U.S. Nuclear Regulatory Commission Real Property Efficiency Plan Federal Property Management Reform Act of 2016 Implementation FY 2020 - FY 2024 September 2019
Contents INTRODUCTION....................................................................................................................... 3 ROLES AND RESPONSIBILITIES OF SENIOR OFFICIALS..................................................... 4 BUDGET ASSUMPTIONS AND IMPACT TO REDUCTION TARGETS..................................... 5 REDUCTION TARGETS............................................................................................................ 7 Domestic Office and Warehouse Square Foot Reduction Targets FY 2020-FY 2024................ 8 Disposal Targets for Owned Buildings FY 2020-FY 2024.......................................................... 8 Maximum Square Feet per Workstation................................................................................... 11 Nuclear Regulatory Commission Administrative Office Utilization Rates.................................. 12 GSA CONSOLIDATION PROGRAM....................................................................................... 12 OPERATIONAL EFFICIENCIES.............................................................................................. 12 COMPLIANCE INTERNAL CONTROLS.................................................................................. 12 FEDERAL REAL PROPERTY PROFILE (FRPP) DATA QUALITY IMPROVEMENT............... 13 CHALLENGES AND IMPROVEMENT OPPORTUNITIES....................................................... 13
3 INTRODUCTION The U.S. Nuclear Regulatory Commission (NRC) is an independent agency created by Congress.
Its mission is to license and regulate the Nations civilian use of radioactive materials to protect public health and safety, promote the common defense and security, and protect the environment.
Specifically, the NRC regulates commercial nuclear power plants; research, test, and training reactors; nuclear fuel cycle facilities; and the use of radioactive materials in medical, academic, and industrial settings. The agency also regulates the transport, storage, and disposal of radioactive materials and waste and licenses the export and import of radioactive materials.
Successfully accomplishing the NRCs mission requires substantial ongoing collaboration among NRC staff and across NRC offices. This collaboration among multiple technical experts and others is critical to resolving regulatory issues and fully addressing nuclear safety and security concerns.
The NRC relies on staff collaboration for applying lessons learned from prior nuclear incidents, understanding the breadth and nuances of a technical issue, and transferring technical knowledge to junior NRC staff on how to apply information appropriately and how-to problem solve within the NRCs regulatory framework. Collaboration and unified problem solving enhances the quality of the NRCs response and organizational effectiveness. Co-location of NRC headquarters staff is vital for purposes of achieving operational efficiency, regulatory effectiveness, and incident response capability. Providing consolidated agency facilities is key to supporting the NRC mission.
NRC s revised FY 2020 - FY 2024 plan is to release a total of approximately 231K USF of office and warehouse space (including FY 2019 reductions), which is 90K USF above the targeted reductions reported in previous Real Property Efficiency Plans. A summary of the agencys real property portfolio as of the end of fiscal year (FY) 2018 is shown below. The NRC does not directly lease or own any space; its entire 1,079,543 usable square feet (USF) office and industrial portfolio is provided by occupancy agreements (OAs) with the U.S. General Services Administration (GSA).
FY 2018 Portfolio Summary per Federal Real Property Portfolio (FRPP) Submittal (All office and warehouse property only (not including the Technical Training Center) including the Reduce the Footprint (RTF) baseline properties)
Direct Lease Space Owned Space OA Space USF None None 1,079,543 The NRCs office and warehouse portfolio in FY 2019 (approximately 1,031,500 USF) reflects a reduction of approximately 48K USF from the agencys FY 2015 Reduce the Footprint (RTF) baseline of 1,079,543 USF. These reductions represent a 4.4 percent reduction to the size of portfolio. In accordance with the reduction schedule, NRC released over 25.5K USF to the Food and Drug Administration (FDA) in Three White Flint North (3WFN) on October 1, 2018 and released an additional 22.5K USF in 3WFN in May 2019, which was subsequently backfilled by the National Institutes of Healths (NIH). The construction for the Region III reductions (previously scheduled to be complete in FY 2019) was delayed, the current schedule is to release the 7K USF in October 2019.
