consumers Power company
~guratory Docket File General Offices: 212 West Michigan Avenue,.Jackson, Michigan 49201
- Area Code 617 788-0660 September 8, l976 Director of Nuclear Reactor Regulation Att:
Mr Albert Schwencer, Chief Operating Reactor Branch No l US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255, LICENSE DPR-20 PALISADES PLANT SPENT FUEL POOL MODIFICATIONS Because of uncertainties in the availability of future fuel reprocessing facil-ities, Consumers Power Company plans to increase the storage capacity of the spent fuel pool at the Palisades Nuclear Generating Plant to prevent a shortage of spent fuel storage capacity.
As the plant has been operating since l972, the proposed method of accomplishing this increase is to install high density spent fuel storage racks of smaller center-to-center spacing between assemblies, utilizing neutron absorbing material to maintain the required shutdown margin.
The design concept and criteria for this proposed modification are attached.
The proposed schedule for installation of the high density storage racks is also discussed in the attachment.
As indicated, the installation would*be done in two phases.
The first phase is installation of the modified racks in the cask area and the unused, upper tilt mechanism pool (see sketch in the attachment) by Augusi 6, l977 which is the start of the next refueling shutdown.
The remain-der of the racks are to be installed as necessary to provide adequate storage and core unloading capacity.
To meet this schedule, NRC approval of the spent fuel pool modification is requested no later than January 31, l977.
We propose to submit a formal request for approval of the pool modifications, but to be sure that all NRC requirements are included, we request a meeting with appropriate members of the NRC staff on or about September 16, 1976 to discuss these requirements and the attached design concept and criteria.
The formal submittal, which will include a safety analysis and environmental impact evalua-tion, will be submitted on or before November l, l976.
We trust that a meeting can be arranged and appreciate your prompt consideration of our request.
<&-~¥ David A. Bixel Assistant Nuclear Licensing Administrator CC:
JGKeppler, USNRC 9231
PALISADES NUCLEAR GENERATING PLANT SPENT FUEL POOL MODIFICATION PLAN The present spent fuel storage design capacity for Palisades is 272 fuel assem-blies or one and one-third cores.
The present fuel racks are stainless steel with a stored assembly center-to-center spacing of 11-1/4 inches.
There are two 1/4 inch stainless steel plates between each pair of bundles throughout the active length of the fuel bundles to maintain the required subcriticality.
The planned modification discussed below will increase this capacity to over 800 fuel assemblies.
- 1.
High Density Spent Fuel Storage Rack - Concept and Design The proposed high density racks will utilize neutron absorbing material (poison) to reduce the center-to-center spacing of the locations to 10-1/4 inches.
The design incorporates Boron Carbide (B4c) neutron absorber plates to ensure subcriticality.
Each individual fuel assembly is sur-rounded by an absorber plate on all four sides with a water gap between adjacent locations.
The individual assembly locations consist of concen-tric stainless steel square tubes with the cavity between, occupied by B4c plates.
The concentric tubes are seal welded, top and bottom.
The tubes are grouped and welded to a base structure to form storage racks.
The base structure has openings to receive the fuel assembly and allow sufficient flow through the stored assembly to ensure adequate heat removal.,The racks are welded into modules of various sizes to maximize use of the available pool space.
This conceptual rack design is similar to the high density spent fuel storage rack design which was recently approved fo! use in the Connecticut Yankee spent fuel storage pool modification.
To brace the racks, seismic restraints at the upper and lower ends of the rack modules are proposed.
The spent fuel pool cooling system will be analyzed and modified as necessary to be adequate for the increased fuel storage capacity.
2.. Storage Rack Design Criteria The codes, standards and other criteria to be used for the nuclear, struc-tural, and cooling system design and analyses of the high density storage racks are based on the appropriate NRC General Design Criteria (App A 10 CFR-50).
They include:
- a.
Regulatory Guide 1.13, Fuel Storage Facility Design Basis (Safety Guide 13, 3/10/71).
- b.
