISTSERV June 26, 2025 Signed by Michel, Eric on 06/26/25

ML25177A141 X

SUNSI Review X

Non-Sensitive

Sensitive X

Publicly Available

Non-Publicly Available OFFICE RII/DFRSS RII/DFRSS NAME T. Vukovinsky E. Michel DATE 6/26/2025 6/26/2025

Enclosure 2026 U.S. NUCLEAR REGULATORY COMMISSION INSPECTION/ACTIVITY PLAN FOR FRAMATOME-RICHLAND Dates Number of Inspectors Description/Inspection Procedures (IPs)

February 23 - 27 2

Operational Safety 1 (IP 88020)

May 11 - 15 3

Nuclear Criticality Safety 1 (IP 88015)

Radiation Protection (IP 88030)

August 24 - 28 4

Operational Safety 2 (3 Inspectors) (IP 88020)

Emergency Preparedness (IP 88050)

October 19 - 23 3

Nuclear Criticality Safety 2 (IP 88015)

Plant Modifications - Annual (2 Inspectors)

(IP 88070)