NRC s revised FY 2020 - FY 2024 plan is to release a total of approximately 231K USF of office and warehouse space (including FY 2019 reductions), at its Rockville, MD, headquarters and four regional office locations, reducing the portfolio to approximately 848K USF (78.5 percent of the FY 2015 RTF baseline). The total square footage of the planned reductions is 90K USF above the targeted reductions reported in previous Real Property Efficiency Plans due to an increase of planned releases in headquarter office space (additional 45K USF), headquarter warehouse space (newly planned release of 20K USF), and regional office space (additional 25K USF). The total annual savings for the planned release of the 231K USF by the end of FY 2022 is anticipated to be
$8.3M in rent savings and $0.9M in security savings as compared to FY 2015 baseline rents.
4 The increase in the amount of space to be released at headquarters as compared to previous plans stems from the decision to release an additional 15K USF at 3WFN (consisting of a half floor and the lobby level conference center in FY 2020 and FY 2021 respectively), an additional 30K USF by releasing one floor of the Two White Flint North (TWFN) building in FY 2021, and the newly planned release of 20K USF of warehouse space in FY 2020. The total amount of square footage released at headquarters will be 128K USF consisting of 108K USF of office and 20K of warehouse space.
The amount of square footage to be relinquished in the regions increased due to a change in the space reduction strategy for the Region I location in King of Prussia, PA, and the Region IV location in Arlington, TX. Region Is planned release of space increased from 15,000 USF to a total of 30,000 USF due to the recent decision to exercise termination rights in the lease, effective April 2022, and procure space via a new GSA lease to be built out in a more efficient open space floor plan (as opposed to the current build out that consists of mostly enclosed offices). NRC is currently evaluating the feasibility of implementing similar plans in the remaining regions, based on the availability of funding, and expects the amount of space to be released in other regions to increase in subsequent plans. Region IV increased their reduction plans by 10K USF from a half floor (11K USF) to a whole floor (21K USF).
The timing of the reductions at the regions is governed by the lengths and non-cancelable terms of the leases GSA has in place. This is particularly true of the planned reductions in NRCs Region II location in Atlanta, GA. The agency anticipates vacating a full floor consisting of 15K USF by the end of FY 2019, however the space will officially remain in NRCs portfolio and the agency will not realize rent savings unless GSA can place a backfill into the space prior to the termination rights in the lease effective in November 2022. Therefore, NRC has moved this square footage from its FY 2020 planned reductions to FY 2023. NRC is in the process of coordinating with GSA regarding the placement of a backfill, however no tenants have agreed to backfill the space to date ROLES AND RESPONSIBILITIES OF SENIOR OFFICIALS The role of the Senior Real Property Officer (SRPO) for the agency has been delegated to the Director of the Office of Administration (ADM). As the SRPO, the Director of ADM serves as asset manager for the entire agency, with review and approval authority of all space disposal and acquisition projects. All requests for space are centrally reviewed at headquarters by the Senior Space Acquisition Manager (SSAM) in the Division of Facilities and Security (DFS) in ADM.
The Chief Financial Officer (CFO) is responsible for the NRC's planning, budgeting, and performance management process and for all of the NRC's financial management activities. The CFO provides Amount of Space Reduction and Estimated Savings by Fiscal Year and Location Location Space Reductions (in thousands)
FY 2019 Space Reductions (in thousands)
FY 2020 Space Reductions (in thousands)
FY 2021 Space Reductions (in thousands)
FY 2022 Space Reductions (in thousands)
FY 2023 Space Reductions (in thousands)
FY 2024 Estimated Annual Savings in Millions 3WFN (HQ) 48 55 5
$4.5 TWFN (HQ) 30
$1.0 Warehouse (HQ 20
$0.4 Region 1 30
$1.2 Region 2 15
$0.3 Region 3 7
$0.3 Region 4 21
$0.6 Total 48 82 56 30 15
$8.3
5 an agency wide management control program to comply with the Federal Managers' Financial Integrity Act and is responsible for implementing the Chief Financial Officers Act.
The Office of the CFO (OCFO) leads the agency budget formulation process and provides oversight of the agency budget structure.
The Executive Director for Operations (EDO) determines the planning, workload, and resource requirements to be reflected in the budget. The Deputy Executive Director for Materials, Waste, Research, State, Tribal, Compliance, Administration, and Human Capital Programs and the Deputy Executive Director for Reactor and Preparedness Programs provide offices with direction, as needed, including workload expectations, to ensure that the budget aligns with the Commissions direction.
