MONTHYEARML24036A0162024-02-0101 February 2024 NRC Email - Acknowledge and Accept the Indian Point Energy Center Request to Be Removed from NRC Headquarters Operation Officer (Hoo) Morning Authentication Code Calls ML23341A2002023-12-0707 December 2023 Email - Indian Point Energy Center Generating Units 1, 2, and 3 – Implementation Notice of Amendment No. 67, 300 and 276 to Independent Spent Fuel Storage Installation Only Emergency Plan (Ioep) ML23332A0802023-11-0808 November 2023 – Email from State of New York on the Revised License Amendment for Indian Point Energy Center ISFSI Only Emergency Plan ML23331A9542023-11-0808 November 2023 Email - State of New York Comments on the Revised License Amendment for Indian Point Unit 2 and 3 Technical Specification Changes Reflecting Permanent Removal of Spent Fuel ML23325A1632023-11-0808 November 2023 – State of New York Comments on the Revised License Amendment for Indian Point Unit 2 and 3 Technical Specification Changes Reflecting Permanent Removal of Spent Fuel ML23144A3382023-05-25025 May 2023 Dawn Giambalvo of Jersey City, New Jersey Email Against Treated Water Release from Indian Point Site ML23144A3422023-05-25025 May 2023 Peter Duda of Pearl River, New York Email Against Treated Water Release from Indian Point Site ML23144A3452023-05-25025 May 2023 Adam Kahn of Monsey, New York Email Against Treated Water Release from Indian Point Site ML23144A3502023-05-25025 May 2023 Dan Kwilecki of Montebello, New York Email Against Treated Water Release from Indian Point Site ML23144A3392023-05-25025 May 2023 David Morris of New City, New York Email Against Treated Water Release from Indian Point Site ML23144A3442023-05-25025 May 2023 Peggy Kurtz of Rockland County, New York Email Against Treated Water Release from Indian Point Site ML23136B1622023-05-15015 May 2023 – Town of North Salem, County of Westchester, New York Board Resolution Letter Regarding Treated Water Release from Indian Point Site ML23109A0632023-04-17017 April 2023 Email Acceptance Review for IP2 and IP3 Amended Facility License and Technical Specification to Reflect Permanent Removal of Spent Fuel from Spent Fuel Pits ML23055A1112023-02-23023 February 2023 Alyse Peterson Email- NYSERDA No Comments on Indian Point Unit 2 - Regarding Holtec License Amendment Request to Revise Permanently Defueled Technical Specifications and Staffing Requirements with Spent Fuel Transfer to ISFSI (Dockets 50-24 ML23049A0032023-02-14014 February 2023 – NRC Acceptance Email to Holtec for License Amendment Request for Approval of New ISFSI-Only Emergency Plan and Associated EAL Scheme ML22313A1682022-11-0909 November 2022 NRC Response to Updates to the Proposed Amended IP2 Master Trust ML22308A0912022-11-0303 November 2022 Email Acknowledgement for IP2 and IP3 Amended Facility License and Technical Specification to Reflect Permanent Removal of Spent Fuel from Spent Fuel Pits ML22276A1642022-09-29029 September 2022 New York State Revised Draft EA Response E-Mail ML22271A8492022-09-28028 September 2022 E-Mail Transmitting Revised Indian Point Exemption Draft EA ML22269A3452022-09-22022 September 2022 Email Objection to Holtec IP2 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 1 and 2, EPID L-2022-LLA-0072 ML22259A1992022-09-0202 September 2022 Acceptance for License Amendment Request to Modify Staffing Requirements Following SFP Transfer to Dry Storage ML22265A0142022-08-31031 August 2022 Email Acknowledgement for Amended and Restated Holtec IP3 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 3 ML22242A2592022-08-19019 August 2022 E-mail from K. Sturzebecher, NRC, to B. Noval, HDI, Acknowledgement for Amended and Restated Holtec IP2 Master Decommissioning Trust Agreement for Indian Point Nuclear Generating Facility Unit 1 and 2 ML22228A1332022-08-0909 August 2022 Acknowledgement for License Amendment Request to Modify Staffing Requirements Following SFP Transfer to Dry Storage ML22215A0432022-08-0101 August 2022 E-Mail Transmitting NYS NSA Exemption Comments & Draft EA Review Completion ML22208A0292022-07-19019 July 2022 E-Mail Transmitting Indian Point Exemption Draft EA ML22168A0072022-06-16016 June 2022 Acceptance Review for License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML22112A0102022-04-21021 April 2022 Acceptance Review: Request for Exemption from 10 CFR 50.54(w)(1) Concerning Indian Point Energy Center Onsite