DCL-95-046, Submits Summary Description of Proposed Vehicle Control Measures Per 10CFR73.55.Encl Withheld

From kanterella
(Redirected from DCL-95-046)
Jump to navigation Jump to search
Submits Summary Description of Proposed Vehicle Control Measures Per 10CFR73.55.Encl Withheld
ML20080P745
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/28/1995
From: Rueger G
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
DCL-95-046, DCL-95-46, NUDOCS 9503080112
Download: ML20080P745 (1)


Text

___ _ _ ___--___

O O

Pacific Gas and Electric Company " Dm;:m wem N9 @ u  ; ~ ri 9 ; -

"wna a : 7 - , .e:m er uw #?% MindC5

' . , + y ;; 4 u ,~

='5:c na a n c mcwo C: -W >

February 28, 1995 n5 m m- '~

,: e - .)j PG&E Letter DCL-95-046 I U.S. Nuclear Regulatory Commission y ATTN: Document Control Desk [

Washington, D.C. 20555 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Re.sconse to 10 CFR 73.55. "Reouirements for Physical Protection of Licensed Activities in Nuclear Power Reactors Acainst Radiolooical Sabotaae" Gentlemen:

PG&E submits the enclosed summary description of the proposed vehicle control measures in accordance with 10 CFR 73.55(c)(9)(1). As required by 10 CFR 73.55(c)(8), PG&E has compared the vehicle control measures established in accordance with 10 CFR 73.55(c)(7) to the Commission's design goals and criteria for protection against a land vehicle bomb.

) PG&E confirms that the enclosed proposed vehicle control measures meet the design goals and criteria specified.

1 Regarding the requirement in 10 CFR 73.55(c)(9)(ii) to fully implement i the required vehicle control measures by February 29, 1996, PG&E notes that we intend to meet this completion date, with the possible exception of the active barrier to the southeast of Building 116 (the cold machine ..

shop). PG&E's Unit 2 seventh refueling outage is scheduled from March 16,1996, to May 2,1996, and work during this outage includes the movement of very large equipment. Should this work extend completion of the vehicle barrier system beyond the February E9 completion date (e.g.,

to the end of the Unit 2 seventh refueling outage), PG&E will notify the NRC in writing with the proposed completion date and interim compensatory actions. l Sincerely,

}

  • F l Gregory M. Rueger

{gg SA:EGUARDS N!0RMATl0E cc: L. J. Callan (2) When Separated frcm Enc:osures, Melanie A. Miller (w/o enc.) Handle this Document.as Decontroller Kenneth E. Perkins (w/o ent.) i Ronald G. Todaro Michael D. Tschiltz (w/o enc.)