ADM reviews the agencys real property portfolio, determines any new requirements for space modifications, acquisitions, and disposals, and, in coordination with OCFO, formulates the proposed agency budget for real property and its components (e.g., repair, maintenance, consolidation, disposal, new construction) for submission to OEDO. As part of the normal budget development process, the EDO and CFO meet to discuss the budget submission, which includes the annual real property budget. OCFO works with ADM to adjust the budget request based on decisions made by the EDO and develops the budget proposal for submission to the Chairman. The Chairman then submits the budget proposal to the Commission. OCFO finalizes and submits the performance budget to the Office of Management and Budget (OMB) once approved by the Commission.
BUDGET ASSUMPTIONS AND IMPACT TO REDUCTION TARGETS The NRC formulates its annual budget 2 years in advance. The FY 2020 budget as well as the second and third fiscal years covered by this plan (FY 2021 and FY 2022) are informed by the Agency Reform Plan. As directed by OMB in memorandum, M-17-22, Comprehensive Plan for Reforming the Federal Government and Reducing the Federal Civilian Workforce, the NRCs Agency Reform Plan identifies proposed areas for reform to improve agency efficiency, effectiveness, and accountability in four categories: eliminate activities, restructure and merge activities, improve organizational efficiency and effectiveness, and workforce management to improve performance, increase accountability, and reduce costs. The office and warehouse space reduction targets identified in this RTF plan are designed to be consistent with historic real property funding levels and the NRC FY 2020 proposed annual budget.
PORTFOLIO STATUS Overall Agency Building Portfolio The NRC does not directly lease or own any space; its entire portfolio is provided by OAs with GSA. In the beginning of FY 2019, its building portfolio consisted of a total of 1,033,171 USF of office space, 46,372 USF of warehouse space, and 54,525 USF of other space at the technical training center.
FY 2018 Portfolio Summary per FRPP Submittal (All property, including the RTF baseline properties)
Direct Lease Space Owned Space OA Space (USF)
Office None None 1,033,171 Warehouse None None 46,372 All Other None None 54,525 Total None None 1,134,068
6 The NRCs real property portfolio currently consists of space in nine buildings, located in six geographic areas around the country. At the end of FY 2019, the FY 2015 RTF office and warehouse baseline of 1,079,543 USF and total GSA OA portfolio of 1,134,068 USF was reduced by 48,000 USF to approximately 1,031,543 USF and 1,086,068 USF respectively.
Accomplishment of the NRCs mission depends on collaboration among NRC technical experts and regulators and is critical to resolving regulatory issues and fully addressing nuclear safety and security concerns. The NRC staff relies on close collaboration for applying lessons learned from prior nuclear incidents, understanding the breadth and nuances of technical issues, and transferring technical knowledge within the NRCs regulatory framework to others. Collaboration and a multidisciplinary approach to problem solving enhance the quality of the NRCs organizational and operational effectiveness.
The agency has not confronted any major challenges in establishing the FY 2020-FY 2024 reduction targets however except for situations beyond the agencys control in terms of construction schedules and potential delays.
Status Relative to the Reduce the Footprint Baseline Requirement Throughout FY 2019, NRCs total GSA OA portfolio of 1,134,068 USF, and FY 2015 RTF baseline of 1,079,543 USF was reduced by 48,000 USF to approximately 1,086,068 SF and 1,031,543 USF respectively. In FY 2015, the agency relinquished over 155,000 USF of office and related space from its headquarters location in Rockville, Maryland and NRC plans to relinquish approximately 231,000 USF of office and warehouse space at headquarters and four regional office locations from FY 2019 through FY 2024. Therefore, since FY 2015, NRC will have released a total of 386K USF of space from its office and warehouse portfolio by FY 2024.
The agency expects to achieve further reductions of space by developing an effective program to release office space and consolidating staff at headquarters. This effort requires extensive planning and coordination to minimize disruption, minimize the number of staff moves, and maintain mission effectiveness during consolidation. The agency will respond to challenges and opportunities presented with effective planning and project execution, widespread use of standardized workstation sizes.