Property Damage Insurance ML22112A0122022-04-21021 April 2022 Acceptance Review: Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance for Indian Point Energy Center ML22103A2432022-04-13013 April 2022 E-mail - Request for Additional Information - License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme for Permanently Defueled Condition for Indian Point Energy Center ML22104A0342022-04-13013 April 2022 E-mail from Z. Cruz, NRC to J. Fleming, Holtec - Request for Additional Information Related to Request for Exemption from Portions of 10 CFR 50.47 and Part 50 Appendix E for Indian Point Energy Center ML22038A2572022-02-0707 February 2022 E-mail from Z. Cruz, NRC, to J. Fleming, HDI - Acceptance Review: License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme to Address Permanently Defueled Condition for Indian Point Energy Center ML22035A1862022-02-0404 February 2022 E-mail to J. Fleming, Holtec, from Z. Cruz Perez, NRC - Acceptance Review: Exemption Requests from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E, Section IV for Indian Point Energy Center ML22028A1032022-01-28028 January 2022 E-mail Dated 1/28/2022, Transmittal of Draft Safety Evaluation for Proposed License Amendment Revision to Licensing Basis to Incorporate the Installation and Use of of New Auxiliary Lifting Device ML22038A1592022-01-24024 January 2022 NRR E-mail Capture - (External_Sender) 2021 IPEC Annual Sturgeon Impingement Report ML22006A0442022-01-0505 January 2022 Email from Z Cruz to J Fleming Request for Additional Information - HDI Indian Point Post-Shutdown Decommissioning Activities Report ML21337A2952021-12-0303 December 2021 Subsequent Request for Additional Information License Amendment Request to Revise Licensing Basis for New Auxiliary Lifting Device (E-mail Dated 12/3/2021) ML21335A3692021-12-0101 December 2021 Acceptance Review: Indian Point Energy Center - Exemption Request from 10 CFR Part 20 App G Section Iii.E ML21266A2972021-08-18018 August 2021 8/18/2021 E-mail from H. Specter to R. Guzman Public Comments to NRC, Indian Point Post-Shutdown Decommissioning Activities Report Public Meeting on July 29, 2021 ML21225A5012021-08-0909 August 2021 Email from NRC to the Shinnecock Indian Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21224A3032021-08-0909 August 2021 Email from NRC to the Mashantucket Pequot Tribe of Connecticut Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A6142021-08-0909 August 2021 Email from NRC to the Tuscarora Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A5682021-08-0909 August 2021 Email from NRC to the Stockbridge-Munsee Community Band of Mohican Indians Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A4252021-08-0909 August 2021 Email from NRC to the Oneida Nation of Wisconsin Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A3142021-08-0606 August 2021 Email from NRC to the Oneida Indian Nation Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A4402021-08-0606 August 2021 Email from NRC to the Onondaga Nation of Wisconsin Announcing the IPEC PSDAR Meeting on August 18, 2021 ML21225A5352021-08-0606 August 2021 Email from NRC to the Tonawanda Band of Seneca Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21225A5462021-08-0606 August 2021 Email from NRC to the St. Regis Mohawk Tribe Announcing the IPEC PSDAR Public Meeting on August 18, 2021 ML21266A2942021-07-25025 July 2021 E-mail from Paul Blanch to NRC (N. Sheehan, D. Screnci) Public Comments to NRC, Indian Point Post-Shutdown Decommissioning Activities Report Public Meeting, July 29, 2021 ML21197A2002021-07-16016 July 2021 (E-mail 7/16/2021) NRC Staff Assessment and RAI Closeout HDI Fleet Decommissioning Quality Assurance Program and Indian Point Energy Center Quality Assurance Program Manual 2024-02-01
[Table view] Category:Operating Plan
MONTHYEARML20069A7592020-03-0909 March 2020 Evaluation Plan - the NRCs Expert Evaluation Team on Concerns Pertaining to Indian Point NL-13-042, Overall Integrated Plan in Response to March 12, 2012, Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2013-02-28028 February 2013 Overall Integrated Plan in Response to March 12, 2012, Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ML0713100382007-02-0606 February 2007 E-Mail from J. Adler of Entergy to J. White of USNRC, Regarding QC Summary ML0713005492007-01-22022 January 2007 E-Mail from J. Noggle of USNRC to J. Williams of U. S. Geological Survey, T. Rice of NYSDEC, L. Rosenmann of NYSDEC and T. Nicholson, Regarding Tracer Test Plan ML0704004722006-12-21021 December 2006 E-Mail from G. Hinrichs of Entergy to T. Rice of Department of Environmental Conservation and J. White and J. Noggle of USNRC, Regarding Tracer Test Plan ML0833805762003-04-11011 April 2003 SEIS Reference - Orange County Comprehensive Plan: Strategies for Quality Communities 2020-03-09