Regulatory Guide 1.25, Assumptions Used for Evaluating the Potential Radiological Consequences of a Fuel Handling Accident in the Fuel Hand-ling and Storage Facility for Boiling and Pressurized Water Reactors (Safety Guide 25, 3/23/72)
- 2
- c.
.ANSI Nl6.1-1969, Nuclear Criticality Safety in Operations with Fission-able Materials Outside Reactors.
- d.
.ANSI Nl8.2-1973, Nuclear Safety Criteria for the Design of Stationary Pressurized Water Reactor Plants.
The rack will be designed such that the maximum effective multiplication factor (keff) will be no greater than 0.95 with the racks fully loaded with fuel of the highest level of enrichment expected, pool water at the most reactive temperature, no dissolved neutron absorber in the water, and con-sidering all tolerances and uncertainties in calculation, under normal wet and accident conditions.
The racks will be designed to seismic category I in accordance with Regula-tory Guide 1.29, Revision 1 of August 1973, using the seismic accelerations and response spectra used in the original design of the spent fuel storage facility.
Rack loading will be analyzed following the recommendations of Standard Review Plan 3.8.,4.
The racks will be designed in accordance with AISC Specification for Design, Fabrication and Erection of Structural Steel Buildings, February 1969, with supplements through Supplement No 3 of June 12, 1974.
The spent fuel pool cooling system capacity will be analyzed by considering refueling discharges from the first discharge until the spent fuel pool is fully loaded.
The two cases to be analyzed are the normal case of regUlar spent fuel discharges to the pool and the limiting case of a full core off-load to the pool at a time that will produce the maximum heat generation rate in the pool.
The capacity of the cooling system will be evaluated considering a single active failure and modifications made, if necessary, to the system so that pool cooling can be maintained even with the most severe single active fail-ure.
- 3.
High Density Storage Rack Schedule In order to reestablish the capability of fully unloading the core at the next refueling, the following schedule is proposed:
Conceptual Design Submitted to NRC Discussions With NRC and Preliminary Concept Approval Received Formal Application to NRC for Spent Fuel Storage Modification Approval NRC Approval Received Fabrication and Delivery of the New Racks Rack Installation:
Phase 1 -
Cask Area and Spare Tilt Mechanism Pool (See Attached Figure 1)
Phase 2 - Remainder of Spent Fuel Pool September 8, 1976 September 16, 1976 November 1, 1976 January 31, 1977 February 1, 1977 -
December 1, 1977 August 1, 1977 Commencing December 1, 1977
too 5PACE RACK
-?PARE. T~L'T ME.CHA.~\\?M POOL
---~;.ot--*""""...................,,._
.. _,,,. __......... ~.. -
...,_.... ~.... ---~
SPACE"::>m
... _llfll'l..............,.... __, ___,.."'l,,_,.,,,_l!I..... '""""'--"""' ""'""""----*1-RAC~<'!> IN5T;e,U.. ED i 8/ 1.h~ { ~~~~:K PA~iA
- b;
- ..,,._,._._..,.,..._.,._,.._. ___ u...._.,,..,,,.~.,,-,,.-,, *
..,....,..,,..,.,.,...._.,.,,,,.,_.,.....,.,,.,......._.,.,....,..,~.,o.,...,.,"","-l~MO***""""'.......
1-"'**-*-,--llHll**ll'.-*
RACK':; !NSTALLE.D AFTER. !'2. I 1 /71 594
. *~ *FlNAL CAP.i~CITY OF POOL 809 II l"O~"Ol><~****"'~--~-"',..,. ____
Joo....,_.., __
- T~~1ATIV£ ~-~ 1fll JEC1" TO Flt-..tA l DE5 IG N Yt::R IFICATtON FIGU~~E. l 14'8 I I NS.ICE POOL CONSUME.RS POWER CO.- PAL\\SADES PLANT FUEL STORA<::£ ~1100! FiC/\\iiON PROP(Y;;ED t='UEL POOL ARRANGEMENi