Maintenance of the Reduce the Footprint Baseline In accordance with the RTF guidance, the NRC identified excess office space within the portfolio, and has attempted to right-size the portfolio consistent with the number of onsite personnel to be housed. The NRCs recent Real Property Savings Plan called for consolidating operations at its headquarters at the White Flint Campus (WFC) in Rockville, MD. During FY 2013 through FY 2015, the NRC reconfigured headquarters space, and consolidated operations to implement the plan. By the end of FY 2015, the NRC reduced its real property footprint to the current RTF baseline of 1,079,534 USF. A Long-Term Housing Strategy (LTHS) completed in FY 2015 and updated annually, identified the opportunity to relinquish additional space at the WFC. As a result, the agency is planning to release a total of approximately 231K USF of office and warehouse space from FY 2019 through FY 2024 at its Rockville, MD, headquarters and four regional office locations reducing the portfolio to 78.5 percent of the FY 2015 RTF baseline.
In FY 2019, the agency began working with GSA to further update NRCs housing strategy to determine the optimal space plan layout and over-all space utilization strategy to support NRCs mission. The design for future renovations and build-out will incorporate more mobility options and technology into future alterations to improve space utilization and lower overall utilization rates.
Therefore, it is likely the amount of space the agency plans to release will continue to increase from FY 2020 and beyond.
7 The NRC will also make corresponding space reductions, as necessary, to address decreases in staffing. The agency plans to work with GSA to renovate, reconfigure, and release additional space for backfill by other Federal agencies at its headquarters and regional office locations. An example of this is NRCs intent to release approximately 20K USF in their headquarters warehouse location in FY 2020 and the increased release of space at headquarters, both of which will be backfilled by NIH.
In addition, the agency is exploring the feasibility of releasing additional warehouse space and anticipates removing the mailroom facility, by utilizing a shared service provider agreement with another agency. Implementing reductions at regional locations sooner than currently scheduled may be challenging given the terms and lengths of the leases GSA has in place.
The NRC will continue to reduce the space portfolio without reducing operational effectiveness and workforce productivity by focusing on more efficient workstations and support space configurations, collaborative work area adjacencies, and the enhancement of information technology applications if necessary to evaluate the feasibility and practical application of alternative solutions such as telework and desk sharing.
REDUCTION TARGETS Reduction Targets for Office and Warehouse Space The NRC is headquartered in Rockville, MD, and has four regional offices and a technical training center located in King of Prussia, PA; Atlanta, GA; Lisle, IL; Arlington, TX; and Chattanooga, TN, respectively. The agencys entire space portfolio is provided through OAs with GSA, consisting of approximately 76 percent leased space and 24 percent federally owned space. The agency currently resides in nine buildings in six locations-three office buildings and a warehouse at headquarters, four regional office building locations, and a technical training center. The relatively small size of the agencys portfolio gives staff the ability to centralize the management of space facilitating the ability to identify opportunities to use the space more quickly and efficiently.
The NRC and the GSA developed a LTHS for the agency in FY 2015, in conjunction with the acquisition of a replacement lease for the Two White Flint North (TWFN) building that is part of the agencys Rockville, MD, headquarters campus. This effort provided the means and opportunity to evaluate existing NRC space in all three headquarters office buildings and create synergy in how space could be used effectively; how mobility, technology, and phased restacking and reconfiguration options could be implemented; and how the NRC might better consolidate and co-locate organizations. More recently, the agency began working with GSA to further update NRCs housing strategy to re-evaluate the design and layout to determine the optimal space plan layout and over-all space utilization strategy to support NRCs mission. Regional office space and technology requirements are included in the strategy and plan. NRC will continue to work with GSA to identify space disposal and backfill opportunities while addressing limitations of lease terms and cancelability.
The NRC does not own or directly lease office or warehouse space and, therefore, has no disposal projects. Given the relatively small and size of the agencys office portfolio and stable size regarding the number of locations, consolidations will be limited to portions of the three buildings located at the WFC and within individual assets in the regions by reconfiguring space, relinquishing portions of individual buildings, or procuring new, small spaces, utilizing a more open space build-out. When evaluating opportunities to reduce space, the NRCs first priority and consideration is to assess and weigh the agencys continued ability to perform mission-essential functions, without interruption, within the space allotted. After assurance that the agency will be able to continue to perform its primary mission, factors used to evaluate consolidation targets are the utilization ratio of office space to personnel, lease expirations, lease rates, and the results of cost-benefit analyses.