[Table view] |
Text
QC summary Page 1 of 1 John White - QC summary From: "Adler, Joseph J." <jadler@entergy.com>
To: "John White" <JRW1@nrc.gov>
Date: 02/06/2007 12:42 PM
Subject:
QC summary CC: "James Kottan" <JJK@nrc.gov>, "Hinrichs, Gary H"
<ghinric@entergy.com>, "Croulet, Donald K"
<dcroule @entergy.com>
- John, Attached is a summary of the QC protocol that IPEC is instituting for the ground water program.
Jay Adler <<Areva QC Protocol.pdf>>
file://C:\temp\GW }00001.HTM 04/11/2007
REVISIONS TO:
WORKPLAN FOR A GROUNDWATER TRACING STUDY AT INDIAN POINT NUCLEAR POWER PLANT BUCHANAN, NEW YORK January 31, 2007 Philip Moss, RG and PG Senior Geologist Ozark Underground Laboratory, Inc.
And GZA GeoEnvironmental Inc.
FOR Indian Point Energy Center 450 Broadway Buchanan, New York 10511
The investigative approach has changed in a number of ways since the August 2006 draft of the workplan, including some refinements to the sampling network for groundwater tracing studies at Indian Point. We anticipate that further minor changes may be deemed necessary in order to achieve the goals of the groundwater tracing study.
Purpose of the Study The primary purpose of the study is to create a series of dye plumes at Indian Point which are expected to be very similar to the plumes of radioactive contaminants that currently are present at the site. If the dye plumes are very similar to the contaminant plumes, then the sources of radioactive contamination must have been very close to the dye introduction points. If there is poor correspondence among the plumes, then we must conclude that the source areas are or were not very close to the dye introduction points.
Other purposes of the investigation include obtaining empirical groundwater velocity data for both the dye front and the peak dye concentration, and providing a tool for estimating the radioactive contaminant load being discharged into the Hudson River.
This is made possible by having detectable concentrations of dye in the river, in spite of undetectable radioactive contamination in the river. It is likely that radioactive contamination is being discharged into the Hudson River, but in quantities that are below detection limits. We can correlate concentrations of dye with concentrations of contaminants where both are detectable and extrapolate to areas where only dye is detectable.
Modifications in Approach
- 1. There will be four dye introductions, one in the Unit 2 Fuel Storage Building, two traces near Unit 1, and one trace into a pipeline that runs south of Unit 1.
- 2. Instead of all dyes being introduced on the same day, we anticipate that the Unit 2 dye trace will be completed prior to the introduction of the three remaining traces and that the three remaining traces will be started on the same day or as close together chronologically as possible.
- 3. Instead of most of the wells and catch basins being sampled intensively, we now plan to have two different sampling schedules. A high intensity network that will be sampled on the schedule found in Revision 1 of the Workplan (August 2006), and a low intensity network that will be sampled every other week. It is our intention to have a halo of sampling locations that are outside the dye plumes. We plan to adjust the sampling network as needed to maintain the halo of nondetections. We believe that the nondetections are necessary for defining the limits of the plumes.
- 4. Philip Moss of the Ozark Underground Laboratory (OUL) will be onsite as needed to assist with the high frequency sampling period for the first trace.
I
- 5. OUL will assist GZA in obtaining field supplies as needed.
- 6. Any or all dye introduction points will be tested for their ability to transmit adequate quantities of water (at least one gallon minute) into the groundwater system if deemed necessary by OUL personnel.
Consequences of the Modifications
" The duration of tracing will be about twice as long as previously planned.
