TXU Power TXU Power Comanche Peak Steam Electric Station P. O. Box 1002 (EO1)
Glen Rose, TX 76043 Tel: 254 897 5209 Fax: 254 897 6652 mike.blevinsbtxu.com Mike Blevins Senior Vice President &
Chief Nuclear Officer CPSES-200500378 Log # TXX-05036 February 21, 2005 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 TRANSMITTAL OF SECOND-HALF 2004 FITNESS-FOR-DUTY PROGRAM PERFORMANCE DATA Gentlemen:
Attached are CPSES Fitness-For-Duty Program Performance data for the six month period of Julyl, 2004 through December 31, 2004. The data required by I OCFR26.71 (d) are provided on standard forms with the exception of the summary of management actions and list of events reported, which are provided on a separate page titled "Summary of Management Action." This communication contains no new or revised commitments.
If there are any questions, please contact Mr. James Brown at (254) 897-8912.
y11ODc)A A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Comanche Peak
- Diablo Canyon Palo Verde South Texas Project Wolf Creek
TXX-05036 Page 2 of 2 Sincerely, TXU Generation Company LP By:
TXU Generation Management Company LLC Its General Partner Mike Blevins NSH Attachments c -
B. S. Mallett, Region IV W. D. Johnson, Region IV M. C. Thadani, NRR Resident Inspectors, CPSES
Attachments to TXX-05036 (3 Pages)
Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 TXU Power December 31, 2004 6 Months Ending Company Comanche Peak Steam Electric Station Location James E. Brown, Security Coordinator (254) 897-8912 Phone (including area code)
Contact Name Cutoffs:
Screen/Confirmation (ng/rl Marijuana 50
/ 15 Cocaine 300
/ 150 Opiates 300
/ 300
[E]
Appendix A to 10 CFR 26 Amphetamines 1000 / 500 Phencyclidine 25 / 25 Alcohol (% BAC) 0.04%
Testing Results Licensee Employees Long-Term Short-Term l
Contractor Personnel Contractor Personnel Average Number with 929 509 Unescorted Access Categories Tested Positive Tested Positive Tested Positive Pre-Access 18 0
0 0
106 1
For Cause Post-accident 0
0 0
0 1
0 Observed behavior 0
0 0
0 1
1 Random 291 1
0 0
147 0
Follow-up 5
0 0
0 0
Other**
5 0
0 7
0 Total l
319 1
l l
l 262 2
ti Breakdown of Confirmed Positive Tests for Specific Substances Marijuana Cocaine Opiates Amphe-Phency Alcohol Refusal 1
2 3
4 5
tamines clidine to Test Licensee Employees 1
Long-Term Contractors
=
=
=
liShort Term Contractors 1
1 A
Total I
I I
I I _
I 2
=
==__J I I I -I ll 3
i i I
£ 2 1_
_11
SUMMARY
OF MANAGEMENT ACTIONS And STATISTICAL ANALYSIS FOR REPORTING PERIOD JULY THROUGH DECEMBER 2004 Analysis of the data indicates that 56 percent of the average eligible population was randomly tested during the period July through December 2004.
The total positive test for this period was 3. Short-term contractor personnel accounted for 2 positive tests and a licensee employee accounted for 1 positive test.
TXU Power submitted blind performance specimens in accordance with 10 CFR 26, Appendix A, Section 2.8 (e)(2), requirements. There were no reportable events.
Activities associated with NEI 03-01 Rev. 1 were implemented on October 29, 2004.
One event was reported by telephone under 1 OCFR26.73. A supervisor tested positive for alcohol on a random screen. There were no significant events reported during this period.