8 Proposed agency-wide total space reduction targets are shown in the table below. NRC only has one warehouse; it is not required to submit warehouse space reduction targets under the RTF policy, however the agency has recognized the opportunity to reduce the current warehouse by half and intends to release approximately 20K USF of warehouse space in FY 2020 and is evaluating options to reduce that space further.
Domestic Office and Warehouse Square Foot Reduction Targets FY 2020-FY 2024 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 Office Target*
(Net SF Reduction) 67,000 51,000 30,000 15,000 0
Warehouse Targets (Net SF Reduction) 20,000 0
0 0
0
- Reductions are reported as a positive value.
Included in the above chart for FY 2023, is 15K USF from NRCs Region II location in Atlanta, GA.
NRC is vacating a floor at this location to release in FY 2020, however both the Occupancy Agreement and lease for this space in non-cancelable until November 2022, therefore the space will remain in NRCs inventory until FY 2023 unless GSA is able to place a backfill tenant into the space prior to that time. NRC is also in the process of working with GSA to determine the feasibility of renovating the Region II space floor by floor (beginning with the current vacant floor) to a more efficient open space layout (to be informed by the recent workplace design updates) to facilitate releasing a larger block of space in FY 2023.
NRC continually evaluates the real property portfolio for opportunities to reduce space. The possibility exists that the magnitude of reductions in both the headquarters and regional locations will increase in FY 2021 and beyond. Converting space an open, more efficient buildout, is expected to enable more substantive reductions and savings, however to do so will require significant upfront investments and the timing is contingent upon the respective OAs and lease agreements. The agency is also examining the space needs at headquarters after the release of space in 3WFN to determine the amount and timing of further reductions at the WFC after the release of a floor in the TWFN building in FY 2021.
Disposal Targets Owned Buildings The NRC has no disposal targets for owned buildings. The agency does not own any real property; its entire real property portfolio is provided through OAs with GSA.
Disposal Targets for Owned Buildings FY 2020-FY 2024 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 Disposal Target (Net Square USF Reduction)
N/A N/A N/A N/A N/A Disposal Target (Number of buildings)
N/A N/A N/A N/A N/A Performance Benchmarks Using the Federal Real Property Profile (FRPP) Real Property Management Tool (RPMT) the NRC uses real estate metrics such as portfolio size as a percentage of the FY 2015 RTF baseline, proposed reductions for the RTF objectives, OA rent per square foot, and square feet per person to identify and prioritize consolidation projects. The RPMT dashboards and spreadsheets provide the
9 NRC the ability to view the portfolio data in the context of the RTF real property savings plan and overall space reduction strategy. Using the rent per square foot metric, the agency targeted the release of space in the highest cost-per-square-foot properties in the portfolio as identified by the RPMT. This led to the determination that approximately 108,000 USF of the NRC space in the highest rent-per-square-foot property in the portfolio (3WFN) could be released in FY 2019 and FY 2020. Using the portfolio size as a percentage of the RTF baseline and the square-feet-per-person metrics, the agency identified reductions that will significantly reduce the portfolio as a percentage of the RTF baseline.
The NRCs consolidation plans are known to GSA, and the NRC has worked closely with GSA to find backfill opportunities for leases and OAs. The pursuit of backfill tenants resulted in the successful backfill of FDA and NIH to backfill the remaining three and a half floors as they become available in the FY 2019 through FY 2020 timeframe. Therefore, NRC realized rent savings in FY 2019 upon FDAs backfill to the 2nd floor of 3WFN, with similar savings realized in May 2019 and again by early FY 2020 as NIH begins to backfill the remaining two and a half floors. The remaining facilities in 3WFN would include the NRC data center and NRCs Headquarters Operations Center, which serves as the focal point for the agency Primary Mission Essential Function of event response for incidents involving a commercial nuclear power plant, research or test reactor, fuel cycle facility, or nuclear materials licensee.