" Significantly more samples will be collected, shipped, and analyzed.
- A progress report will be drafted following the completion of the first dye trace.
" There will have appreciably more fieldwork, report writing, and travel.
The high and low intensity sampling network locations for the Unit 2 Trace are listed below. These sampling locations were selected by David Winslow and Philip Moss.
High Intensity Network for the Unit 2 Trace Hudson River D/S MW-37-57 MW-59-A Hudson River U/S MW-49-26 MW-59-B Hudson River Unit 3 MW-49-42 MW-60 intake MW-49-65 MW-63 MW-30 MW-50-42 MW 18 MW-31 MW-50-67 MW 35 MW-32 MW-52-A,B,C,D MW-62 MW-33 MW-52-12 MW-62-18 MW-34 MW-53-82 MW-62-35 MW-35 MW-53-120 MW-66 MW-36-26 MW-54 MW-111 MW-36-41 MW-57-11 1-2 MW-36-53 MW-57-20 MH-5 MW-37-22 MW-57-45 MH-6 MW-37-32 MW-58-28 HR-1 MW-37-40 MW-58-65 U3-C1 U2-C1 2
Low Intensity Network for the Unit 2 Trace MW-38 MW-45-43 MW-56-85 MW-39 (67', 86', 100') MW-45-62 MW-65A (39')
MW-41-15 MW-46 MW-65B (74'))
MW-41-42 MW-47-56 MW-107 MW-41-64 MW-47-80 Sump MW-42-51 MW-55-24 North Curtain Drain MW-42-79 MW-55-34 U3-3 MW-44-67 MW-55-54 U3-4D MW-44-104 MW-56-55 The networks for the remaining traces have not been entirely resolved as of this date and will be finalized prior to dye injection at Unit 1.
3
Entergy - Indian Point Groundwater Batch QC Protocol (Groundwaters only)
All groundwater samples received Monday through Friday for a given week will be considered a batch.
- 2. AREVA NP will make every effort to ensure that the following batch QC samples are included with each batch:
- a. One Laboratory Control Standard (LCS) per twenty samples.
- b. One Matrix Spike (MS) per twenty samples.
- c. One Split Sample per twenty samples
- d. One Analytical Blank (AB) per twenty samples.
- 3. The LCS and MS will be spiked with an activity concentration approximately ten (10) times the required MDC.
- a. The LCS will be prepared as a DI spike.
- b. The matrix spike will be prepared by taking an aliquot of the sample for each analysis required. An analyte for that analysis will be direct spiked into the aliquot and processed.
- c. AREVA NP will select one sample in the batch for use as a split sample.
- 4. Quality Control Sample Performance\Acceptance Limits
- a. Split samples shall be evaluated for acceptability using the same acceptance criteria as that used for Matrix Spikes (MS) and Laboratory Control Spikes (LCS) (see 4.b below) with the additional criteria that the results may also be acceptable if the two results cross at the 2-sigma uncertainty level (as described in the AREVA NP Environmental Laboratory Quality Assurance Manual 100 and the equation below).
Duplicate/Split Sample Results are Acceptable if:
(Result 1 - Result 2) < ( 2-sigma Unc. Result I + 2-sigma Unc. Result 2)
- b. LCS/MS samples shall be evaluated for acceptability by determining the Relative Percent Difference (RPD), or Bias, in accordance with the following calculation:
RPD/Bias ((analysis result -known value)/ known value)
- 100 The resultant RPD value is then compared to the limits specified in the table below.
Bias Acceptance Bias Acceptance Criteria for Samples Criteria for Samples Radionuclide/Category 1-10 Times MDC >10 Times MDC Tritium 30% 15%
Gamma Emitters 25% 20%
Beta Only (except Sr-90) 60% 30%
Sr-90 30% 20%
Alpha Emitters 60% 30%
ý I . ý
- c. Analytical Blanks (AB) shall be evaluated using the acceptance limit stated in the AREVA NP Environmental Laboratory Quality Assurance Manual 100, that is, the reported value shall be less than 3 times the stated 1-sigma uncertainty.
- d. For any Quality Control value listed above that fails to meet the stated acceptance limit, an explanatory note shall be provided in the QC Summary Report for the specific batch.
- 5. The sample turnaround time will not start until all samples are received and accepted for analysis.
Entergy Indian Point Approval of Batch QC Protocol