BVY-93-121, Forwards Proposed Vermont Yankee Self-Assessment Plan, Service Water Operational Performance Insp, in Response to GL 89-13.Some Features of Plan Clarified or Specifically Stated,Since 931020 Presentation of Draft Plan to Region I

From kanterella
Jump to navigation Jump to search
Forwards Proposed Vermont Yankee Self-Assessment Plan, Service Water Operational Performance Insp, in Response to GL 89-13.Some Features of Plan Clarified or Specifically Stated,Since 931020 Presentation of Draft Plan to Region I
ML20059F200
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 10/28/1993
From: Pelletier J
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20059F205 List:
References
BVY-93-121, GL-89-13, NUDOCS 9311040173
Download: ML20059F200 (1)


Text

-g .-

L VEfM10NT YANKEE NUGLEdR POWER CORPORATION

. ks Ferry Road, Brattleboro, VT 05301-7002 g ENGINEERING OFFICE

' SBO MAIN STREET BOLTON. MA 01740 -

(508) 779-6711 October 28,1993 BVY 93-121 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

References:

a) License No. DPR-28 (Docket No. 50-271) b) Letter VYNPC to USNRC, Service Water System Operational Performance Inspection, 09/14/93, BVY 93-101 c) Letter USNRC to VYNPC, Service Water Operational Performance Inspection at VY,07/27/93

Subject:

VERMONT YANKEE'S SELF ASSESSMENT PLAN FOR THE SERVICE WATER SYSTEM Attached please find the proposed Vermont Yankee Self-Assessment Plan for a Service Water Operational Performance inspection. A draft of this plan was presented to Region I staff on October 20, 1993, and this formal submittal is substantially unchanged from that draft. Several features of our plan have been clarified or specifically stated; the schedule has been changed slightly and an alternative Surveillance and Testing Reviewer with experience in the service water area has been named to the team.

We appreciate your consideration of our proposal and look forward to your reply.

Sincerely, VERMONTYANKEE NUCLEAR POWERCORP.

030070 JQ James P. Pelletier Vice President, Engineering cc: USNRC Region l Administrator USNRC Resident inspector - VYNPS i USNRC Project Manager - VYNPS 9311040173 931028- E PDR ADOCK'05000271 M G PDR y