Given the recent reductions in staff, the NRC is also exploring opportunities to accelerate the timing and amount of space to be relinquished in its regional offices. These reductions can be achieved by re-stacking the existing space, thereby allowing for demisable blocks of space to be released.
Realizing cost savings by releasing the space will be a challenge due to the non-cancelable terms of the leases therefore the possibility exists that certain regions may not release space until termination rights become actionable. Lease expirations and terms for the regional offices and square footage of the reductions are as follows:
Planned Regional Reductions Reported Reductions Per 2020 Real Property Efficiency Plan Useable Square Footage to be Released Fiscal Year of the Space Release Occupancy Agreement Cancelability Date Occupancy Agreement and Lease Termination Date Region III 7,000 FY 2020 Cancelable Now June-23 Region II 15,688 FY 2023 November-22 November-24 Region IV 21,000 FY 2021 April-21 April-26 Region I 30,000 FY 2022 April-22 April-27 NOTE: The NRC will require continued support from GSA to backfill space identified in the regional office locations as targets for future space reductions. Several of these locations currently have non-cancelable OAs and lease agreements. It is the NRCs expectation that early involvement with GSAs leasing and disposal divisions will yield opportunities to find suitable backfill or sublease tenants when needed. Well in advance of lease expirations, the agency will work with GSA to review and validate space requirements, identify opportunities for space reductions based on requirements and staffing changes, and work closely with GSA to ensure timely backfill of any released space. Given the agencys mission requirements, the NRC does not foresee any opportunities to reduce the number of locations in the near term. In support of NRCs mission, GSA has recently signed succeeding leases on NRCs behalf for TWFN (15-year lease commencing in December 2018 consisting of 295,734 USF) and NRCs Technical Training Center (20-year lease commencing in December 2016 consisting of 54,525 USF) and a renewed OA for OWFN (consisting of 275,369 USF) for 10 years commencing in March 2018. Therefore, the strategy to reduce space will consist of reducing the footprint in existing locations and buildings.
10 Benchmark Metric Summary for the Nuclear Regulatory Commission (includes Headquarters and Regions) using USF and Personnel Counts from September 30, 2018 as provided by GSA.
In FY 2020 after the near-term release of space in 3WFN and the regional locations NRC anticipates its all-in utilization rate for the WFC to be approximately 235 USF and a total all-in agency utilization rate of approximately 260 USF.
Rent and O&M Benchmark Metrics Agency Metric Units FY2013 FY2018
% Change
((FY13 -
FY18)/FY18)
Government-wide Average NRC Rent per SF GSA OA Warehouse $/SqFt 16.07 10.87 NRC Rent per SF GSA OA Office
$/SqFt 31.75 27.60
-13.09 28.01 Personnel Benchmark Metrics Agency Metric Units FY2015 FY2018
% Change
((FY15 -
FY18)/FY18)
Government-wide Average NRC SF per person GSA OA Office SqFt/Pers 249.56 320.31 28.35 252.7 Tenant Satisfaction Metrics Agency Metric Units FY2018 Government-wide Average NRC TSS Overall Sat Score for Occupany Agreements 67.15 60.78
11 Space Design Standard for Future Reductions In 2016, during the design phase for the renovation of TWFN, the agency revised the space design standards by reducing the size of enclosed offices for office directors, division directors, deputy division directors and branch chiefs as illustrated below. The agency is currently exploring and researching with GSA to create a more efficient space design of the future to include mobility options, therefore the square footages below are subject to be revised in the short term.
Maximum Square Feet per Workstation Enclosed Square Feet Office Director 240 Deputy Office Director 240 Associate Director 150 Division Director 150 Deputy Division Director 150 Deputy Associate Director 150 Branch Chief 120 Administrative Law Judge 120 SLS (interior) & Team Lead 100 Open Senior Staff (GG 15) 80 Professional Staff (GG 13 - 15) 80 Professional Staff (GG 12 and below) 80 Secretarial 80 Contractor 40 Per the RTF guidelines, and the agency LTHS, NRC incorporates a goal of a 200 USF per person all-in office utilization rate for the NRC staff and contractors housed at the WFC calculated by dividing the total USF, without dispensation for special use space, by the number of office-based personnel assigned to each location. The utilization rates for NRCs four regional locations is higher than that of the WFC due to the fact that the tenant build out in the regions incorporates a space plan design consisting primarily of enclosed offices. To mitigate this in the near term the agency intends to reduce space by consolidating in place in each region and will explore the feasibility and cost benefits analysis of changing to a more open space plan for its regional locations as the current leases expire in the FY 2023 - FY 2027 timeframe. The NRC expects a decrease in personnel for the FY 2019 Federal Real Property Council data reporting period which will have a corresponding effect on the agencys utilization rate until additional space is relinquished. The all-in utilization rates are monitored bi-weekly and reported monthly in the agencys computer-based space planning and management system.
