BVY-94-104, Responds to Operational Safeguards Response Evaluation Conducted at VT Yankee Nuclear Power Station.Util Purchasing Several Reinforced Concrete Structures (Planters) to Be Strategically Placed in Area Identified in Listed Issue

From kanterella
Jump to navigation Jump to search

Responds to Operational Safeguards Response Evaluation Conducted at VT Yankee Nuclear Power Station.Util Purchasing Several Reinforced Concrete Structures (Planters) to Be Strategically Placed in Area Identified in Listed Issue
ML20078E441
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 11/04/1994
From: Reid D
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BVY-94-104, TAC-M89698, NUDOCS 9411140051
Download: ML20078E441 (2)


Text

o ,

. J.

  • VERMONT YANKEE NUCLEAI1 POWER CORPORATION

. Ferry Road, Brattleboro, VT 05301-7002

]

s Y

! BVY 94-104 November 4,1994 ,

l (802) 257-5271 United States Nuclear Regulatory Commission i ATfN: Document Control Desk Washington, DC 20555

References:

a) License No. DPR-28 (Docket No. 50-271) b) Letter, USNRC to VYNPC, NVY 94-159, dated 9/14/94.

Subject:

Response to Operational Safeguards Response Evaluation

Dear Sir:

Pursuant to Reference b) enclosed is our response to the Operational Safeguards Response Evaluation (OSRE) conducted at Vermont Yankee Nuclear Power Station. The attachment specifically addresses the issue identified in your report.

We trust the attached information is responsive to your request. If you require additional information please feel free to contact us.

Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION c c- Y Donald A. Reid Vice President, Operations

Enclosure:

Attachment A - VY Response to the OSRE Report cc: w/o enclosure USNRC Region 1 Administrator USNRC Senior Resident inspector - VYNPS o$

9411140051 941104 pDR ADOCK 05000271 A s u v ., v FDR

w. _

ATTACHMENT A VERMONT YANKEE RESPONSE TO THE OPERATIONAL SAFEGUARDS RESPONSE EVALUATION (OSRE) REPORT This attachment contains the Vermont Yankee Nuclear Power Corporation (VYNPC) response to the issue identified in the USNRC OSRE report TAC No. M89698, dated September 14, 1994. VYNPC concurs with the NRC position on the identified issue and has initiated the following corrective action noted below.

ISSUE:

Under one specific set of circumstances, a significant number of response force members might not be able to reach their deployment positions.

CORRECTIVE ACTION:

VYNPC is purchasing several reinforced concrete structures (planters) to be strategically placed in the area identified in the above issue. The structures will provide a protective corridor for responding security force personnel. Similar structures are currently being used in the same general application at a consulate building located in Washington, DC. The procurement and installation of these structures will be completed no later than the end of this calendar year, December 31,1994.