Forwards Implementation Plan for Operation of Emergency Response Data Sys,Per Generic Ltr 89-15.Formal Testing of Sys W/Nrc Will Be Conducted in June 1992 & Sys Will Be Brought on-line by Dec 1992
ML20079L308
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/25/1991
From: Shiffer J
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
DCL-91-261, GL-89-15, NUDOCS 9111060205
Download: ML20079L308 (2)


Text

..

  • 17 h E!m, Pacific Gas and Elcctric cotepany um s D o >r

. ./ Ao te 9m s 9 , m n u, w, m n .vm cn. w cm

, 1M 91D L. W! ti i Ij-v: !b -p October 25, 1991 l PG&E Letter No. DCL-91-261 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk l

Washington, D.C. 20555 Re: Docket No. 50-275, OL-DPR-80

, Docket No. 50-323, OL-DPR-82  !

l Diablo Canyon Units 1 and 2  !

Emergency Response Data System Implementation Plan l Gentlemen:

i In accordance with- the requirement of Appendix E to 10 CFR 50, Section VI, item 4.a., enclosed is the implementation plan for operation l of the Emergency Response Data System (ERDS) at Diablo Canyon. The plan l l

supplements information previously transmitted to the NRC and its consultants as part of PG&E's voluntary participation in the ERDS I program.

_ Sincerely,

-y

/ mes D. Sh r

</

cc: Ann P. Hodgdon John 8. Martin Philip J. Morrill Harry Rood l Howard J. Wong L CPUC l Diablo Distribution

! Enclosure E 5533S/85K/JWB/2232 l

9111060205 911025 ca nuock0500g'g5 ffQ

, PG&E Letter No. DCL-91-261 I ,

5 ENCLOSURE EMERGENCY RESPONSE DATA SYSTEM IMPLEMENTATION PLAN Generic Letter (GL) 89-15 was issued by the NRC in August 1989 to encourage licensees to voluntarily install an Emergency Response Data System (ERDS).

The ERDS is capable of electronically transmitting selected plant parameters to the NRC during a site emergency.

PG&E responded to GL 89-15 in Letter No. DCL-89-290, dated November 20, 1989, and stated an interest to participate in the ERDS program on a volunteer  ;

basis. The NRC confirmed PG&E's participation in the program in a letter dated March 5,1990, which also transmitted survey information and Data Point Library Reference forms.  ;

PG&E is submitting the following implementation plan to supplement information (such as the completed NRC survey questionnaire) previously transmitted to the i NRC under the voluntary ERDS implementation program. The plan reflects j best-estimate dates and is sufficiently flexible to ensure complete  ;

implementation of the ERDS by the required date of February 13,_1993. )

1 ACTIONS ESTIMATED COMPLETION Develop / test transmission software Octobcr 1991 Compile data point library February 1992 Develop / approve-ERDS activation into plant emergency procedures March 1992

- Verify telephone line installation March 1992

-Conduct formal testing with NRC June 1992 Develop / approve administrative procedures to maintain ERDS October 1992 Develop / conduct ERDS training November 1992

. Develop ERDS software quality November 1992 assurance Complete ERDS implementation /

bring on-line December 1992 5533S/85K