Another way to benchmark space utilization is a calculation referred to as the administrative utilization rate, which removes special use space from the equation. The administrative utilization rate is calculated by subtracting the amount of special use space (i.e. auditoriums, cafeterias, incident response centers, data centers) from the USF before dividing by the number of personnel. GSA has requested each agency to calculate and report on administrative utilization rates for headquarters and field office locations.
12 The administrative utilization rate is illustrated in the chart below using the personnel counts as reported in the September 2018 Federal Real Property Profile (FRPP) data call.
Nuclear Regulatory Commission Administrative Office Utilization Rates Headquarters/Regions Administrative Office UR Headquarters/WFC 209 USF NRC Regions (Combined) 380 USF NRC Total Portfolio (WFC and Regions Combined) 240 USF After the relinquishment of space in 3WFN, the agency estimates the administrative utilization rate for the WFC to be approximately 200 USF.
GSA CONSOLIDATION PROGRAM NRCs largest planned space reduction is to release four and a half additional floors and the first-floor conference center in 3WFN (a total reduction of approximately 108,000 USF) in the FY 2019-FY 2021 timeframe by consolidating staff in the remainder of the WFC (represents an increase of 15K USF from previous plans). The agency did not request GSA consolidation funds for this project.
NRC and GSA aggressively pursued backfill tenants for the space resulting in FDA signing an OA to occupy one of the four floors and NIH signing an occupancy agreement for the three and a half remaining floors. NRC and GSA will market the 5,000 USF to both FDA and NIH to release that space in FY 2021. NRC will research and evaluate whether its Regional location reductions are eligible and appropriate to request GSA consolidation funding.
OPERATIONAL EFFICIENCIES Per the terms and funding available in the succeeding lease for TWFN, NRC recently completed the renovations of 7 floors within the building. The renovations increased the density on each floor as well as the potential to utilize mobile workspace concepts in the future. The TWFN renovations enable the NRC to release approximately 108,000 USF in 3WFN as renovated space in TWFN was used to relocate the occupants on the effected floors in 3WFN. The project was complete in late FY 2019 and NRC estimates that the administrative utilization rate for the WFC is approximately 200 USF per occupant. This number is higher than previous estimates due to a reduction in staff.
COMPLIANCE INTERNAL CONTROLS Control of Acquisition of New Owned and Leased Assets at the Agency Level The role of the SRPO for the agency has been delegated to the Director of ADM. All requests for space are centrally reviewed at headquarters by the SSAM in ADM/DFS. The SRPO reviews and approves all acquisitions and disposals of office and warehouse space.
The SSAM maintains a detailed inventory of space in a summary that is updated monthly and covers all NRC real property occupancies. The space summary displays square footage assignments, rent and related costs, locations, lease start and end dates, and notations on increases and decreases by building.
Under NRC MD 13.2, Facility Management, approved September 29, 2017, the ADM Director is the designated representative for the authorities delegated from GSA to the NRC and other activities related to facilities management, including the approval of assignment of all space for headquarters,
13 the regional offices, and the technical training center (TTC) in Chattanooga, TN. The SRPO also establishes office space standards that are used to determine space allocation for headquarters, regional offices, TTC, and contractors. Documentation of real property occupancies are contained in OAs with GSA.
All requests involving new leases, dispositions, acquisitions, expansions, or other changes in the agencys office and warehouse space portfolio are reviewed initially by the SSAM to ensure compliance with RTF principles and guidance before recommending approval or disapproval to the SRPO. These reviews are reinforced by the NRCs reliance on GSA-issued NRC OAs, the NRCs monthly review of GSA rent bills, and SSAM review of the NRCs weekly updates of office space occupancy rates.
