Requests Exemption to 10CFR73.55 & Provides Draft Changes to Plant Physical Security Plan
ML20092H390
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/14/1995
From: Rueger G
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
DCL-95-199, NUDOCS 9509210011
Download: ML20092H390 (2)


Text

.?~

1 2 e . l ' ? .e Pacific Gas and Electric Company

~' : :-r p s: , w- 4-mm

? 4l4 ' y; '& ,

%.. - r .,

September 14,1395 PG&E Letter No. OCL-95-199 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Docket No. 5(.-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Reauest for Enemotion to 10 CFR 73 Gentlemen:

PG&E letter DCL 95-092, dated May 5,1995, requested an exemption to 10 CFR 73.55(d}i5) and provided a draft of proposed changes to the Diablo Canyon Power Plant's Physical Security Plan (PSP). PG&E letter DCL 95-161, dated July 28,1995, contained a revision to the draft submitted in May.

Enclosure 1 to this letter proposes a revision to clarify issues, which were identified on September 6 and 7,1995, during telephone conversations with the NRC staff. Enmosure 1 includes a description of the changes made as a result of the telephonc conversation.

Enclosure 2 to this letter are the changes made to the proposed draft submitted DG&E's letter DCL 95-161, July 28.1995.

Enclosure 3 is tne draft of the proposed changes to the PSP incorporating the changes identified in Enclosure 1 and 2. Changes are indicated by side bars in the left margin. Additions are indicated by bold type and deletions are indicated by strike through markings.

Enclosure 4 is a sketch of the proposed Security Building layout, once hand geometry is in place. It is not to scale.

Subsequent to approval of the requested exemption described in the Enclosure 2, PG&E will sLbmit a formal request for changes to the PSP in accordance with 10 CFR 50.54(p).

r ;r

' "' O+ SECURITY SAFEGUARDS INFORMATION

)'(/,hp"i When Separated From Enclosures Handle This Document As Decontrolled 3 9509210011 950914

____z_ PDR ADOCK 05000275

f .: ,.

.t ~

' U.S. Nuclear Regulatory Commission September .14,1995 Page 2 3

The hand geometry system is scheduled for implementation on or about September 22,1995,' PG&E requests approval of this exemption prior to Soptember 22,1995,

should you recuire further information or clarification, please contact Ron Todaro, Security Director, at (805) 545-4309.

Sincerely,-

<w p Gre; ory M. Rueger

. cc: Ronald G Todaro CCC/RMS s

Enclosures SECURITY SAFEGUARDS INFORMATION When Separated From Enclosures