FEDERAL REAL PROPERTY PROFILE (FRPP) DATA QUALITY IMPROVEMENT The NRC will use the FRPPs RPMT and established data validation tools to fully implement GSAs FRPP data validation and verification guidance regarding the identification and reconciliation of data anomalies in the agencys annual FRPP data submission for the FY 2019 reporting cycle. Data anomalies will be reconciled using the NRCs data verification procedures to check accuracy and reliability of data before reporting the FY 2019 FRPP data. The NRCs space portfolio is relatively small compared to other executive agencies in terms of number of assets and total square footage.
The NRCs real property portfolio currently consists of space in nine buildings, located in six geographic areas around the country, allowing intimate familiarity with the data in a user-friendly asset management system, which corresponds to a high level of confidence in the datas accuracy and reliability.
To verify and validate the reliability, accuracy, and completeness of space portfolio data, the SSAM and space management team cross-references data sets such as the annual FRPP data, the NRC's automated space planning and management system data, and individual OAs issued by GSA.
Periodic reviews and exception processing will be conducted by the SSAM and support contractors while updating utilization metrics and reviewing and approving the rent bill on a monthly basis.
Underlying anomalies will be identified quickly and addressed. In addition, the SSAM and the space management team will coordinate semi-annually and as needed throughout the year with the following:
The Office of Chief Human Capital Officer and the Office of Chief Information Officer staff to review employee data and reconcile discrepancies between on-board, vacant, and authorized positions, active network accounts, and weekly staffing count and workstation occupancy data; and, The Acquisition Management Division to review onsite contractor staffing data and reconcile discrepancies between authorized positions, active network accounts, and weekly staffing count and workstation occupancy data.
CHALLENGES AND IMPROVEMENT OPPORTUNITIES The implementation of the NRCs space reductions will present a series of challenges to the agency, both tangible and intangible. When evaluating opportunities to reduce space, the first priority and consideration is to assess and weigh the NRCs continued ability to perform mission-essential functions, without interruption, within the space allotted. Each space reduction project will require an initial investment to reconfigure and furnish space before any consolidation or disposal. NRC must complete a cost-benefit analysis to determine the financial feasibility of each project before its initiation, as well as be allotted the necessary resources. Each analysis will weigh the initial investment against the projected timing and amount of savings to determine if the project is beneficial to the agency. Other factors to be taken into consideration are the lease terms and severability of individual leases and OAs. If the amount of time required to realize a cost savings
14 is longer than the remaining term on the locations lease, the project may not be feasible.
The majority of the NRCs OAs are non-cancelable, meaning the agency will still be responsible for the lease costs of any space relinquished until such time as the lease expires or GSA is able to find a backfill tenant. The marketability and demand for space at each location must be taken into consideration when estimating the cost savings. The demand for space in each of the NRCs locations will be a determining factor in GSAs ability to backfill relinquished space in sufficient time to realize cost savings relative to each leases expiration. In the regional office locations, given the anticipated continuing need at each location, the availability and projected costs of alternate space versus the reconfiguration of existing space will need to be analyzed, as individual leases expire.
Another consideration in the regions is the agencys continuity of operations plans (COOP) and relocation sites. The NRCs space reduction plans need to consider the agencys requirement for a sufficient presence in the regions to accommodate a COOP scenario. Another challenge is the use and cost of technology and the changing work environment. One of the drivers for a smaller space footprint is the anticipation that the NRCs work environment will evolve as technology evolves, allowing for a more mobile workforce. The agency will need to budget for and fund the new technology necessary to support these new work modes. To be successful, the agency must also create acceptance of this evolution, which will depend heavily upon a successful change management initiative. Finally, a successful space plan will depend upon the agencys ability to accurately forecast the future workload and staffing requirements given the current state of the nuclear industry.
The primary program improvement opportunities are related to the agencys commitment to improve the utilization rates for both the headquarters and regional office locations by releasing additional USF.
Respectfully submitted, Mary C. Muessle, Senior Real Property Officer Office of Administration Signed by: Mary C. Muessle Mary C.
Muessle Digitally signed by Mary C. Muessle Date: 2019.09.19 15:37:42